Exhibit B, Rate Sheet.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- ECMC Orphan Well Program MTOC
- Solicitation number
- RFP PHAA 20260000000000000002 1
- Issued by
- Colorado
About this file
This is a rate sheet (Exhibit B) for the ECMC Orphan Well Program Main Task Order Contracts (MTOC) in Colorado. The document serves as a bidding template for contractors to propose pricing for services related to orphan well decommissioning and environmental remediation. Bidders are instructed to select applicable scope sections by checkbox and provide unit costs for labor, equipment, and services they are capable of providing. The rate sheet encompasses 18 primary scope sections including well plugging, methane emissions monitoring, wellhead cutting and capping, equipment decommissioning, flowline removal, well shut-in, monitoring and sampling, TENORM testing, waste management, stormwater controls, site restoration, fencing, and soil analysis. Labor categories span from administrative assistants to senior engineers and specialized roles such as welders, operators with CDL certification, and project managers, with pricing requested on an hourly basis. The document also includes extensive equipment line items—ranging from small tools and monitoring instruments to heavy machinery such as excavators, dozers, haul trucks, and specialized environmental testing equipment—with bidders required to provide both hourly and daily rates where applicable.
Bidders are permitted to check any combination of the 18 scope sections for evaluation, allowing contractors flexibility in proposing for services matching their capabilities. The rate sheet includes provisions for crew packages (ranging from one-man to four-man crews with trucks), vehicle mileage, mobilization and demobilization, permitting fees, and subcontracted services. Notably, the instructions specify that per diem costs for lodging and meals should be excluded from the rate sheet, with contractors to utilize GSA CONUS rates from the federal per diem system for task orders requiring such reimbursement. The template allows bidders to provide alternative labor titles in the Notes column if standard classifications do not match their firm's staffing structure, and bidders may indicate whether services will be provided in-house or subcontracted. The contract term referenced is FY27-31 (fiscal years 2027-2031), indicating a multi-year contracting period for the orphan well remediation program.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP PHAA 2026_0002 - ECMC Orphan Well Program MTOC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract Rate Schedule for ECMC FY27-31 Main Task Order Contracts | Instruction TWO: For an opportunity to receive the highest rating, please fill out all cost lines of the Bidder's Unit Cost column corresponding to pricing items for the checked boxes at left. Bidders are invited to use their judgment for which lines to complete. Also add information in notes to clarify if necessary. If the labor title is not used in your firm, please supply an alternative labor title in the Notes column. |
| IMPORTANT Instruction ONE: Click a checkbox for each section of the scope your firm hopes to be contracted to provide. Your proposal will be evaluated separately for each section you check. You may check 1 box, 7 boxes, or any combo in between. | Instruction THREE: Please exclude all per diem costs for any line in this table that may include lodging and meal charges. Contractors with task order needing per diem reimbursement will use CONUS rates from https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-results?action=perdiems_report&fiscal_year=2026&state=CO&city=&zip= |
| Scope Section | Please Evaluate My Firm's Proposal For this Service | |||||||
| (check box) | Description of Labor Type or Service | Bidder's Unit Cost Equipment that is owned or under long term lease) | Units* | |||||
| (per hour, per DAY, etc.) | Service not provided | Notes (only if necess.) | ||||||
| Labor | ||||||||
| 3 - Pre and Post Plugging Methane Emissions | FALSE | Administrative Assistant | $0.00 | HR | FALSE | |||
| 4 - Plug Wells | FALSE | Associate Engineer/Scientist | $0.00 | HR | FALSE | |||
| 5 - Cut and Cap Wellhead | FALSE | Clerical Assistant | $0.00 | HR | FALSE | |||
| 6 - Decommission Production Equipment | FALSE | Construction/Field Supervisor | $0.00 | HR | FALSE | |||
| 7 - Remove/Abandon Flowlines | FALSE | Drafter w/ CAD/GIS | $0.00 | HR | FALSE | |||
| 8 - Shut-in Wells and Temporarily Decommission Equipment | FALSE | Field Technician I | $0.00 | HR | FALSE | |||
| 9 - Monitoring and Sampling | FALSE | Field Technician II | $0.00 | HR | FALSE | |||
| 10 - TENORM Testing | FALSE | General | $0.00 | HR | FALSE | |||
| 11 - Liquid Waste Management | FALSE | Inspector | $0.00 | HR | FALSE | |||
| 12 - Solid Waste Management | FALSE | Operator/CDL | $0.00 | HR | FALSE | |||
| 13 - Stormwater Controls | FALSE | Principal Engineer/Scientist | $0.00 | HR | FALSE | |||
