Exhibit_B_-_DIW_MLPS_Site_Specifications.pdf
PDF 1 MB Posted
- Solicitation number
- 24-8307
- Issued by
- Collier County, Florida
About this file
Exhibit B is a detailed site specification document for the Deep Injection Well (DIW) and Master Leachate Pumping Station (MLPS) systems for Collier County, Florida. The document provides technical schematics and photographic documentation of the leachate management infrastructure for the county landfill, detailing the system's components including storage tanks, monitoring wells, pumping arrangements, and redundancy features. The specifications cover the DIW site layout, a dual zone monitoring well configuration, leachate tanks, and the MLPS, which serves as the master collection and pumping point for all landfill leachate discharge.
The system includes critical infrastructure components such as two 10 hp submersible pumps, an emergency 6" diesel bypass leachate pump, and an emergency generator with an automatic transfer switch to ensure continuous operation during power outages. The leachate management system features redundant discharge pipelines - a 6" line to SCWRF that is normally closed and an 8" line to DIW storage tanks that remains normally open. The infrastructure is designed to pump leachate from the storage tanks into a deep injection well, providing a comprehensive waste management solution that ensures operational continuity and environmental compliance for Collier County's solid waste management infrastructure.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
DIW SITE SPECIFICATIONS
EXHIBIT B
MLPS SITE SPECIFICATIONS
MLPS (Part of the DIW System):
Master Collec�on/Pumping point of all Collier County Landfill’s Leachate Discharge
Leachate is pumped to the Deep Injec�on Well Storage Tanks
From the storage tanks into the Deep Injec�on Well
Emergency Generator w/automa�c transfer switch in event of power outage
Emergency 6” Diesel bypass Leachate Pump
10 hp Submersible Pumps (x2) Leachate Discharge lines from MLPS wet well to DIW
Redundancy:
6” Leachate discharge pipeline to SCWRF –
Normally closed
8” Leachate discharge pipeline to DIW storage tanks – Normally Open
Diesel bypass Leachate Pump suc�on line from wet well
File details come from the government source that posted it. Updated .