Exhibit B, Rate Sheet.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- ECMC Orphan Well Program MTOC
- Solicitation number
- RFP PHAA 20260000000000000002 2
- Issued by
- Colorado
About this file
This is a Rate Sheet (Exhibit B) for the ECMC Orphan Well Program Main Task Order Contracts in Colorado, establishing a comprehensive pricing schedule for environmental remediation services related to orphan well decommissioning. The scope encompasses 18 primary service categories including pre and post plugging methane emissions monitoring, well plugging, wellhead cutting and capping, production equipment decommissioning, flowline removal and abandonment, well shut-in operations, monitoring and sampling activities, TENORM testing, waste management (liquid and solid), stormwater controls, site restoration (backfill, grading, recontouring, seedbed preparation, planting, and weed control), fencing installation, and soil analysis. The rate sheet structure allows bidders to select which service sections their firm will provide by checking corresponding boxes, with proposals evaluated separately for each selected section.
The pricing structure requires bidders to submit unit costs for 24 labor classifications (ranging from administrative assistants to senior program managers and specialized welders), crew compositions (1 to 4 person crews with trucks), mileage and mobilization fees, ancillary services such as stormwater permit preparation and SWMP inspections, and over 130 pieces of equipment with dual pricing options for hourly and daily rates. All pricing must exclude per diem costs for lodging and meals, with contractors reimbursed separately using CONUS rates from GSA sources. Equipment and services may be provided directly or subcontracted. The contract term covers fiscal years 2027 through 2031, establishing a five-year master task order framework for environmental remediation services under the ECMC program.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract Rate Schedule for ECMC FY27-31 Main Task Order Contracts | Instruction TWO: For an opportunity to receive the highest rating, please fill out all cost lines of the Bidder's Unit Cost column corresponding to pricing items for the checked boxes at left. Bidders are invited to use their judgment for which lines to complete. Also add information in notes to clarify if necessary. If the labor title is not used in your firm, please supply an alternative labor title in the Notes column. |
| IMPORTANT Instruction ONE: Click a checkbox for each section of the scope your firm hopes to be contracted to provide. Your proposal will be evaluated separately for each section you check. You may check 1 box, 7 boxes, or any combo in between. | Instruction THREE: Please exclude all per diem costs for any line in this table that may include lodging and meal charges. Contractors with task order needing per diem reimbursement will use CONUS rates from https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-results?action=perdiems_report&fiscal_year=2026&state=CO&city=&zip= |
| Scope Section | Please Evaluate My Firm's Proposal For this Service | |||||||
| (check box) | Description of Labor Type or Service | Bidder's Unit Cost Equipment that is owned or under long term lease) | Units* | |||||
| (per hour, per DAY, etc.) | Service not provided | Notes (only if necess.) | ||||||
| Labor | ||||||||
| 3 - Pre and Post Plugging Methane Emissions | FALSE | Administrative Assistant | $0.00 | HR | FALSE | |||
| 4 - Plug Wells | FALSE | Associate Engineer/Scientist | $0.00 | HR | FALSE | |||
| 5 - Cut and Cap Wellhead | FALSE | Clerical Assistant | $0.00 | HR | FALSE | |||
| 6 - Decommission Production Equipment | FALSE | Construction/Field Supervisor | $0.00 | HR | FALSE | |||
| 7 - Remove/Abandon Flowlines | FALSE | Drafter w/ CAD/GIS | $0.00 | HR | FALSE | |||
| 8 - Shut-in Wells and Temporarily Decommission Equipment | FALSE | Field Technician I | $0.00 | HR | FALSE | |||
| 9 - Monitoring and Sampling | FALSE | Field Technician II | $0.00 | HR | FALSE | |||
| 10 - TENORM Testing | FALSE | General | $0.00 | HR | FALSE | |||
| 11 - Liquid Waste Management | FALSE | Inspector | $0.00 | HR | FALSE | |||
| 12 - Solid Waste Management | FALSE | Operator/CDL | $0.00 | HR | FALSE | |||
| 13 - Stormwater Controls | FALSE | Principal Engineer/Scientist | $0.00 | HR | FALSE | |||
| 14 - Backfill, Grading, And Re-Conturing | FALSE | Professional Litigation Support | $0.00 | HR | FALSE | |||
| 15 - Seedbed Preparation And Planting | FALSE | Project Engineer/Scientist I | $0.00 | HR | FALSE | |||
| 16 - Weed Control | FALSE | Project Engineer/Scientist II | $0.00 | HR | FALSE | |||
| 17 - Fencing | FALSE | Project Manager/Engineer/Sci | $0.00 | HR | FALSE | |||
| 18 - Soil Analysis | FALSE | Senior Engineer/Scientist | $0.00 | HR | FALSE | |||
| Senior Program Manager | $0.00 | HR | FALSE | |||||
| Staff Engineer/Scientist | $0.00 | HR | FALSE | |||||
| Submittals | $0.00 | HR | FALSE | |||||
| Welder | $0.00 | HR | FALSE | |||||
| Welder Helper | $0.00 | HR | FALSE | |||||
| FALSE | ||||||||
| SWMP - Preparation, Fees, Inspections | $0.00 | EACH | FALSE | |||||
| Storm Water Discharge Permit/Fees | $0.00 | EACH | FALSE | |||||
| FALSE | ||||||||
| 1 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| 2 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| 3 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| 4 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| FALSE | ||||||||
| Vehicle Mileage | $0.00 | Mile | FALSE | |||||
| Mob/Demob | $0.00 | Mile | FALSE |
| Description of Labor Type, Equipment, or Service | Bidder's Unit Cost | Units* | |||||
| (per hour, per DAY, etc.) | Bidder's Unit Cost | Units* | |||||
| (per hour, per DAY, etc.) | Service Subcontracted | Service Not Provided | Notes (only if necess.) | ||||
| EQUIPMENT | |||||||
