EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf

PDF 28 MB Posted

Attached to
Fire Rescue Headquarters and Training Facility Feasibility Study
Solicitation number
26-10
Issued by
Glades County, Florida

About this file

This is a technical exhibit document from the Florida Department of Transportation (FDOT) dated November 2019 depicting a typical roadway cross-section design standard. The document serves as a reference guide for engineering design specifications and appears to support the West Bay Parkway Engineering Design Services project, which involves designing a new two-lane roadway with a shared use path and preliminary bridge engineering across the Intracoastal Waterway in Bay County, Florida. The project extends from the powerline easement north of US Highway 98 to the Bay County/Walton County line, with its southern connection adjoining the existing West Bay Parkway constructed by the St. Joe Company. Engineering firms must be licensed to practice in Florida and certified by FDOT, with required submissions including survey, geotechnical analysis, roadway design, preliminary bridge design, stormwater design, and right-of-way identification. The solicitation was issued under Florida's Consultants' Competitive Negotiation Act (Chapter 287.055, Laws of Florida), with proposers evaluated on qualifications, relevant experience, understanding of project scope, and cost proposals.

The project is funded through the FDOT Transportation Regional Incentive Program (TRIP), with funding project number 453941-4-34-01 and Contract G3210. The typical section exhibit provides standardized design parameters and cross-sectional details that proposing firms must incorporate into their engineering design plans to ensure consistency with FDOT standards and specifications. This reference document establishes the baseline design criteria that qualified engineering consultants must follow when developing the complete engineering design package for the West Bay Parkway project.

View the file

Other files

File Type Posted
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT_(Addendum_#4_Revision).pdf PDF
HURRICANE_SPECIAL_NEEDS_SHELTER_RETROFIT.pdf PDF
RFP_26-10_Hurricane_Special_Needs_Shelter_-_LEGAL_ADVERTISEMENT.docx DOCX document
2425301_Revised_Electrical_Drawings_111825_Signe.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_4_Engineering_Study_March_12_2024.pdf PDF
Addendum_#5_Electrical_Study._Revised.pdf PDF
Addendum_#5_Design_Specifications_Rev_2.pdf PDF
ITB_2612_Construction_Special_Needs_Shelter_Att_5_Engineering_Drawings_Specifications.pdf PDF
RFP_26-10_Construction_Special_Needs_Shelter_Engineering_Study.pdf PDF
Special_Needs_Retrofit_MOD_#2_-_Fully_Executed_Contract.pdf PDF
Special_Needs_Agreement_Mod_#1.pdf PDF
special_needs_agreement.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Fire_Rescue_Headquarters_and_Training_Facility_Feasibility_Study.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
Attachement_I_-_BFD_June_20_2022_Presentation.pdf PDF
West_Bay_Parkway_Engineering_Design_Services_(Addendum_#1_Revision).pdf PDF
West_Bay_Parkway_Engineering_Design_Services.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK.pdf PDF
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_A_-_SCOPE_OF_WORK_(OCA_Edit).docx DOCX document
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_E-_Engineer_Performance_Review_Template_FILLABLE.pdf PDF
EXHIBIT_F-_Funding_Agreement_Walton-St._Joe-Grant_No._G3210.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_B-_Typical_Section_PER_November_2019_FDOT.pdf PDF
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
EXHIBIT_G-Supplemental_Agreement_No._1_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_C-_WBP_Seg_1_PER_November_2019_FDOT.pdf PDF
EXHIBIT_H-_Supplemental_Agreement_No._2_TRIP_Grant_Agreement.pdf PDF
EXHIBIT_A-_SCOPE_OF_WORK.docx DOCX document
EXHIBIT_D-_FDOT_TRIP_GRANT_AGREEMENT.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .