Exhibit B - City of Durango_s Vision Slides.pdf
PDF 9 MB Posted
- Solicitation number
- 2025-0038
- Issued by
- La Plata County, Colorado
About this file
This document is a comprehensive project presentation for the City of Durango's Police Department and City Hall redevelopment, involving Reynolds Ash + Associates (RA+A), DHM Design, and DLR Group. The project focuses on repurposing the historic high school building at 201 E 12th Street to consolidate city services, including City Hall, Police Department, and Community Development and Engineering departments. The proposed plan aims to centralize municipal services, enhance the urban landscape, and create a welcoming public space while preserving the historical significance of the existing building.
The project timeline spans from 1994 to 2024, with key milestones including the initial identification of the building as a potential city facility, a 2021 school district vote to sell the property, and community stakeholder meetings between October 2023 and February 2024. The proposed design includes approximately 40,000 square feet of space, with detailed floor plans for different levels and specialized areas for the Police Department, such as command staff, records, patrol, detectives, and community spaces. The project's key goals include revitalizing community landmarks, creating an inclusive environment, and consolidating city services to improve teamwork and productivity, with a total estimated project area of 48,070 square feet including a proposed addition and existing building renovation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORT LEWIS COLLEGE | FL1701 COOPER RESIDENCE HALL IMPROVEMENTS
CITY OF DURANGO
POLICE DEPARTMENT/CITY HALL
APRIL 30TH, 2024
BradenDemmerly Text Box Exhibit B - City of Durango's Vision
RA+A | FAMILIARITY WITH THE BUILDING
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
FORUM AGENDA
M E E T I N G OV E RV I E W
1 . S I T E I M P R OV E M E N TS R E CA P
2 . B U I L D I N G I N T E R I O R E X I ST I N G C O N D I T I O N S
3 . OV E R A L L P R OJ E C T G OA L S , K E YS + C O N S I D E R AT I O N S
4 . I N T E R I O R B U I L D I N G P L A N C O N C E P TS
5 . Q U E ST I O N S + A N S W E R S
6 . B R E A K O U T S E S S I O N
7. Q U E ST I O N S F O R D I S C U S S I O N AT TA B L E S
8 . N E X T ST E P S + I N F O R M AT I O N L I N K S
Ann Christensen Landscape Architect
Project Team
José Madrigal City Manager
Bob Brammer Erin Hyder Assistant City Manager
Brice Current Police Chief
Tracy Reynolds Architect Principal
Savannah Lytle City Planner
Daniel Murray Development Services Manager
Scott Shine Director of Community Development
Klancy Nixon Community Engagement Specialist
Jake Davis Architect Specialist
Project Timeline City of Durango Master Facility Program, Reynolds-Larson Associates identifies building as option for City Hall
City of Durango Master Plan mentions use of historical high school site for City Hall
9-R School District votes to sell building to Durango Fire Protection District
Joint meeting with City Council and DFPD board members, discussed River City Hall site was not feasible for both fire station and PD combined.
City staff asked City Council to consider 9-R building for City municipal uses.
MARCH
Public meeting to consider historic high school campus potential use, asked community if in support of project
MAY
Joint meeting between DFPD and City Council, tentative agreement was presented for real estate exchange
AUGUST
Agreement was approved by City Council to swap River City Hall for historic high school
NOVEMBER
• Parking Study complete
• Neighborhood stakeholder meetings Oct/23- Feb/ 24
Historic Highschool Site
Consolidation to Central Site
City Hall
Police Department
990 E 2nd Avenue
949 E 2nd Avenue
Community Development and Engineering 215 E 12th Street
1235 Camino Del Rio, Durango, CO 81301
201 E 12th Street
Historic Highschool
Community Development & Engineering
Existing buildings and site
Buckley Park
12th Street Aerial view looking North
Opportunity
• Centralize city services downtown
• Feature historic building complex
• Enhance as public setting
• Demonstrate Sustainability and connectivity
Durango High School
Architect: MacLaren and Thomas 1917 n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
EXTERIOR RENDERINGS
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
EXISTING CONDITIONS
CLASSROOMS
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
COMMON SPACES
GYMNASIUM + TRACK
POOL + LOCKER ROOMS
AUDITORIUM
GOALS + PRINCIPLES
P R OJ E C T G OA L S
1 . U T I L I Z E A N D R E V I TA L I Z E C O M M U N I T Y L A N D M A R K S
OUR AIM IS TO BREATHE NEW LIFE INTO DURANGO’S URBAN FABRIC BY
REPURPOSING EXISTING COMMUNITY LANDMARKS WHILE HONORING THEIR
HISTORICAL SIGNIFICANCE.