| 0.45 micron Water Filters (large) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| 0.45 micron Water Filters (small) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| 10 Wheel Haul Truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| 18 Wheel Haul Truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Anemonmeter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| ATV | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Back Hoe Shaker Head | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Backhoe Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Backhoe - Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Bladder - Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Boom Truck/Crane | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Camera | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Colorimetric Water Test Kit | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Disposable Bailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dissolved Oxygen (DO) Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dozer D5 or equivalant | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dozer D6 or equivalant | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dozer D8 or equivalant | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dump trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dump truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Duplex Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Electrical Conductivity (EC) Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Excavator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Excavator Mini | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Field Tablet | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Flame Ionization Detector (FID) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Flatbed Trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Flow Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Foot Valve Pump/Tubing | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Fork Lift | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Four Gas Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Gas Chromatograph | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Gas Cylinder | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| GPS Unit (Navigation) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| GPS Unit (Submeter Accuracy) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Groundwater Supplies | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| H2S Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hand Auger | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hand/Power Tools | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hay Buster | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hotsy | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| IsoFlask Container | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Isotube Gas Cylinder | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Jumping Jack | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Landfill Gas Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| LEL Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Loader | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Magnehelic Gauges | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Man Lift | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Metal Detector | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Misc Field Supplies | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Motor Grader | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| MSA (Draeger) Detector Tubes | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Multi-Meter (Temp, pH, SpC) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Multi-Parameter Meter (Flow Cell) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Multi-Parameter Meter (Temp, pH, SpC, Turb, DO) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Oil/Water Interface Probe | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| ORP Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Peristaltic Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| PetroFLAG Kit | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| pH Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Photoionization Detector (PID) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Pickup Truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Pressure Gauges | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Roller Compactor | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck w/ belly dump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck w/ lowboy | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck w/ side dump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Skid Steer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Slide Hammer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Spotting Scope | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Steam Cleaner | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Submersible Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Survey Equipment - Auto Level /Tripod | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Survey Equipment - Optic Level/Tripod/Stadia Rod | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tedlar Bags | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Track Hoe - Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Track Hoe - Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tractor 100-200 HP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tractor Over 200 HP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tractor Under 100 HP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Trailer - Bumper pull | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Trailer - Gooseneck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Trash Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Turbidity Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Vac Truck Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Vac Truck Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Vacuum Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Level Indicator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Truck Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Truck Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Winch Truck | $0.00 | HR | FALSE | FALSE |
| PLUGGING | ||||||
| Base Beam | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| BOP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| BWQ Equipment Pkg | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Cast Iron Bridge Plug (CIBP) set at depth <7" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Bridge Plug (CIBP) set at depth >10" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Bridge Plug (CIBP) set at depth 7"-10" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Cement Retainer (CICR) set at depth <7" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Cement Retainer (CICR) set at depth >10" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Cement Retainer (CICR) set at depth 7"-10" | $0.00 | EACH | FALSE | FALSE | ||
