This is a Rate Sheet template for forklift and pallet jack equipment services issued by the California Department of Corrections and Rehabilitation (CDCR) covering 35 facilities including state prisons, youth correctional facilities, and healthcare facilities. The file details maintenance, inspection, and repair services for various types of equipment including LPG forklifts, gas/diesel forklifts, electric forklifts, aerial lifts, pallet jacks, and baler/compactors at each location. The services are to be performed during normal business hours (typically 7:00 AM to 3:00 PM), with provisions for outside normal hours and emergency services.

The Rate Sheet includes three pricing sections for each facility: Section A for maintenance and inspection services with estimated equipment quantities and hours, Section B for repair services with estimated service hours, and Section C for parts with fixed estimated amounts (typically $50,000 per facility, with some variations). Bidders may bid on one or more locations but must provide rates for all items within a chosen location. The CDCR reserves the right to augment the agreement amount by 25-100% of the total bid amount. A discount of at least 1% (minimum $50) may be offered for invoices paid within 30 days, which will be used as a tiebreaker in the event of equal bids.

View the file

Other files

File Type Posted
C5612630-D_IFB.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Sheet

FORKLIFT AND PALLET JACK EQUIPMENT SERVICES

Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel and per diem), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide the identified services.
Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
All CDCR estimated quantities and Contractor provided rates are for the entire term of this agreement.
The California Department of Corrections and Rehabilitation (CDCR) reserves the right to augment the dollar amount of this Agreement by 25% - 100% of the total bid amount.
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt =
In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts also tie, the awarded bidder shall be determined by a public coin toss.
There are no guarantees that any services will be requested from this agreement.

AVENAL STATE PRISON (ASP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG6x8x$ - 0=$ - 0
Forklift, Gas/Diesel3x8x$ - 0=$ - 0
Forklift, Electric2x8x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x8x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)17x8x$ - 0=$ - 0
Baler/Compactor1x8x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:30 a.m. to 3:00 p.m.)128x$ - 0=$ - 0
Outside Normal Business Hours16x$ - 0=$ - 0
Emergency Services16x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR ASP (A + B + C) $ - 0

CALIPATRIA STATE PRISON (CAL)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG6x24x$ - 0=$ - 0
Forklift, Gas/Diesel3x24x$ - 0=$ - 0
Forklift, Electric2x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)5x24x$ - 0=$ - 0
Baler/Compactor1x24x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:30 a.m. to 3:00 p.m.)120x$ - 0=$ - 0
Outside Normal Business Hours16x$ - 0=$ - 0
Emergency Services16x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CAL (A + B + C) $ - 0

CALIFORNIA CORRECTIONAL INSTITUTION (CCI)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG8x20x$ - 0=$ - 0
Forklift, Gas/Diesel8x20x$ - 0=$ - 0
Forklift, Electric8x20x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)6x20x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)4x20x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)10x30x$ - 0=$ - 0
Baler/Compactor5x20x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)180x$ - 0=$ - 0
Outside Normal Business Hours20x$ - 0=$ - 0
Emergency Services20x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CCI (A + B + C) $ - 0

CENTRAL CALIFORNIA WOMEN’S FACILITY (CCWF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG5x30x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric2x30x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x20x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)6x20x$ - 0=$ - 0
Baler/Compactor2x2x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)50x$ - 0=$ - 0
Outside Normal Business Hours10x$ - 0=$ - 0
Emergency Services10x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CCWF (A + B + C) $ - 0

CENTINELA STATE PRISON (CEN)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG3x48x$ - 0=$ - 0
Forklift, Gas/Diesel1x48x$ - 0=$ - 0
Forklift, Electric6x48x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x48x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x48x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)11x48x$ - 0=$ - 0
Baler/Compactor1x48x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)200x$ - 0=$ - 0
Outside Normal Business Hours50x$ - 0=$ - 0
Emergency Services50x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 20,000.00

