Exhibit_B_Pricing_Schedule_RFP_2026007_Final_06302026.xlsx
XLSX spreadsheet 45 KB Posted
- Attached to
- Disaster Debris Removal Services
- Solicitation number
- RFP 2026-007
- Issued by
- Lake County, Florida
About this file
This is a Pricing Schedule Exhibit B for RFP 2026-007 issued by the City of Groveland, Florida for Disaster Debris Removal Services. The solicitation seeks qualified contractors to provide debris removal, reduction, hauling, and lawful disposal services on an annual requirements basis for use before, during, and after emergency events, storms, hurricanes, or other incidents that generate debris within the City's jurisdiction. The contract is intended to provide a pre-positioned, competitively procured resource that may be activated by the City when needed through task orders, notices to proceed, purchase orders, or other written directives. The pricing schedule covers a five-year contract term and includes 21 line items encompassing various debris removal and management services, with estimated quantities of zero for Year 1 through Year 5, indicating this is a requirements contract with activation on an as-needed basis.
The pricing schedule requires proposers to submit unit prices for all 21 service categories, with unit prices to include all labor, supervision, materials, equipment, fuel, transportation, mobilization, demobilization, overhead, profit, fees, taxes, permits, disposal coordination, documentation, and incidentals necessary to perform the work unless a line item expressly states otherwise. Services include mobilization and demobilization, emergency road clearance, vegetative and construction debris collection and disposal, white goods and electronic waste handling, household hazardous waste management, hazardous tree and limb removal, debris management site setup and operation, grinding and chipping, air curtain incineration, final disposal and tipping fees, site restoration, traffic control, standby rates, time-and-materials labor and equipment rates, documentation and reporting support, and alternate debris storage site services. Proposers must complete the pricing schedule as a separate Excel file and upload it with their proposal, including their company name, authorized representative information, signature, and contact details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Schedule
| EXHIBIT B – RFP 2026-007, PRICING SCHEDULE FOR DISASTER DEBRIS REMOVAL SERVICES | ||||||
| Proposers shall complete the pricing schedule as a separate Excel file and upload it with the proposal. Unit prices shall include all labor, supervision, materials, equipment, fuel, transportation, mobilization, demobilization, overhead, profit, fees, taxes, permits, disposal coordination, documentation, and incidentals necessary to perform the work unless a line item expressly states otherwise. | ||||||
| YEAR 1 | ||||||
| Item No. | Scope Item | Unit of Measure | Estimated Quantity | Unit Price | Extended Price | Notes / Exceptions |
| 1 | Mobilization and demobilization | Each | 0 | $0.00 | $0.00 | |
| 2 | Emergency road clearance / push services | Hour / crew / lane mile | 0 | $0.00 | $0.00 | |
| 3 | Vegetative debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 4 | Construction and demolition debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 5 | White goods handling | Each / ton | 0 | $0.00 | $0.00 | |
| 6 | Electronic waste handling, if included | Each / ton | 0 | $0.00 | $0.00 | |
| 7 | Household hazardous waste / regulated debris, if included | Pound / ton / each | 0 | $0.00 | $0.00 | |
| 8 | Hazardous limbs / hangers | Each | 0 | $0.00 | $0.00 | |
| 9 | Hazardous leaning trees | Each | 0 | $0.00 | $0.00 | |
| 10 | Hazardous stump / root-ball removal | Each / diameter class | 0 | $0.00 | $0.00 | |
| 11 | Debris management site setup | Each | 0 | $0.00 | $0.00 | |
| 12 | Debris management site operation | Day / cubic yard / ton | 0 | $0.00 | $0.00 | |
| 13 | Grinding / chipping / reduction | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 14 | Air curtain incineration / burning, only if authorized and permitted | Cubic yard / ton / day | 0 | $0.00 | $0.00 | |
| 15 | Final disposal / tipping fees | Ton / cubic yard | 0 | $0.00 | $0.00 | |
| 16 | Site restoration and closeout | Each / lump sum | 0 | $0.00 | $0.00 | |
| 17 | Traffic control | Day / hour / location | 0 | $0.00 | $0.00 | |
