Exhibit B DI Water System Maintenance Scope of Work final 71916.pdf

PDF 35 KB Posted

Attached to
DQ FAAA 2017-78 Deionized Water System Maint & Repair
Solicitation number
DQ1 FAAA 2017000078 1
Issued by
Denver County, Denver City, Colorado

About this file

This is a Scope of Work document for a deionized water system maintenance contract. The document outlines comprehensive maintenance procedures for a water filtration and treatment system, detailing semi-annual pre-filter replacements (1.0 micron 30" meltblown filters with o-rings, specifically Graver model GWT131A30-3), semi-annual post-filter replacements (Parker 0.2 absolute 30" filters), monthly R/O pre-filter installations and replacements (GE 20" 1.0 micron meltblown DOE Puretrex models), annual UV lamp replacements (3084 model), and quartz sleeve maintenance. The scope additionally includes twice-yearly mixed bed servicing with an estimated 12 bags of 40-pound salt per year, annual system sterilization and flushing performed on weekends, annual filter membrane cleaning, water softener resin checks and replacements as needed, and check valve installation on the storage tank overflow line. The document indicates that additional maintenance items are anticipated to be added or removed following a pre-bid walkthrough meeting, with an updated scope of work to be distributed to attendees.

The document includes a cost estimate table framework but does not provide specific pricing information for most line items. Service rates are referenced for regular hourly work (Monday through Friday, 8:00 a.m. to 5:00 p.m.), Saturday/overtime rates, and average emergency response time, though specific dollar amounts are not populated in this version. The document explicitly notes that additional pricing information will be provided separately and welcomes bidder comments and revisions to the proposed scope of work prior to finalization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procedure Part Annual Frequency Quantity Cost Each Installation Each Total Cost

Pre-filters 1.0 micron 30”meltblown Nominal 222 o-ring W/ fin Graver #GWT131A30-3 Semi Annually

Post filters Parker 0.2 Absolute 30”222 o-ring Semi Annually

R/O Pre-Filter GE 20”1.0 micron meltblown DOE Puretrex PXx01x20 Monthly

Installation of required 20 inch filter housing. One Time

20 Inch Filter TBD Monthly

UV Lamps 3084 Annually

Quartz Sleevs ? Annually

3.6 Mixed Beds Twice

Salt- Estimated one 40 pound bag per month As needed 12 Entire system sterilyzed and flushed - Must be performed on weekend

Annually, or after system is opened for service.

Filter Membranes cleaned Annually

Total Cost

Check and Replace Water Softener resin if needed.

Install Check valve on storage tank overflow line.

Regular Hourly Rate (M-F, 8:00 – 5:00) Saturday/overtime rate Average emergency response time

Exhibit B Deionized Water System Maintenance Scope of Work and Cost Estimate

Items anticipated to be done in the first month (if needed)

Note: We expect additional items to be added and possibly removed from this list of maintainance items after the pre-bid walk through. This will be updated and sent to the attendees after the meeting. We welcome your comments/revisions to this scope of work.

Additional Pricing (do not include in total)

Sheet1

File details come from the government source that posted it. Updated .