| CBL | $0.00 | FT | FALSE | FALSE | ||
| Cement | $0.00 | SACK | FALSE | FALSE | ||
| Circulating Tank | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Data Logger and Transducer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Drill Bit | $0.00 | EACH | FALSE | FALSE | ||
| Drill Collars | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Fishing Tools & Crew | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| High volume incinerator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Hot Tap <6" | $0.00 | EACH | FALSE | FALSE | ||
| Hot Tap >6" | $0.00 | EACH | FALSE | FALSE | ||
| Incinerator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Lubricator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Mill Bit | $0.00 | EACH | FALSE | FALSE | ||
| Packer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Packer hand | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Perf gun | $0.00 | EACH | FALSE | FALSE | ||
| Plug/Retainer setting charge | $0.00 | EACH | FALSE | FALSE | ||
| Plugging marker - above-grade | $0.00 | EACH | FALSE | FALSE | ||
| Plugging marker - below-grade | $0.00 | EACH | FALSE | FALSE | ||
| Power Swivel | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Separator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Service Rig <150,000 lb. derrick - operating | $0.00 | HR | FALSE | FALSE | ||
| Service Rig <150,000 lb. derrick - standby | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >150,000 lb. <220,000 lb. derrick - operating | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >150,000 lb. <220,000 lb. derrick - standby | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >220,000 lb. derrick - operating | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >220,000 lb. derrick - standby | $0.00 | HR | FALSE | FALSE | ||
| Slickline | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Slickline | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Triplex Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Tubing Trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Wireline Truck & Crew | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Work String | $0.00 | FT | FALSE | FALSE |
| MATERIALS | ||||
| Cornstalks | $0.00 | TN | FALSE | FALSE |
| Culvert - 18" CMP | $0.00 | LF | FALSE | FALSE |
| Culvert - 24" CMP | $0.00 | LF | FALSE | FALSE |
| Culvert - 48" CMP | $0.00 | LF | FALSE | FALSE |
| Disposal | $0.00 | CY | FALSE | FALSE |
| Erosion Control - Blanket | $0.00 | EACH | FALSE | FALSE |
| Erosion Control - Geotextile | $0.00 | SY | FALSE | FALSE |
| Erosion Control - Rock Check Dam | $0.00 | EACH | FALSE | FALSE |
| Erosion Control - Rock Riprap | $0.00 | TN | FALSE | FALSE |
| Erosion Control - Silt Fence | $0.00 | LF | FALSE | FALSE |
| Erosion Control - Tackifier (Plantago 100 lbs/ac) | $0.00 | AC | FALSE | FALSE |
| Erosion Control - Vehicle Tracking Control | $0.00 | EACH | FALSE | FALSE |
| Erosion Control - Wattles - 9" Excelsior/Wood | $0.00 | LF | FALSE | FALSE |
| Erosion Control - Wattles - 9" Straw | $0.00 | LF | FALSE | FALSE |
| Fence - Corner post (6" + wooden post) | $0.00 | EACH | FALSE | FALSE |
| Fence - Installation | $0.00 | HR | FALSE | FALSE |
| Fence - Line Post (4" minimum wooden post) | $0.00 | EACH | FALSE | FALSE |
| Fence - Removal | $0.00 | HR | FALSE | FALSE |
| Fence - T post (7 FT post) | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube gate - 16' | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube gate - 20' | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube gate - 20' | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube Panel - 16' | $0.00 | EACH | FALSE | FALSE |
| Fence - Wire | $0.00 | LF | FALSE | FALSE |
| Fence - Wire Panel (16 FT x 50") | $0.00 | EACH | FALSE | FALSE |
| Fill Dirt | $0.00 | TN | FALSE | FALSE |
| Gravel | $0.00 | TN | FALSE | FALSE |
| Hay bale | $0.00 | TN | FALSE | FALSE |
| Road base | $0.00 | TN | FALSE | FALSE |
| Soil Analysis - Expedited | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Hydrometer | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Manure/ Compost | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Routine | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - SAR | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Soil Suitability | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Table 915 | $0.00 | EACH | FALSE | FALSE |
| Soil Collection | $0.00 | EACH | FALSE | FALSE |
| Straw bale (certified weed free) | $0.00 | TN | FALSE | FALSE |
| Top Soil | $0.00 | CY | FALSE | FALSE |
| Water | $0.00 | GAL | FALSE | FALSE |
| SEEDING / WEED MAINTENANCE | ||||
| Seeding - Decompaction | $0.00 | AC | FALSE | FALSE |
| Seeding - Drill seed | $0.00 | AC | FALSE | FALSE |
| Seeding - Fertilizer/ Soil Amendments | $0.00 | AC | FALSE | FALSE |
| Seeding - Hand seed | $0.00 | AC | FALSE | FALSE |
| Seeding - Hydromulch (Bonded Fiber matrix) min 2000 lbs/ac | $0.00 | AC | FALSE | FALSE |
| Seeding - Hydromulch (Min 2000 lbs/ac) | $0.00 | AC | FALSE | FALSE |
| Seeding - Hydroseeding | $0.00 | AC | FALSE | FALSE |
| Seeding - Mulch and Crimp | $0.00 | AC | FALSE | FALSE |
| Seeding - Plowing and Deep Ripping | $0.00 | AC | FALSE | FALSE |
| Seeding - Seed Mix | $0.00 | AC | FALSE | FALSE |
| Seeding - Seedbed prep | $0.00 | AC | FALSE | FALSE |
| Weed Maintenance - Manual | $0.00 | HR | FALSE | FALSE |
| Weed Maintenance - Monitoring | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Mowing - Brush Hog | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Mowing - Riding Mower | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Selective | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Chemical: | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Spraying BroadlEACHf | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Spraying Pre-Emergent | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Spraying Ground Sterilant | $0.00 | HR | FALSE | FALSE |
| *Abbreviations: |
| TN = ton, LS = lump sum, LF = linear foot, SY = square yard, AC = acre, CY = cubic yard, HR = hour, DAY = DAY, GAL = gallons |
https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-results?action=perdiems_report&fiscal_year=2026&state=CO&city=&zip=