| 18 | Standby rates, if authorized by the City | Hour / day | 0 | $0.00 | $0.00 | |
| 19 | Labor and equipment rates for limited time-and-materials emergency work | Hour | 0 | $0.00 | $0.00 | |
| 20 | Documentation / reporting / audit support, if separately priced | Hour / lump sum | 0 | $0.00 | $0.00 | |
| 21 | Alternate / secondary debris storage site mobilization or operation, if applicable | Each / day / lump sum | 0 | $0.00 | $0.00 | |
| TOTAL: | $0.00 |
| YEAR 2 | ||||||
| Item No. | Scope Item | Unit of Measure | Estimated Quantity | Unit Price | Extended Price | Notes / Exceptions |
| 1 | Mobilization and demobilization | Each | 0 | $0.00 | $0.00 | |
| 2 | Emergency road clearance / push services | Hour / crew / lane mile | 0 | $0.00 | $0.00 | |
| 3 | Vegetative debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 4 | Construction and demolition debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 5 | White goods handling | Each / ton | 0 | $0.00 | $0.00 | |
| 6 | Electronic waste handling, if included | Each / ton | 0 | $0.00 | $0.00 | |
| 7 | Household hazardous waste / regulated debris, if included | Pound / ton / each | 0 | $0.00 | $0.00 | |
| 8 | Hazardous limbs / hangers | Each | 0 | $0.00 | $0.00 | |
| 9 | Hazardous leaning trees | Each | 0 | $0.00 | $0.00 | |
| 10 | Hazardous stump / root-ball removal | Each / diameter class | 0 | $0.00 | $0.00 | |
| 11 | Debris management site setup | Each | 0 | $0.00 | $0.00 | |
| 12 | Debris management site operation | Day / cubic yard / ton | 0 | $0.00 | $0.00 | |
| 13 | Grinding / chipping / reduction | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 14 | Air curtain incineration / burning, only if authorized and permitted | Cubic yard / ton / day | 0 | $0.00 | $0.00 | |
| 15 | Final disposal / tipping fees | Ton / cubic yard | 0 | $0.00 | $0.00 | |
| 16 | Site restoration and closeout | Each / lump sum | 0 | $0.00 | $0.00 | |
| 17 | Traffic control | Day / hour / location | 0 | $0.00 | $0.00 | |
| 18 | Standby rates, if authorized by the City | Hour / day | 0 | $0.00 | $0.00 | |
| 19 | Labor and equipment rates for limited time-and-materials emergency work | Hour | 0 | $0.00 | $0.00 | |
| 20 | Documentation / reporting / audit support, if separately priced | Hour / lump sum | 0 | $0.00 | $0.00 | |
| 21 | Alternate / secondary debris storage site mobilization or operation, if applicable | Each / day / lump sum | 0 | $0.00 | $0.00 | |
| TOTAL: | $0.00 |
| YEAR 3 | ||||||
| Item No. | Scope Item | Unit of Measure | Estimated Quantity | Unit Price | Extended Price | Notes / Exceptions |
| 1 | Mobilization and demobilization | Each | 0 | $0.00 | $0.00 | |
| 2 | Emergency road clearance / push services | Hour / crew / lane mile | 0 | $0.00 | $0.00 | |
| 3 | Vegetative debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 4 | Construction and demolition debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 5 | White goods handling | Each / ton | 0 | $0.00 | $0.00 | |
| 6 | Electronic waste handling, if included | Each / ton | 0 | $0.00 | $0.00 | |
| 7 | Household hazardous waste / regulated debris, if included | Pound / ton / each | 0 | $0.00 | $0.00 | |
| 8 | Hazardous limbs / hangers | Each | 0 | $0.00 | $0.00 | |
| 9 | Hazardous leaning trees | Each | 0 | $0.00 | $0.00 | |
| 10 | Hazardous stump / root-ball removal | Each / diameter class | 0 | $0.00 | $0.00 | |
| 11 | Debris management site setup | Each | 0 | $0.00 | $0.00 | |
| 12 | Debris management site operation | Day / cubic yard / ton | 0 | $0.00 | $0.00 | |
| 13 | Grinding / chipping / reduction | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 14 | Air curtain incineration / burning, only if authorized and permitted | Cubic yard / ton / day | 0 | $0.00 | $0.00 | |
| 15 | Final disposal / tipping fees | Ton / cubic yard | 0 | $0.00 | $0.00 | |
| 16 | Site restoration and closeout | Each / lump sum | 0 | $0.00 | $0.00 | |
| 17 | Traffic control | Day / hour / location | 0 | $0.00 | $0.00 | |
| 18 | Standby rates, if authorized by the City | Hour / day | 0 | $0.00 | $0.00 | |
| 19 | Labor and equipment rates for limited time-and-materials emergency work | Hour | 0 | $0.00 | $0.00 | |
| 20 | Documentation / reporting / audit support, if separately priced | Hour / lump sum | 0 | $0.00 | $0.00 | |
| 21 | Alternate / secondary debris storage site mobilization or operation, if applicable | Each / day / lump sum | 0 | $0.00 | $0.00 | |