2 . C R E AT E A W E LC O M I N G A N D I N C LU S I V E E N V I R O N M E N T
WE ENVISION A SPACE THAT FOSTERS A SENSE OF BELONGING FOR ALL
RESIDENTS, REGARDLESS OF BACKGROUND, BY DESIGNING WITH INCLUSIVITY
AND ACCESSIBIL ITY AT THE FOREFRONT.
3 . C O N S O L I DAT E C I T Y S E RV I C E S
CREATE A CENTRALIZED HUB THAT ENHANCES TEAMWORK AND PRODUCTIVITY,
WHILE ALSO FOSTERING A POSITIVE AND ENRICHING ENVIRONMENT FOR CITY
EMPLOYEES AND VISITORS.
KEY PRINCIPLES + CONSIDERATIONS
KEY CONSIDERATIONS
1. ACCESSIBILITY
2. SITE REHAB AND AMENITIES UPGRADE
3. PEDESTRIAN FRIENDLY
4. FLEXIBILITY
5. CITY PLANNING OBJECTIVES
6. GOVERNMENT VISIBILITY & ACCESSIBILITY
7. CIVIC PRIDE
8. EFFICIENCY
10. SUSTAINABILITY
KEY PRINCIPLES
1. UTILIZE AND REVITALIZE COMMUNITY LANDMARKS
2. CREATE A WELCOMING + INCLUSIVE ENVIRONMENT
3. FOSTER BROAD CIVIC EXCHANGE
4. MAKE CITY HALL THE HEART OF CIVIC LIFE
5. BUILD DURANGO’S PUBLIC SQUARE
6. TURN CITY HALL INTO A DESTINATION
7. PROMOTE INNOVATION AND CREATIVITY
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
C I T Y O F D U R A N G O S E R V I C E S
| • | C ITY COUNCIL |
| • | ADMINISTRATION (CITY MANAGER) |
| • | ADMINISTRATION (CITY CLERK) |
| • | HUMAN RESOURCES |
| • | COMMUNITY DEVELOPMENT |
| • | ENGINEERING |
| • | F INANCE |
| • | INFORMATION TECHNOLOGY (TBD) |
| • | MEDIA + PUBLIC INFORMATION OFFICE |
| • | COMMUNITY MEETING ROOMS + SHARED SPACES |
EXISTING BUILDING + PROGRAM
+ / - 40,000 SQUARE FEET
PROGRAM
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
FLOOR PLAN CONCEPTS
DN
DN
DN
DN
UP
UP
UP
DN
PU
BL
IC
EN
TR
AN
C E
SE
C
U R
E
EN
TR
AN
C E
SE
C
U R
E
SECURE
HOLD
OPEN
HOLD
OPEN
PA
R
TI
TI
O N
W
AL
L
SE
C
U R
E
COURT
COUNTER
H O
LD
O
PE
N
STAIR
STAIR
ELEV.
MEDIA
1,886 SQ/FT
PUBLIC
ENTRANCE
COMMUNITY
ROOM
COMMUNITY
ROOM
COMMUNITY
ROOM
RR
RR
COMMON + PUBLIC AREAS
CITY OFFICE AREAS
UTILITY + STORAGE AREAS
PROGRAM LEGEND
SCALE: 1/8" = 1'-0"
GROUND LEVEL - PROPOSED
NORTH
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
FLOOR PLAN CONCEPTS
DN
DN
DN
UP
UP
UP
UP
UP
UP
UP
UP
DN
DN
HOLD
OPEN
SECURE
PUBLIC
COUNTER
PUBLIC
COUNTER P
UB
LI
C E
NT
R
A
NC
E
SECURE
HOLD
OPEN
SE
C
U R
E
DISPLAY
SECURE
HOLD
OPEN
C
LO
SE
T
WORK AREA
WORK/FLEX
SPACE
STAIR
STAIR
ELEV.
RAISED
DIAS
COUNCIL
CHAMBERS
RR
RR
COMMON + PUBLIC AREAS
CITY OFFICE AREAS
UTILITY + STORAGE AREAS
PROGRAM LEGEND
SCALE: 1/8" = 1'-0"
MAIN LEVEL - PROPOSED
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
FLOOR PLAN CONCEPTS
DN
DN
DN
DN
DN
DN
SECURE
HOLD
OPEN
SECURE
WORK AREA
SECURE
HOLD
OPEN
SE
C
U R
E
STAIR
STAIR
ELEV.
