This is a Prime/Subcontractor Form (Exhibit B) for ITB No. 26-B-129CW, Contract No. C-2098, related to the River Beach Drive Vehicular Beach Access Ramp Reconstruction Project in Florida. The form requires bidders to identify all proposed subcontractors and specify the dollar value and percentage of work to be performed by each contractor, both prime and sub-tier. The project involves reconstructing a beach access vehicular ramp destroyed during Hurricane Ian in 2022, including composite sheet pile seawall panels, concrete cap, reinforced concrete vehicular ramp, curbing, pedestrian sidewalk, and site restoration at a location bordering commercial and residential properties east of A1A. Failure to complete and submit this form may result in a non-responsive bid determination.
Bidders must complete the form by entering dollar values and work percentages in designated green-shaded cells, with all other cells calculating automatically. The total bid amount must equal 100 percent across all contractors listed. Prime contractors are responsible for ensuring all subcontractors hold appropriate licenses, and any changes to subcontractors during project execution require prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. This form is also used to determine local preference eligibility in accordance with Section 2.8, D of the solicitation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2098 | ITB No. 26-B-129CW | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on 10. Pricing Table
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor | |||
| $ - 0 | 0.00% | |||||
| List appropriate sub contractors to be used for each discipline listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | ||||||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor | |||
| (Examples: Electrical, HVAC, Plumbing, | ||||||
| Landscaping, etc. for your project) | $ - 0 | 0.00% | ||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| $ - 0 | 0.00% | |||||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |