This is a Scope of Work document for a deionized water system maintenance contract. The document outlines comprehensive maintenance procedures for a water filtration and treatment system, detailing semi-annual pre-filter replacements (1.0 micron 30" meltblown filters with o-rings, specifically Graver model GWT131A30-3), semi-annual post-filter replacements (Parker 0.2 absolute 30" filters), monthly R/O pre-filter installations and replacements (GE 20" 1.0 micron meltblown DOE Puretrex models), annual UV lamp replacements (3084 model), and quartz sleeve maintenance. The scope additionally includes twice-yearly mixed bed servicing with an estimated 12 bags of 40-pound salt per year, annual system sterilization and flushing performed on weekends, annual filter membrane cleaning, water softener resin checks and replacements as needed, and check valve installation on the storage tank overflow line. The document indicates that additional maintenance items are anticipated to be added or removed following a pre-bid walkthrough meeting, with an updated scope of work to be distributed to attendees.
The document includes a cost estimate table framework but does not provide specific pricing information for most line items. Service rates are referenced for regular hourly work (Monday through Friday, 8:00 a.m. to 5:00 p.m.), Saturday/overtime rates, and average emergency response time, though specific dollar amounts are not populated in this version. The document explicitly notes that additional pricing information will be provided separately and welcomes bidder comments and revisions to the proposed scope of work prior to finalization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Procedure Part Annual Frequency Quantity Cost Each Installation Each Total Cost
Pre-filters 1.0 micron 30”meltblown Nominal 222 o-ring W/ fin Graver #GWT131A30-3 Semi Annually
Post filters Parker 0.2 Absolute 30”222 o-ring Semi Annually
R/O Pre-Filter GE 20”1.0 micron meltblown DOE Puretrex PXx01x20 Monthly
Installation of required 20 inch filter housing. One Time
20 Inch Filter TBD Monthly
UV Lamps 3084 Annually
Quartz Sleevs ? Annually
3.6 Mixed Beds Twice
Salt- Estimated one 40 pound bag per month As needed 12 Entire system sterilyzed and flushed - Must be performed on weekend
Annually, or after system is opened for service.
Filter Membranes cleaned Annually
Total Cost
Check and Replace Water Softener resin if needed.
Install Check valve on storage tank overflow line.
Regular Hourly Rate (M-F, 8:00 – 5:00) Saturday/overtime rate Average emergency response time
Exhibit B Deionized Water System Maintenance Scope of Work and Cost Estimate
Items anticipated to be done in the first month (if needed)
Note: We expect additional items to be added and possibly removed from this list of maintainance items after the pre-bid walk through. This will be updated and sent to the attendees after the meeting. We welcome your comments/revisions to this scope of work.
Additional Pricing (do not include in total)