HOLD
OPEN
PUBLIC
COUNTER
PUBLIC
COUNTER
OPEN TO BELOW
RR
RR
COMMON + PUBLIC AREAS
CITY OFFICE AREAS
UTILITY + STORAGE AREAS
PROGRAM LEGEND
SCALE: 1/8" = 1'-0"
UPPER LEVEL - PROPOSED
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
FLOOR PLAN CONCEPTS
UP
UP
UP
UP
UP
UP
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
ELEV.
I.T.
4,132 SQ/FT
HOLD
OPEN
RR RR
COMMON + PUBLIC AREAS
CITY OFFICE AREAS
UTILITY + STORAGE AREAS
PROGRAM LEGEND
SCALE: 1/8" = 1'-0"
GYM LEVEL - PROPOSED
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
INTERIOR RENDERINGS
MAIN LOBBY
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
ENTRY
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
COUNCIL CHAMBER
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
ADMINISTRATIVE
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
WORK SPACE
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
WORK SPACE
Durango Police Department Design Goals
Cultural •Emphasis on collaboration, independence, and a culture of transparency •Addressing misunderstandings about police role •Recruitment/retention challenges •Increasing percentage of women officers
Work Environment and Security •Customer service emphasis •Sensitivity around interview rooms, day to day surroundings for staff •Increased Security/Multiple Levels: Changing drug laws, gun proliferation, dangerous chemicals/biological agents •Complex evidence handling
Technology •Robust data storage and communication infrastructure •Introduction of virtual communications and video-conferencing capabilities •Increased reliance on technology for security, evidence retention, and officer safety
POLICE DEPARTMENT FLOOR PLANS
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
WORK SPACE Durango Police Department Program
Command Staff Records Patrol Detectives Community Outreach Training Property & Evidence Dispatch Staff Amenities Community Spaces
3,173 1,711 5,491 3,741 4,140 1,577 4,308
8,581 7,343
Total: 49,040 S.F.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
PREFUNCTION &
MEETING ROOMS
COMMUNITY ROOM
PUBLIC
LOBBY
RECEPTION / RECORDS
BUILDING
SUPPORT
COMMUNITY
ROOM
SUPPORT
POLICE TRAINING
TOILETS
PUBLIC
ENTRY
LOCKERS
CIVILIAN &
VISITOR
LOCKERS
STAFF
AMENITIES
PATROL
ADMINISTRATION
SECURE
ENTRY
MAT/DT ROOM
STAFF
AMENITIES
FITNESS
EVIDENCE
PROPERTY RETURN
EVIDENCE
PATROL
EXISTING BUILDING
PARKING
TH
S
TR
EE
T
TH
S
TR
EE
T
2ND AVENUE
PROPOSED ADDITION: 14,530 GSF
EXISTING BUILDING RENOVATION: 33,540 GSF
TOTAL: 48,070
1140 MAIN AVE, STE. B
DURANGO, CO 81301
(970) 259 - 7494
FAX (970) 259 - 7492
262 PAGOSA STREET, STE. 200
P.O. BOX 96
PAGOSA SPRINGS, CO 81147
RA-AE.COM
REYNOLDS ASH + ASSOCIATES, P.C.
RA+A ARCHITECTS, P.C.
EXPRESSLY RESERVES THE COMMON LAW COPYRIGHT
AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE
PLANS ARE NOT TO BE CHANGED OR COPIED IN ANY
FORM OR MANNER WHATSOEVER NOR ARE THEY TO BE
ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST
OBTAINING WRITTEN PERMISSION AND CONSENT OF
THE ARCHITECT OF RECORD.