| 14 - Backfill, Grading, And Re-Conturing | FALSE | Professional Litigation Support | $0.00 | HR | FALSE | |||
| 15 - Seedbed Preparation And Planting | FALSE | Project Engineer/Scientist I | $0.00 | HR | FALSE | |||
| 16 - Weed Control | FALSE | Project Engineer/Scientist II | $0.00 | HR | FALSE | |||
| 17 - Fencing | FALSE | Project Manager/Engineer/Sci | $0.00 | HR | FALSE | |||
| 18 - Soil Analysis | FALSE | Senior Engineer/Scientist | $0.00 | HR | FALSE | |||
| Senior Program Manager | $0.00 | HR | FALSE | |||||
| Staff Engineer/Scientist | $0.00 | HR | FALSE | |||||
| Submittals | $0.00 | HR | FALSE | |||||
| Welder | $0.00 | HR | FALSE | |||||
| Welder Helper | $0.00 | HR | FALSE | |||||
| FALSE | ||||||||
| SWMP - Preparation, Fees, Inspections | $0.00 | EACH | FALSE | |||||
| Storm Water Discharge Permit/Fees | $0.00 | EACH | FALSE | |||||
| FALSE | ||||||||
| 1 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| 2 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| 3 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| 4 Man Crew with Truck | $0.00 | HR | FALSE | |||||
| FALSE | ||||||||
| Vehicle Mileage | $0.00 | Mile | FALSE | |||||
| Mob/Demob | $0.00 | Mile | FALSE |
| Description of Labor Type, Equipment, or Service | Bidder's Unit Cost | Units* | |||||
| (per hour, per DAY, etc.) | Bidder's Unit Cost | Units* | |||||
| (per hour, per DAY, etc.) | Service Subcontracted | Service Not Provided | Notes (only if necess.) | ||||
| EQUIPMENT | |||||||
| 0.45 micron Water Filters (large) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| 0.45 micron Water Filters (small) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| 10 Wheel Haul Truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| 18 Wheel Haul Truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Anemonmeter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| ATV | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Back Hoe Shaker Head | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Backhoe Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Backhoe - Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Bladder - Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Boom Truck/Crane | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Camera | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Colorimetric Water Test Kit | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Disposable Bailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dissolved Oxygen (DO) Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dozer D5 or equivalant | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dozer D6 or equivalant | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dozer D8 or equivalant | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dump trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Dump truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Duplex Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Electrical Conductivity (EC) Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Excavator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Excavator Mini | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Field Tablet | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Flame Ionization Detector (FID) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Flatbed Trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Flow Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Foot Valve Pump/Tubing | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Fork Lift | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Four Gas Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Gas Chromatograph | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Gas Cylinder | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| GPS Unit (Navigation) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| GPS Unit (Submeter Accuracy) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Groundwater Supplies | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| H2S Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hand Auger | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hand/Power Tools | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hay Buster | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Hotsy | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| IsoFlask Container | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Isotube Gas Cylinder | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Jumping Jack | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Landfill Gas Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| LEL Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Loader | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Magnehelic Gauges | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Man Lift | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Metal Detector | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Misc Field Supplies | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Motor Grader | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| MSA (Draeger) Detector Tubes | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Multi-Meter (Temp, pH, SpC) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Multi-Parameter Meter (Flow Cell) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Multi-Parameter Meter (Temp, pH, SpC, Turb, DO) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Oil/Water Interface Probe | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| ORP Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Peristaltic Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| PetroFLAG Kit | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| pH Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Photoionization Detector (PID) | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Pickup Truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Pressure Gauges | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Roller Compactor | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck w/ belly dump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck w/ lowboy | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Semi truck w/ side dump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Skid Steer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Slide Hammer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Spotting Scope | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Steam Cleaner | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Submersible Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Survey Equipment - Auto Level /Tripod | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Survey Equipment - Optic Level/Tripod/Stadia Rod | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tedlar Bags | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Track Hoe - Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Track Hoe - Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tractor 100-200 HP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tractor Over 200 HP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Tractor Under 100 HP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Trailer - Bumper pull | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Trailer - Gooseneck | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Trash Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Turbidity Meter | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Vac Truck Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Vac Truck Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Vacuum Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Level Indicator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Truck Large | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Water Truck Small | $0.00 | HR | $0.00 | DAY | FALSE | FALSE | |
| Winch Truck | $0.00 | HR | FALSE | FALSE |
| PLUGGING | ||||||
| Base Beam | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| BOP | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| BWQ Equipment Pkg | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Cast Iron Bridge Plug (CIBP) set at depth <7" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Bridge Plug (CIBP) set at depth >10" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Bridge Plug (CIBP) set at depth 7"-10" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Cement Retainer (CICR) set at depth <7" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Cement Retainer (CICR) set at depth >10" | $0.00 | EACH | FALSE | FALSE | ||
| Cast Iron Cement Retainer (CICR) set at depth 7"-10" | $0.00 | EACH | FALSE | FALSE | ||
| CBL | $0.00 | FT | FALSE | FALSE | ||
| Cement | $0.00 | SACK | FALSE | FALSE | ||
| Circulating Tank | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Data Logger and Transducer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Drill Bit | $0.00 | EACH | FALSE | FALSE | ||
| Drill Collars | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Fishing Tools & Crew | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| High volume incinerator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Hot Tap <6" | $0.00 | EACH | FALSE | FALSE | ||
| Hot Tap >6" | $0.00 | EACH | FALSE | FALSE | ||
| Incinerator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Lubricator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Mill Bit | $0.00 | EACH | FALSE | FALSE | ||
| Packer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Packer hand | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Perf gun | $0.00 | EACH | FALSE | FALSE | ||
| Plug/Retainer setting charge | $0.00 | EACH | FALSE | FALSE | ||
| Plugging marker - above-grade | $0.00 | EACH | FALSE | FALSE | ||
| Plugging marker - below-grade | $0.00 | EACH | FALSE | FALSE | ||
| Power Swivel | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Separator | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Service Rig <150,000 lb. derrick - operating | $0.00 | HR | FALSE | FALSE | ||