| TOTAL: | $0.00 |
| YEAR 4 | ||||||
| Item No. | Scope Item | Unit of Measure | Estimated Quantity | Unit Price | Extended Price | Notes / Exceptions |
| 1 | Mobilization and demobilization | Each | 0 | $0.00 | $0.00 | |
| 2 | Emergency road clearance / push services | Hour / crew / lane mile | 0 | $0.00 | $0.00 | |
| 3 | Vegetative debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 4 | Construction and demolition debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 5 | White goods handling | Each / ton | 0 | $0.00 | $0.00 | |
| 6 | Electronic waste handling, if included | Each / ton | 0 | $0.00 | $0.00 | |
| 7 | Household hazardous waste / regulated debris, if included | Pound / ton / each | 0 | $0.00 | $0.00 | |
| 8 | Hazardous limbs / hangers | Each | 0 | $0.00 | $0.00 | |
| 9 | Hazardous leaning trees | Each | 0 | $0.00 | $0.00 | |
| 10 | Hazardous stump / root-ball removal | Each / diameter class | 0 | $0.00 | $0.00 | |
| 11 | Debris management site setup | Each | 0 | $0.00 | $0.00 | |
| 12 | Debris management site operation | Day / cubic yard / ton | 0 | $0.00 | $0.00 | |
| 13 | Grinding / chipping / reduction | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 14 | Air curtain incineration / burning, only if authorized and permitted | Cubic yard / ton / day | 0 | $0.00 | $0.00 | |
| 15 | Final disposal / tipping fees | Ton / cubic yard | 0 | $0.00 | $0.00 | |
| 16 | Site restoration and closeout | Each / lump sum | 0 | $0.00 | $0.00 | |
| 17 | Traffic control | Day / hour / location | 0 | $0.00 | $0.00 | |
| 18 | Standby rates, if authorized by the City | Hour / day | 0 | $0.00 | $0.00 | |
| 19 | Labor and equipment rates for limited time-and-materials emergency work | Hour | 0 | $0.00 | $0.00 | |
| 20 | Documentation / reporting / audit support, if separately priced | Hour / lump sum | 0 | $0.00 | $0.00 | |
| 21 | Alternate / secondary debris storage site mobilization or operation, if applicable | Each / day / lump sum | 0 | $0.00 | $0.00 | |
| TOTAL: | $0.00 |
| YEAR 5 | ||||||
| Item No. | Scope Item | Unit of Measure | Estimated Quantity | Unit Price | Extended Price | Notes / Exceptions |
| 1 | Mobilization and demobilization | Each | 0 | $0.00 | $0.00 | |
| 2 | Emergency road clearance / push services | Hour / crew / lane mile | 0 | $0.00 | $0.00 | |
| 3 | Vegetative debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 4 | Construction and demolition debris collection, loading, hauling, and disposal | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 5 | White goods handling | Each / ton | 0 | $0.00 | $0.00 | |
| 6 | Electronic waste handling, if included | Each / ton | 0 | $0.00 | $0.00 | |
| 7 | Household hazardous waste / regulated debris, if included | Pound / ton / each | 0 | $0.00 | $0.00 | |
| 8 | Hazardous limbs / hangers | Each | 0 | $0.00 | $0.00 | |
| 9 | Hazardous leaning trees | Each | 0 | $0.00 | $0.00 | |
| 10 | Hazardous stump / root-ball removal | Each / diameter class | 0 | $0.00 | $0.00 | |
| 11 | Debris management site setup | Each | 0 | $0.00 | $0.00 | |
| 12 | Debris management site operation | Day / cubic yard / ton | 0 | $0.00 | $0.00 | |
| 13 | Grinding / chipping / reduction | Cubic yard / ton | 0 | $0.00 | $0.00 | |
| 14 | Air curtain incineration / burning, only if authorized and permitted | Cubic yard / ton / day | 0 | $0.00 | $0.00 | |
| 15 | Final disposal / tipping fees | Ton / cubic yard | 0 | $0.00 | $0.00 | |
| 16 | Site restoration and closeout | Each / lump sum | 0 | $0.00 | $0.00 | |
| 17 | Traffic control | Day / hour / location | 0 | $0.00 | $0.00 | |
| 18 | Standby rates, if authorized by the City | Hour / day | 0 | $0.00 | $0.00 | |
| 19 | Labor and equipment rates for limited time-and-materials emergency work | Hour | 0 | $0.00 | $0.00 | |
| 20 | Documentation / reporting / audit support, if separately priced | Hour / lump sum | 0 | $0.00 | $0.00 | |
| 21 | Alternate / secondary debris storage site mobilization or operation, if applicable | Each / day / lump sum | 0 | $0.00 | $0.00 | |
| TOTAL: | $0.00 |
| YEAR 1 TOTAL | $0.00 |
| YEAR 2 TOTAL | $0.00 |
| YEAR 3 TOTAL | $0.00 |
| YEAR 4 TOTAL | $0.00 |
| YEAR 5 TOTAL | $0.00 |
| GRAND TOTAL | $0.00 |
| PROPOSER INFORMATION | |
| Company Name: | Date: |
| Authorized Representative: | Title: |
| Signature: | Phone: |
| Email: |
image1.png
File details come from the government source that posted it. Updated .