Exhibit B SOW and Map.pdf
PDF 282 KB Posted
- Solicitation number
- DQ1 BAAA 2026000295 2
- Issued by
- Boulder County, Aurora City, Colorado
About this file
This is a Scope of Work document for the Colorado Department of Agriculture (CDA) regarding an asphalt replacement project located at 305 Interlocken Parkway, Broomfield, Colorado. The project involves milling and overlaying approximately 80,475 square feet of asphalt to a depth of 2 inches. The work scope requires the contractor to mill the proposed area, haul and dispose of asphalt millings off-site, clean the milled surface, apply a tack coat for adhesion, install new asphalt to approximately 2 inches depth, and roll and compact the material in place. Additionally, the contractor must restripe the parking lot to match the existing layout, which includes approximately 169 parking stalls and 6 handicap stencils.
The document does not contain information regarding pricing terms, set-asides, response dates, due dates, award timelines, or funding sources. No map details are provided beyond the location specification, and no additional contract terms or renewal options are described in this scope of work excerpt.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit B: Scope of Work
A. Mill and Overlay approximately
i. 80,475 sq ft up to a depth of 2 inches
ii. Property: Colorado Department of Agriculture
iii. Location: 305 Interlocken Parkway, Broomfield, CO 80021
B. Requirements
i. Mill proposed area, haul and dispose of asphalt millings off-site.
ii. Clean milled surface and apply Tack Coat for adhesion
iii. Install asphalt to the depth of approximately 2 inches. Roll and compact in place.
iv. Restripe parking lot to match existing layout. Approximately 169 parking stalls and 6 handicap stencils.
C. Map
| A. Mill and Overlay approximately |
| i. 80,475 sq ft up to a depth of 2 inches |
| ii. Property: Colorado Department of Agriculture |
| iii. Location: 305 Interlocken Parkway, Broomfield, CO 80021 |
| B. Requirements |
| i. Mill proposed area, haul and dispose of asphalt millings off-site. |
| ii. Clean milled surface and apply Tack Coat for adhesion |
| iii. Install asphalt to the depth of approximately 2 inches. Roll and compact in place. |
| iv. Restripe parking lot to match existing layout. Approximately 169 parking stalls and 6 handicap stencils. |
C. Map
File details come from the government source that posted it. Updated .