| Service Rig <150,000 lb. derrick - standby | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >150,000 lb. <220,000 lb. derrick - operating | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >150,000 lb. <220,000 lb. derrick - standby | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >220,000 lb. derrick - operating | $0.00 | HR | FALSE | FALSE | ||
| Service Rig >220,000 lb. derrick - standby | $0.00 | HR | FALSE | FALSE | ||
| Slickline | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Slickline | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Triplex Pump | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Tubing Trailer | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Wireline Truck & Crew | $0.00 | HR | $0.00 | DAY | FALSE | FALSE |
| Work String | $0.00 | FT | FALSE | FALSE |
| MATERIALS | ||||
| Cornstalks | $0.00 | TN | FALSE | FALSE |
| Culvert - 18" CMP | $0.00 | LF | FALSE | FALSE |
| Culvert - 24" CMP | $0.00 | LF | FALSE | FALSE |
| Culvert - 48" CMP | $0.00 | LF | FALSE | FALSE |
| Disposal | $0.00 | CY | FALSE | FALSE |
| Erosion Control - Blanket | $0.00 | EACH | FALSE | FALSE |
| Erosion Control - Geotextile | $0.00 | SY | FALSE | FALSE |
| Erosion Control - Rock Check Dam | $0.00 | EACH | FALSE | FALSE |
| Erosion Control - Rock Riprap | $0.00 | TN | FALSE | FALSE |
| Erosion Control - Silt Fence | $0.00 | LF | FALSE | FALSE |
| Erosion Control - Tackifier (Plantago 100 lbs/ac) | $0.00 | AC | FALSE | FALSE |
| Erosion Control - Vehicle Tracking Control | $0.00 | EACH | FALSE | FALSE |
| Erosion Control - Wattles - 9" Excelsior/Wood | $0.00 | LF | FALSE | FALSE |
| Erosion Control - Wattles - 9" Straw | $0.00 | LF | FALSE | FALSE |
| Fence - Corner post (6" + wooden post) | $0.00 | EACH | FALSE | FALSE |
| Fence - Installation | $0.00 | HR | FALSE | FALSE |
| Fence - Line Post (4" minimum wooden post) | $0.00 | EACH | FALSE | FALSE |
| Fence - Removal | $0.00 | HR | FALSE | FALSE |
| Fence - T post (7 FT post) | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube gate - 16' | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube gate - 20' | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube gate - 20' | $0.00 | EACH | FALSE | FALSE |
| Fence - Tube Panel - 16' | $0.00 | EACH | FALSE | FALSE |
| Fence - Wire | $0.00 | LF | FALSE | FALSE |
| Fence - Wire Panel (16 FT x 50") | $0.00 | EACH | FALSE | FALSE |
| Fill Dirt | $0.00 | TN | FALSE | FALSE |
| Gravel | $0.00 | TN | FALSE | FALSE |
| Hay bale | $0.00 | TN | FALSE | FALSE |
| Road base | $0.00 | TN | FALSE | FALSE |
| Soil Analysis - Expedited | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Hydrometer | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Manure/ Compost | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Routine | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - SAR | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Soil Suitability | $0.00 | EACH | FALSE | FALSE |
| Soil Analysis - Table 915 | $0.00 | EACH | FALSE | FALSE |
| Soil Collection | $0.00 | EACH | FALSE | FALSE |
| Straw bale (certified weed free) | $0.00 | TN | FALSE | FALSE |
| Top Soil | $0.00 | CY | FALSE | FALSE |
| Water | $0.00 | GAL | FALSE | FALSE |
| SEEDING / WEED MAINTENANCE | ||||
| Seeding - Decompaction | $0.00 | AC | FALSE | FALSE |
| Seeding - Drill seed | $0.00 | AC | FALSE | FALSE |
| Seeding - Fertilizer/ Soil Amendments | $0.00 | AC | FALSE | FALSE |
| Seeding - Hand seed | $0.00 | AC | FALSE | FALSE |
| Seeding - Hydromulch (Bonded Fiber matrix) min 2000 lbs/ac | $0.00 | AC | FALSE | FALSE |
| Seeding - Hydromulch (Min 2000 lbs/ac) | $0.00 | AC | FALSE | FALSE |
| Seeding - Hydroseeding | $0.00 | AC | FALSE | FALSE |
| Seeding - Mulch and Crimp | $0.00 | AC | FALSE | FALSE |
| Seeding - Plowing and Deep Ripping | $0.00 | AC | FALSE | FALSE |
| Seeding - Seed Mix | $0.00 | AC | FALSE | FALSE |
| Seeding - Seedbed prep | $0.00 | AC | FALSE | FALSE |
| Weed Maintenance - Manual | $0.00 | HR | FALSE | FALSE |
| Weed Maintenance - Monitoring | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Mowing - Brush Hog | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Mowing - Riding Mower | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Selective | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Chemical: | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Spraying BroadlEACHf | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Spraying Pre-Emergent | $0.00 | HR | FALSE | FALSE |
| Weed maintenance - Spraying Ground Sterilant | $0.00 | HR | FALSE | FALSE |
| *Abbreviations: |
| TN = ton, LS = lump sum, LF = linear foot, SY = square yard, AC = acre, CY = cubic yard, HR = hour, DAY = DAY, GAL = gallons |
https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-results?action=perdiems_report&fiscal_year=2026&state=CO&city=&zip=
File details come from the government source that posted it. Updated .