STATEMENT OF WORK AND TESTING
Ordering Data for a total of 10 each Assembly 502 of dwg 5792287-A.
Provide labor, materials, NCC coating services, and testing necessary to manufacture a total of ten (10) each Assembly 502 of NAVSEA Drawing 5792287-A ready for installation with the following attributes:
The following items are in addition to the requirements listed in General Note 69 (Ordering Data) of the drawing.
Note that Assembly 502 consists of all the parts listed on 5792287-A, which includes assembly 504 of the same 5792287 drawing. Assembly 504 is a “Preform” molding assembly which consists of pieces 16, 17, and 18 of the drawing. Also includes a separate piece 509 of 5792287 Pressure Proof Cap on each assembly.
1. Hydrostatic and electrical testing is taken directly from Submarine Maintenance Standard (SMS) 1110-081-021 Rev A. Company test procedure may be used if identical results are provided.
Hydrostatic testing is performed before complete reassembly. To also include the post-hydro electrical testing.
(1) 1.d. Test and performance:
1.d.(1) Hydrostatically test electrical cable connectors and receptacles.
NOTE 9: Before installation in pressure vessel, test circuit insulation resistance and continuity in accordance with Step
NOTE 10: Test outboard seals of each molded insert using cycles identified in Table 5.
1.d.(1)(a) Pressure Test Number 1:
NOTE 11: The gages required for the 1000 psig test must be used for the 100 psig cyclings. The intent of the test is to ensure there are no imperfections in the O-ring mating sealing surface that can only be verified before the O-ring seats at the higher pressure. Continue to the 1000 psig test following low pressure cycling. Selection of gages for the 1000 psig test must be in accordance with NAVSEA T/m s9086-RJ-STM-010-CH-504, Pressure, Temperature, and other Mechanical and Electromechanical Measuring Instruments, NSTM Chapter 504.
WARNING: Equip hydrostatic test pump with certified test gages and a relief valve. Set relief valve at 1100 psig maximum.
1.d.(1)(a){1} Using fresh water as a test medium, apply test pressure to outboard side of connector body outboard O-ring seal. Test pressure and cycles to be in accordance with Table 5, Test Number 1.
1.d.(1)(a){2} Inspect for external leakage past mechanical joints and seals; external leakage past mechanical joints and seals is not acceptable.
1.d.(1)(a){3} After cleaning and drying insert face, test insulation resistance and continuity in accordance with Step 1.d.(2).
1.d.(1)(b) Elevated Pressure Test Number 2:
WARNING: Equip hydrostatic test pump with certified test gages and a relief valve. Set relief valve at 1100 psig maximum.
1.d.(1)(b){1} Using fresh water as a test medium, apply test pressure to outboard side of connector body outboard O-ring seal. Test pressure and cycles to be in accordance with Table 5, Test Number 2.
1.d.(1)(b){2} Inspect for external leakage and distortion; external leakage or distortion is not acceptable.
Table 5. Pressure Cycles
Test Number Pressure Cycle Number of Cycles
1 Apply 100 (100 to 102) psig, hold for 5 minutes, reduce to 0 psig
2 Apply 1000 (1000 to 1020) psig, hold for 2 hours, reduce to 0 psig
1.d.(2) Insulation resistance and continuity tests:
Do not operate insulation test set continuously for more than 2 minutes on each circuit tested.
NOTE 12: Use 500-volt insulation resistance tester and RX1 scale of multimeter meeting requirements of SCAT 4245.
1.d.(2)(a) Minimum allowable insulation resistance is:
1.d.(2)(a){1} 2000 megohms from conductor-to-ground and from conductor-to-conductor, 1.d.(2)(a){2} 1000 megohms from conductor-to-shield, and
1.d.(2)(a){3} 100 megohms from shield-to-ground.
NOTE 13: The resistance of special cables is specified in ohms per foot. If such cable is in-place during this check, the operator must determine the resistance for that type and length of cable.
1.d.(2)(b) Continuity from outboard pin-to-inboard pin, socket contact, or wire must be in accordance with applicable drawing. Maximum allowable resistance is less than 1 ohm using a Simpson 260-6XLP multimeter (or equivalent).
1. Provide written proof of First Item Qualification listed is General Note 59.
*********** PREREQUISITE TO AWARD - GENERAL NOTE 59 *************
"First Article Qualification: The contractor shall submit First Article items consisting of on complete penetrator assembly and two complete molded plug assemblies (anode) manufactured by production tooling for first article qualification tests. Both penetrator and molded plug assemblies shall be furnished with fifteen feet of conductor or cable. These samples shall be subjected to the first article inspection (Type I and type IV) specified in Table I of MIL-C-24231D (or latest revision), in the order shown therein. The underwater explosion test of (paragraph 4.7.7.) is not required."
Ordering Data per Note 69 of 5792287 on sheet 11:
A. Electrical Hull Penetration IPPC - Assembly and Component Details, NAVSEA 5792287-A
B. Assembly 502, consisting of all the parts listed on the drawing, which includes “preform” assembly 504. The Assembly 509 Sealing Plug assembly noted in Ordering Data item 69-C is also included.
C. A separate pressure proof cap assembly 509 is required.
D. LSSHOF-23 cable length is 110-feet per Zone 25-F on sheet 4 of 5792287 and General Note 43.
Finished cable length will be determined at final installation.
E. Not Applicable. This is a molded cable assembly covered by item D above.
F. Hull Insert is NOT to be supplied with these cable assemblies.
G. Not applicable. A pressure proof cap is specified by item “C” above.
H. A hull insert plug is NOT required.
I. Position of receptacle bodies in penetrator is per General Note 40, which is with the polarizing slot in the down (6-oclock) position.
J. Packaging per Note 67 of 5792287 is required. The outside of the packaging must be marked with the eight digit document numbers provided by the contract as well as the contract number.
Protect cables from shipping damage using bubble wrap or other approved method. Ship with Assembly 509 sealing plug installed.
Contact Matt Roy of C/270.1 at 360-476-8967 for questions or clarification.
File details come from the government source that posted it. Updated .