TOTAL BASIS OF AWARD FOR CEN (A + B + C) $ - 0

CALIFORNIA HEALTH CARE FACILITY (CHCF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG2x24x$ - 0=$ - 0
Forklift, Gas/Diesel4x24x$ - 0=$ - 0
Forklift, Electric2x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)28x24x$ - 0=$ - 0
Baler/Compactor1x24x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:30 a.m. to 3:00 p.m.)160x$ - 0=$ - 0
Outside Normal Business Hours16x$ - 0=$ - 0
Emergency Services16x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CHCF (A + B + C) $ - 0

CALIFORNIA INSTITUTION FOR MEN (CIM)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG2x24x$ - 0=$ - 0
Forklift, Gas/Diesel11x24x$ - 0=$ - 0
Forklift, Electric2x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x24x$ - 0=$ - 0
Baler/Compactor1x24x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:30 a.m. to 3:00 p.m.)120x$ - 0=$ - 0
Outside Normal Business Hours16x$ - 0=$ - 0
Emergency Services16x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CIM (A + B + C) $ - 0

CALIFORNIA INSTITUTION FOR WOMEN (CIW)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG1x24x$ - 0=$ - 0
Forklift, Gas/Diesel4x24x$ - 0=$ - 0
Forklift, Electric1x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)3x24x$ - 0=$ - 0
Baler/Compactor1x24x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:30 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours16x$ - 0=$ - 0
Emergency Services16x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CIW (A + B + C) $ - 0

CALIFORNIA MEN’S COLONY (CMC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG2x4x$ - 0=$ - 0
Forklift, Gas/Diesel4x4x$ - 0=$ - 0
Forklift, Electric5x4x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)32x3x$ - 0=$ - 0
Baler/Compactor1x8x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)250x$ - 0=$ - 0
Outside Normal Business Hours4x$ - 0=$ - 0
Emergency Services4x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CMC (A + B + C) $ - 0

CALIFORNIA MEDICAL FACILITY (CMF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG4x40x$ - 0=$ - 0
Forklift, Gas/Diesel1x6x$ - 0=$ - 0
Forklift, Electric1x10x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x6x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x6x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)9x50x$ - 0=$ - 0
Baler/Compactor1x6x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 2:30 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours15x$ - 0=$ - 0
Emergency Services15x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CMF (A + B + C) $ - 0

CALIFORNIA STATE PRISON, CORCORAN (COR)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG8x144x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric2x36x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)8x144x$ - 0=$ - 0
Baler/Compactor2x18x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)215x$ - 0=$ - 0
Outside Normal Business Hours1x$ - 0=$ - 0
Emergency Services20x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR COR (A + B + C) $ - 0

CALIFORNIA REHABILITATION CENTER (CRC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG5x60x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric1x1x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x200x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x120x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)30x60x$ - 0=$ - 0
Baler/Compactor1x8x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)500x$ - 0=$ - 0
Outside Normal Business Hours40x$ - 0=$ - 0
Emergency Services60x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CRC (A + B + C) $ - 0

RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG5x40x$ - 0=$ - 0
Forklift, Gas/Diesel1x40x$ - 0=$ - 0
Forklift, Electric2x40x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x40x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x40x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)5x40x$ - 0=$ - 0
Baler/Compactor1x40x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)500x$ - 0=$ - 0
Outside Normal Business Hours1x$ - 0=$ - 0
Emergency Services50x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CTC (A + B + C) $ - 0

CORRECTIONAL TRAINING FACILITY (CTF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG10x18x$ - 0=$ - 0
Forklift, Gas/Diesel3x18x$ - 0=$ - 0
Forklift, Electric4x18x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)40x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)200x$ - 0=$ - 0
Outside Normal Business Hours24x$ - 0=$ - 0
Emergency Services24x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CTF (A + B + C) $ - 0

DEUEL VOCATIONAL INSTITUTION (DVI)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel3x36x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x24x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)80x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR DVI (A + B + C) $ - 0

