EXHIBIT B for 2291-1204 - FIRST ARTICLE TEST-FAT-IPR CDRL DI-NDTI-82326 PRE-DELIVERABLE REV 10-20-2022.pdf
Data Item Description Oct 20, 2022 PDF 254 KB Posted
- Attached to
- EHP ANODE PLG AY-502
- Solicitation number
- SPMYM2-23-Q-0139
View the file
Other versions and copies of DI-NDTI-82326
| File | Revision | Posted | Attached to |
|---|---|---|---|
| A010 CDRL DI-NDTI-82326 FAT_IPR-cdrl A010.pdf | Revision not stated | SYPNOPSIS/SOLICITATION -C-5 Hydraulic Winches-Remanufacture |
Who attaches DI-NDTI-82326
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
SESS
D. SYSTEM|ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
FIRST ARTICLE TEST/INSPECTION PROCEDURES AND
REPORT (FAT/IPR)
APROVED FIRST ARTICLE TEST REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-82326 PER CONTRACT PURCHASING ACTIVITY
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
SD ONE/R SEE BLOCK 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
N/A N/A N/A Reg Repr o
16. REMARKS N4523A 0 1 0
Block 9 - Distribution Statement D. Distribution authorized to DoD and DoD contractors only.
Administration and operations only, effective 10/28/2022. Other U.S. requests shall be referred to COMNAVSEASYSCOM.
Block 10 – Previously accepted FAT must meet the requirements of DWG. 5762287 Rev-A.
Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite. Upon submission in WAWF send email notifications to:
ddpw_wawf_group.fct@navy.mil.
Document No.: 2291-1203
15. Total 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/s/ ROY, MATHEW 10/28/2022 /s/ LEACH, WILLIE 10/28/2022
DD FORM 1423-1, FEB 2001
Page 1 of 1 Pages
0002AB B
B001 mailto:ddpw_wawf_group.fct@navy.mil
| SEE BLOCK 16 |
| N4523A |
File details come from the government source that posted it. Updated .