About this file

This document is a comprehensive project presentation for the City of Durango's Police Department and City Hall redevelopment, involving Reynolds Ash + Associates (RA+A), DHM Design, and DLR Group. The project focuses on repurposing the historic high school building at 201 E 12th Street to consolidate city services, including City Hall, Police Department, and Community Development and Engineering departments. The proposed plan aims to centralize municipal services, enhance the urban landscape, and create a welcoming public space while preserving the historical significance of the existing building.

The project timeline spans from 1994 to 2024, with key milestones including the initial identification of the building as a potential city facility, a 2021 school district vote to sell the property, and community stakeholder meetings between October 2023 and February 2024. The proposed design includes approximately 40,000 square feet of space, with detailed floor plans for different levels and specialized areas for the Police Department, such as command staff, records, patrol, detectives, and community spaces. The project's key goals include revitalizing community landmarks, creating an inclusive environment, and consolidating city services to improve teamwork and productivity, with a total estimated project area of 48,070 square feet including a proposed addition and existing building renovation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT LEWIS COLLEGE | FL1701 COOPER RESIDENCE HALL IMPROVEMENTS

CITY OF DURANGO

POLICE DEPARTMENT/CITY HALL

APRIL 30TH, 2024

BradenDemmerly Text Box Exhibit B - City of Durango's Vision

RA+A | FAMILIARITY WITH THE BUILDING

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

FORUM AGENDA

M E E T I N G OV E RV I E W

1 . S I T E I M P R OV E M E N TS R E CA P

2 . B U I L D I N G I N T E R I O R E X I ST I N G C O N D I T I O N S

3 . OV E R A L L P R OJ E C T G OA L S , K E YS + C O N S I D E R AT I O N S

4 . I N T E R I O R B U I L D I N G P L A N C O N C E P TS

5 . Q U E ST I O N S + A N S W E R S

6 . B R E A K O U T S E S S I O N

7. Q U E ST I O N S F O R D I S C U S S I O N AT TA B L E S

8 . N E X T ST E P S + I N F O R M AT I O N L I N K S

Ann Christensen Landscape Architect

Project Team

José Madrigal City Manager

Bob Brammer Erin Hyder Assistant City Manager

Brice Current Police Chief

Tracy Reynolds Architect Principal

Savannah Lytle City Planner

Daniel Murray Development Services Manager

Scott Shine Director of Community Development

Klancy Nixon Community Engagement Specialist

Jake Davis Architect Specialist

Project Timeline City of Durango Master Facility Program, Reynolds-Larson Associates identifies building as option for City Hall

City of Durango Master Plan mentions use of historical high school site for City Hall

9-R School District votes to sell building to Durango Fire Protection District

Joint meeting with City Council and DFPD board members, discussed River City Hall site was not feasible for both fire station and PD combined.

City staff asked City Council to consider 9-R building for City municipal uses.

MARCH

Public meeting to consider historic high school campus potential use, asked community if in support of project

MAY

Joint meeting between DFPD and City Council, tentative agreement was presented for real estate exchange

AUGUST

Agreement was approved by City Council to swap River City Hall for historic high school

NOVEMBER

• Parking Study complete

• Neighborhood stakeholder meetings Oct/23- Feb/ 24

Historic Highschool Site

Consolidation to Central Site

City Hall

Police Department

990 E 2nd Avenue

949 E 2nd Avenue

Community Development and Engineering 215 E 12th Street

1235 Camino Del Rio, Durango, CO 81301

201 E 12th Street

Historic Highschool

Community Development & Engineering

Existing buildings and site

Buckley Park

12th Street Aerial view looking North

Opportunity

• Centralize city services downtown

• Feature historic building complex

• Enhance as public setting

• Demonstrate Sustainability and connectivity

Durango High School

Architect: MacLaren and Thomas 1917 n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

EXTERIOR RENDERINGS

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

EXISTING CONDITIONS

CLASSROOMS

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

COMMON SPACES

GYMNASIUM + TRACK

POOL + LOCKER ROOMS

AUDITORIUM

GOALS + PRINCIPLES

P R OJ E C T G OA L S

1 . U T I L I Z E A N D R E V I TA L I Z E C O M M U N I T Y L A N D M A R K S

OUR AIM IS TO BREATHE NEW LIFE INTO DURANGO’S URBAN FABRIC BY

REPURPOSING EXISTING COMMUNITY LANDMARKS WHILE HONORING THEIR

HISTORICAL SIGNIFICANCE.

2 . C R E AT E A W E LC O M I N G A N D I N C LU S I V E E N V I R O N M E N T

WE ENVISION A SPACE THAT FOSTERS A SENSE OF BELONGING FOR ALL

RESIDENTS, REGARDLESS OF BACKGROUND, BY DESIGNING WITH INCLUSIVITY

AND ACCESSIBIL ITY AT THE FOREFRONT.

3 . C O N S O L I DAT E C I T Y S E RV I C E S

CREATE A CENTRALIZED HUB THAT ENHANCES TEAMWORK AND PRODUCTIVITY,

WHILE ALSO FOSTERING A POSITIVE AND ENRICHING ENVIRONMENT FOR CITY

EMPLOYEES AND VISITORS.

KEY PRINCIPLES + CONSIDERATIONS

KEY CONSIDERATIONS

1. ACCESSIBILITY

2. SITE REHAB AND AMENITIES UPGRADE

3. PEDESTRIAN FRIENDLY

4. FLEXIBILITY

5. CITY PLANNING OBJECTIVES

6. GOVERNMENT VISIBILITY & ACCESSIBILITY

7. CIVIC PRIDE

8. EFFICIENCY

10. SUSTAINABILITY

KEY PRINCIPLES

1. UTILIZE AND REVITALIZE COMMUNITY LANDMARKS

2. CREATE A WELCOMING + INCLUSIVE ENVIRONMENT

3. FOSTER BROAD CIVIC EXCHANGE

4. MAKE CITY HALL THE HEART OF CIVIC LIFE

5. BUILD DURANGO’S PUBLIC SQUARE

6. TURN CITY HALL INTO A DESTINATION

7. PROMOTE INNOVATION AND CREATIVITY

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

C I T Y O F D U R A N G O S E R V I C E S

•C ITY COUNCIL
•ADMINISTRATION (CITY MANAGER)
•ADMINISTRATION (CITY CLERK)
•HUMAN RESOURCES
•COMMUNITY DEVELOPMENT
•ENGINEERING
•F INANCE
•INFORMATION TECHNOLOGY (TBD)
•MEDIA + PUBLIC INFORMATION OFFICE
•COMMUNITY MEETING ROOMS + SHARED SPACES

EXISTING BUILDING + PROGRAM

+ / - 40,000 SQUARE FEET

PROGRAM

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

FLOOR PLAN CONCEPTS

DN

DN

DN

DN

UP

UP

UP

DN

PU

BL

IC

EN

TR

AN

C E

SE

C

U R

E

EN

TR

AN

C E

SE

C

U R

E

SECURE

HOLD

OPEN

HOLD

OPEN

PA

R

TI

TI

O N

W

AL

L

SE

C

U R

E

COURT

COUNTER

H O

LD

O

PE

N

STAIR

STAIR

ELEV.

MEDIA

1,886 SQ/FT

PUBLIC

ENTRANCE

COMMUNITY

ROOM

COMMUNITY

ROOM

COMMUNITY

ROOM

RR

RR

COMMON + PUBLIC AREAS

CITY OFFICE AREAS

UTILITY + STORAGE AREAS

PROGRAM LEGEND

SCALE: 1/8" = 1'-0"

GROUND LEVEL - PROPOSED

NORTH

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

FLOOR PLAN CONCEPTS

DN

DN

DN

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

HOLD

OPEN

SECURE

PUBLIC

COUNTER

PUBLIC

COUNTER P

UB

LI

C E

NT

R

A

NC

E

SECURE

HOLD

OPEN

SE

C

U R

E

DISPLAY

SECURE

HOLD

OPEN

C

LO

SE

T

WORK AREA

WORK/FLEX

SPACE

STAIR

STAIR

ELEV.

RAISED

DIAS

COUNCIL

CHAMBERS

RR

RR

COMMON + PUBLIC AREAS

CITY OFFICE AREAS

UTILITY + STORAGE AREAS

PROGRAM LEGEND

SCALE: 1/8" = 1'-0"

MAIN LEVEL - PROPOSED

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

FLOOR PLAN CONCEPTS

DN

DN

DN

DN

DN

DN

SECURE

HOLD

OPEN

SECURE

WORK AREA

SECURE

HOLD

OPEN

SE

C

U R

E

STAIR

STAIR

ELEV.

