This is an Exhibit B Performance Requirements document from the Washington State Patrol (WSP) for a Fixed Air Compressor/Fill Station System for SCBA (Self-Contained Breathing Apparatus). The document outlines mandatory requirements including a 7000 psi 5-stage compressor system, containment fill stations with minimum 3 bank/position, electric carbon monoxide monitor with calibration kit wired for alarm and shutdown, compliance with NFPA 1989 Standards Chapter 7 (2019 Edition) and NFPA 1900 Standards Chapter 23 (2024 Edition). Additional requirements include commissioning services for connecting to existing high pressure cylinders, leak testing, startup of compressors, air sample testing with written reports, factory training for FTA staff, and provision of alternative means to fill air tanks during system downtime.
The performance requirements are categorized as Mandatory Pass/Fail (M), Mandatory Scored (MS), or Desirable Scored (DS), with bidders required to indicate "Yes" or "No" for each requirement in the compliance column. Bidders must submit completed responses to the Procurement Coordinator at Pennie.Clark@wsp.wa.gov. The document does not specify pricing terms, funding sources, or contract duration details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit E Diverse Business Inclusion Plan.pdf | ||
| Exhibit F - Bidder Reference Scoring.pdf | ||
| Sole_Source_Notification_20250483.pdf | ||
| Exhibit A-1-Bidders Certification.pdf | ||
| Exhibit C - Bid Price.xlsx | XLSX spreadsheet | |
| WSP RFP PC236521.pdf | ||
| Exhibit D - Purchase Agreement.pdf | ||
| WSP RFP PC236521.pdf.crdownload | CRDOWNLOAD file | |
| Exhibit A-2-Bidders Profile.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B – PERFORMANCE REQUIREMENTS – PC236521 PAGE 1
EXHIBIT B – PERFORMANCE REQUIREMENTS
Competitive Solicitation: Fixed Air Compressor/Fill Station System for SCBA
Bidder: _________________________________ Type/print full legal name of bidder company
Instructions:
Bidders submitting a proposal must complete and submit an Exhibit B for evaluation purposes.
Performance Requirements: Bidder must respond to each requirement as noted in the instructions below.
1. Review all requirements, priorities and provided definitions:
• Mandatory Pass/Fail (M): Minimum requirement; Bidder that does not meet this requirement will not be considered any further.
• Mandatory Scored (MS): Critical requirement; evaluators will score based on the degree to which Bidder's response meets the requirement.
• Desirable Scored (DS): Desirable requirement; evaluators will score based on the degree to which Bidder's response meets the requirement.
2. Using the Bidder Meets Requirement column, Bidder must select either a "Yes" or "No" to indicate the Bidder's ability to meet the requirement. Any entry that is not either a "Yes" or "No", may be deemed non-responsive and will not be considered any further.
3. Bidder must respond in the Written Response column for every requirement that indicates a "Written Response Required”. Written responses must not reference any material present elsewhere. The written response shall be considered complete and stand on its own merits or may be deemed non-responsive.
EXHIBIT B – PERFORMANCE REQUIREMENTS – PC236521 PAGE 2
PERFORMANCE REQUIREMENTS AND FACTORS
REQ ID Performance Requirement and Stated Business Need
Points Available
Priority Bidder’s Compliance Written Response
1. 7000 psi, 5 stage Compressor System Pass/Fail M ☐ Yes ☐ No
2. Containment Fill Stations – minimum 3 bank/position Pass/Fail M ☐ Yes
3. Electric Carbon Monoxide Monitor w/ Calibration Kit wired for alarm and shutdown
Pass/Fail M ☐ Yes
4. MEETS NFPA 1989 STANDARDS, Chapter 7: 2019 Edition
5. MEETS NFPA 1900 STANDARDS, Chapter 23: 2024 Edition
6. Commissioning Services to include: Connection to existing high pressure cylinders, leak test, and startup of compressors. Perform air sample with written report.
Pass/Fail MS ☐ Yes
7. Vendor will provide factory training on operation and function of compressor system to FTA staff.
9. Vendor to supply alternative means to fill air tanks when/if the systems is down. This will allow the Fire Training Academy to continue operations until the system is back up.