THE USE OF THESE PLANS AND SPECIFICATIONS SHALL
BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH
THEY WERE PREPARED AND PUBLICATION TEHREOF IS
EXPRESSLY LIMITED TO SUCH USE. FEDERAL LAW
PROHIBITS THE REPRODUCTION, DISPLAY, SALE OR
OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE
EXPRESS WRITTEN CONSENT OF
JOB. NO.:
DATE:
DRAWN BY:
ISSUE RECORD:
REVISIONS:
PROGRESS
SE
T
NOT FOR CONST
PR
IN
T D
A T
E /T
IM
E
PROJECT TEAM:
4/
/2
3:
:4
PM
A P
RO
PE
RT
Y
C O
N D
IT
IO
N
SU
IT
A
BI
LI
TY
A
SS
ES
SM
EN
T
FO
R:
9- R
PR
OP
ER
TY
A T
1 E
AS
T
TH
S
TR
EE
T
DU
RA
NG
O, C
OL
OR
AD
O
2023-06-26 Author
P-101
SCHEMATIC
DIAGRAM - MAIN
LEVEL
SCALE: 3/32" = 1'-0"
SCHEMATIC DIAGRAM - MAIN LEVEL
DURANGO POLICE DEPARTMENT
SCHEMATIC DIAGRAMS
9-R PROPERTY AT 201 EAST 12TH STREET, DURANGO CO
04/30/2024
MAIN LEVEL
2ND AVENUE
TH
S
TR
EE
T
TH
S
TR
EE
T n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
COMMAND STAFF & RTCC
BACKUP
DISPATCH
DETECTIVES
INTERVIEW
SUITE
TRAFFIC PST
CORE TEAM OUTREACH CODE
TOILETS
PROPOSED ADDITION: 14,530 GSF
EXISTING BUILDING RENOVATION: 33,540 GSF
TOTAL: 48,070
1140 MAIN AVE, STE. B
DURANGO, CO 81301
(970) 259 - 7494
FAX (970) 259 - 7492
262 PAGOSA STREET, STE. 200
P.O. BOX 96
PAGOSA SPRINGS, CO 81147
RA-AE.COM
REYNOLDS ASH + ASSOCIATES, P.C.
RA+A ARCHITECTS, P.C.
EXPRESSLY RESERVES THE COMMON LAW COPYRIGHT
AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE
PLANS ARE NOT TO BE CHANGED OR COPIED IN ANY
FORM OR MANNER WHATSOEVER NOR ARE THEY TO BE
ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST
OBTAINING WRITTEN PERMISSION AND CONSENT OF
THE ARCHITECT OF RECORD.
THE USE OF THESE PLANS AND SPECIFICATIONS SHALL
BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH
THEY WERE PREPARED AND PUBLICATION TEHREOF IS
EXPRESSLY LIMITED TO SUCH USE. FEDERAL LAW
PROHIBITS THE REPRODUCTION, DISPLAY, SALE OR
OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE
EXPRESS WRITTEN CONSENT OF
JOB. NO.:
DATE:
DRAWN BY:
ISSUE RECORD:
REVISIONS:
PROGRESS
SE
T
NOT FOR CONST
PR
IN
T D
A T
E /T
IM
E
PROJECT TEAM:
4/
/2
3:
:4
PM
A P
RO
PE
RT
Y
C O
N D
IT
IO
N
SU
IT
A
BI
LI
TY
A
SS
ES
SM
EN
T
FO
R:
9- R
PR
OP
ER
TY
A T
1 E
AS
T
TH
S
TR
EE
T
DU
RA
NG
O, C
OL
OR
AD
O
2023-06-26 Author
P-102
SCHEMATIC
DIAGRAM - UPPER
LEVEL
SCALE: 3/32" = 1'-0"
SCHEMATIC DIAGRAM - UPPER LEVEL
DURANGO POLICE DEPARTMENT
SCHEMATIC DIAGRAMS
9-R PROPERTY AT 201 EAST 12TH STREET, DURANGO CO
04/30/2024
UPPER LEVEL
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
POLICE DEPARTMENT RENDERINGS
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
n Reynolds Ash + Associates designed the addition to the building in 2009.
n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.
n Bell handed the project off to Reynolds.
Exterior design of the building was Reynolds’ concept.
COMMUNITY FEEDBACK
B R E A KO U T S E S S I O N
1 . W H AT WO U L D YO U L I K E TO S E E I N C O U N C I L C H A M B E R S ? W H AT A R E
YO U R W I S H L I ST I T E M S ?
2 . W H AT WO U L D YO U L I K E TO S E E T H E C O M M U N I T Y R O O M S B E U S E D F O R ? W H AT C O N S I D E R AT I O N S D O YO U F E E L N E E D TO B E M A D E ?
3 . S E E I N G T H E I N T E R I O R C O N C E P T UA L D E S I G N , D O YO U S U P P O RT T H E
D E S I G N D I R E C T I O N ? W H Y, O R W H Y N OT ?
THANK YOU FOR YOUR TIME!
| 20240426_Durango City Civic Complex-REVIEW-Opt.pdf |
| 2024-04-24 Durango City Hall.pdf |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
File details come from the government source that posted it. Updated .