HOLD

OPEN

PUBLIC

COUNTER

PUBLIC

COUNTER

OPEN TO BELOW

RR

RR

COMMON + PUBLIC AREAS

CITY OFFICE AREAS

UTILITY + STORAGE AREAS

PROGRAM LEGEND

SCALE: 1/8" = 1'-0"

UPPER LEVEL - PROPOSED

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

FLOOR PLAN CONCEPTS

UP

UP

UP

UP

UP

UP

CRAWL SPACE

CRAWL SPACE

CRAWL SPACE

CRAWL SPACE

ELEV.

I.T.

4,132 SQ/FT

HOLD

OPEN

RR RR

COMMON + PUBLIC AREAS

CITY OFFICE AREAS

UTILITY + STORAGE AREAS

PROGRAM LEGEND

SCALE: 1/8" = 1'-0"

GYM LEVEL - PROPOSED

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

INTERIOR RENDERINGS

MAIN LOBBY

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

ENTRY

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

COUNCIL CHAMBER

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

ADMINISTRATIVE

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

WORK SPACE

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

WORK SPACE

Durango Police Department Design Goals

Cultural •Emphasis on collaboration, independence, and a culture of transparency •Addressing misunderstandings about police role •Recruitment/retention challenges •Increasing percentage of women officers

Work Environment and Security •Customer service emphasis •Sensitivity around interview rooms, day to day surroundings for staff •Increased Security/Multiple Levels: Changing drug laws, gun proliferation, dangerous chemicals/biological agents •Complex evidence handling

Technology •Robust data storage and communication infrastructure •Introduction of virtual communications and video-conferencing capabilities •Increased reliance on technology for security, evidence retention, and officer safety

POLICE DEPARTMENT FLOOR PLANS

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

WORK SPACE Durango Police Department Program

Command Staff Records Patrol Detectives Community Outreach Training Property & Evidence Dispatch Staff Amenities Community Spaces

3,173 1,711 5,491 3,741 4,140 1,577 4,308

8,581 7,343

Total: 49,040 S.F.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

PREFUNCTION &

MEETING ROOMS

COMMUNITY ROOM

PUBLIC

LOBBY

RECEPTION / RECORDS

BUILDING

SUPPORT

COMMUNITY

ROOM

SUPPORT

POLICE TRAINING

TOILETS

PUBLIC

ENTRY

LOCKERS

CIVILIAN &

VISITOR

LOCKERS

STAFF

AMENITIES

PATROL

ADMINISTRATION

SECURE

ENTRY

MAT/DT ROOM

STAFF

AMENITIES

FITNESS

EVIDENCE

PROPERTY RETURN

EVIDENCE

PATROL

EXISTING BUILDING

PARKING

TH

S

TR

EE

T

TH

S

TR

EE

T

2ND AVENUE

PROPOSED ADDITION: 14,530 GSF

EXISTING BUILDING RENOVATION: 33,540 GSF

TOTAL: 48,070

1140 MAIN AVE, STE. B

DURANGO, CO 81301

(970) 259 - 7494

FAX (970) 259 - 7492

262 PAGOSA STREET, STE. 200

P.O. BOX 96

PAGOSA SPRINGS, CO 81147

RA-AE.COM

REYNOLDS ASH + ASSOCIATES, P.C.

RA+A ARCHITECTS, P.C.

EXPRESSLY RESERVES THE COMMON LAW COPYRIGHT

AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE

PLANS ARE NOT TO BE CHANGED OR COPIED IN ANY

FORM OR MANNER WHATSOEVER NOR ARE THEY TO BE

ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST

OBTAINING WRITTEN PERMISSION AND CONSENT OF

THE ARCHITECT OF RECORD.

THE USE OF THESE PLANS AND SPECIFICATIONS SHALL

BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH

THEY WERE PREPARED AND PUBLICATION TEHREOF IS

EXPRESSLY LIMITED TO SUCH USE. FEDERAL LAW

PROHIBITS THE REPRODUCTION, DISPLAY, SALE OR

OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE

EXPRESS WRITTEN CONSENT OF

JOB. NO.:

DATE:

DRAWN BY:

ISSUE RECORD:

REVISIONS:

PROGRESS

SE

T

NOT FOR CONST

PR

IN

T D

A T

E /T

IM

E

PROJECT TEAM:

4/

/2

3:

:4

PM

A P

RO

PE

RT

Y

C O

N D

IT

IO

N

SU

IT

A

BI

LI

TY

A

SS

ES

SM

EN

T

FO

R:

9- R

PR

OP

ER

TY

A T

1 E

AS

T

TH

S

TR

EE

T

DU

RA

NG

O, C

OL

OR

AD

O

2023-06-26 Author

P-101

SCHEMATIC

DIAGRAM - MAIN

LEVEL

SCALE: 3/32" = 1'-0"

SCHEMATIC DIAGRAM - MAIN LEVEL

DURANGO POLICE DEPARTMENT

SCHEMATIC DIAGRAMS

9-R PROPERTY AT 201 EAST 12TH STREET, DURANGO CO

04/30/2024

MAIN LEVEL

2ND AVENUE

TH

S

TR

EE

T

TH

S

TR

EE

T n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

COMMAND STAFF & RTCC

BACKUP

DISPATCH

DETECTIVES

INTERVIEW

SUITE

TRAFFIC PST

CORE TEAM OUTREACH CODE

TOILETS

PROPOSED ADDITION: 14,530 GSF

EXISTING BUILDING RENOVATION: 33,540 GSF

TOTAL: 48,070

1140 MAIN AVE, STE. B

DURANGO, CO 81301

(970) 259 - 7494

FAX (970) 259 - 7492

262 PAGOSA STREET, STE. 200

P.O. BOX 96

PAGOSA SPRINGS, CO 81147

RA-AE.COM

REYNOLDS ASH + ASSOCIATES, P.C.

RA+A ARCHITECTS, P.C.

EXPRESSLY RESERVES THE COMMON LAW COPYRIGHT

AND OTHER PROPERTY RIGHTS IN THESE PLANS. THESE

PLANS ARE NOT TO BE CHANGED OR COPIED IN ANY

FORM OR MANNER WHATSOEVER NOR ARE THEY TO BE

ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST

OBTAINING WRITTEN PERMISSION AND CONSENT OF

THE ARCHITECT OF RECORD.

THE USE OF THESE PLANS AND SPECIFICATIONS SHALL

BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH

THEY WERE PREPARED AND PUBLICATION TEHREOF IS

EXPRESSLY LIMITED TO SUCH USE. FEDERAL LAW

PROHIBITS THE REPRODUCTION, DISPLAY, SALE OR

OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE

EXPRESS WRITTEN CONSENT OF

JOB. NO.:

DATE:

DRAWN BY:

ISSUE RECORD:

REVISIONS:

PROGRESS

SE

T

NOT FOR CONST

PR

IN

T D

A T

E /T

IM

E

PROJECT TEAM:

4/

/2

3:

:4

PM

A P

RO

PE

RT

Y

C O

N D

IT

IO

N

SU

IT

A

BI

LI

TY

A

SS

ES

SM

EN

T

FO

R:

9- R

PR

OP

ER

TY

A T

1 E

AS

T

TH

S

TR

EE

T

DU

RA

NG

O, C

OL

OR

AD

O

2023-06-26 Author

P-102

SCHEMATIC

DIAGRAM - UPPER

LEVEL

SCALE: 3/32" = 1'-0"

SCHEMATIC DIAGRAM - UPPER LEVEL

DURANGO POLICE DEPARTMENT

SCHEMATIC DIAGRAMS

9-R PROPERTY AT 201 EAST 12TH STREET, DURANGO CO

04/30/2024

UPPER LEVEL

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

POLICE DEPARTMENT RENDERINGS

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

n Reynolds Ash + Associates designed the addition to the building in 2009.

n When the original building was being designed, Richard Ballantine came to Mike Bell to give input on the exterior.

n Bell handed the project off to Reynolds.

Exterior design of the building was Reynolds’ concept.

COMMUNITY FEEDBACK

B R E A KO U T S E S S I O N

1 . W H AT WO U L D YO U L I K E TO S E E I N C O U N C I L C H A M B E R S ? W H AT A R E

YO U R W I S H L I ST I T E M S ?

2 . W H AT WO U L D YO U L I K E TO S E E T H E C O M M U N I T Y R O O M S B E U S E D F O R ? W H AT C O N S I D E R AT I O N S D O YO U F E E L N E E D TO B E M A D E ?

3 . S E E I N G T H E I N T E R I O R C O N C E P T UA L D E S I G N , D O YO U S U P P O RT T H E

D E S I G N D I R E C T I O N ? W H Y, O R W H Y N OT ?

THANK YOU FOR YOUR TIME!

20240426_Durango City Civic Complex-REVIEW-Opt.pdf
2024-04-24 Durango City Hall.pdf
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10

File details come from the government source that posted it. Updated .