FOLSOM STATE PRISON (FSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG7x84x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric2x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)6x24x$ - 0=$ - 0
Baler/Compactor1x18x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours40x$ - 0=$ - 0
Emergency Services24x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR FSP (A + B + C) $ - 0

HIGH DESERT STATE PRISON (HDSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG5x80x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric4x80x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x50x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)6x200x$ - 0=$ - 0
Baler/Compactor2x40x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)500x$ - 0=$ - 0
Outside Normal Business Hours40x$ - 0=$ - 0
Emergency Services40x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR HDSP (A + B + C) $ - 0

IRONWOOD STATE PRISON (ISP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG2x12x$ - 0=$ - 0
Forklift, Gas/Diesel11x12x$ - 0=$ - 0
Forklift, Electric4x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)5x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)8x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR ISP (A + B + C) $ - 0

KERN VALLEY STATE PRISON (KVSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG5x8x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric7x8x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x8x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x8x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)4x8x$ - 0=$ - 0
Baler/Compactor1x8x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)300x$ - 0=$ - 0
Outside Normal Business Hours1x$ - 0=$ - 0
Emergency Services1x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR KVSP (A + B + C) $ - 0

CALIFORNIA STATE PRISON - LOS ANGELES COUNTY (LAC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG4x80x$ - 0=$ - 0
Forklift, Gas/Diesel1x6x$ - 0=$ - 0
Forklift, Electric3x80x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x6x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)3x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)5x8x$ - 0=$ - 0
Baler/Compactor2x8x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)200x$ - 0=$ - 0
Outside Normal Business Hours24x$ - 0=$ - 0
Emergency Services8x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR LAC (A + B + C) $ - 0

MULE CREEK STATE PRISON (MCSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG7x36x$ - 0=$ - 0
Forklift, Gas/Diesel2x12x$ - 0=$ - 0
Forklift, Electric1x6x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)4x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)9x36x$ - 0=$ - 0
Baler/Compactor3x18x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)60x$ - 0=$ - 0
Outside Normal Business Hours8x$ - 0=$ - 0
Emergency Services8x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR MCSP (A + B + C) $ - 0

NORTHERN CALIFORNIA WOMEN’S FACILITY (NCWF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel2x24x$ - 0=$ - 0
Forklift, Electric2x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)80x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR NCWF (A + B + C) $ - 0

NORTH KERN STATE PRISON (NKSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG3x24x$ - 0=$ - 0
Forklift, Gas/Diesel1x8x$ - 0=$ - 0
Forklift, Electric2x16x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x8x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x4x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)2x16x$ - 0=$ - 0
Baler/Compactor1x8x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)76x$ - 0=$ - 0
Outside Normal Business Hours10x$ - 0=$ - 0
Emergency Services10x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR NKSP (A + B + C) $ - 0

PELICAN BAY STATE PRISON (PBSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG6x108x$ - 0=$ - 0
Forklift, Gas/Diesel1x18x$ - 0=$ - 0
Forklift, Electric2x3x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x3x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)7x11x$ - 0=$ - 0
Baler/Compactor1x2x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)400x$ - 0=$ - 0
Outside Normal Business Hours100x$ - 0=$ - 0
Emergency Services50x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR PBSP (A + B + C) $ - 0

PLEASANT VALLEY STATE PRISON (PVSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG6x6x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric4x6x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)4x6x$ - 0=$ - 0
Baler/Compactor1x6x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)150x$ - 0=$ - 0
Outside Normal Business Hours1x$ - 0=$ - 0
Emergency Services1x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 20,000.00

TOTAL BASIS OF AWARD FOR PVSP (A + B + C) $ - 0

RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG5x10x$ - 0=$ - 0
Forklift, Gas/Diesel1x1x$ - 0=$ - 0
Forklift, Electric6x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)6x12x$ - 0=$ - 0
Baler/Compactor1x1x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (8:00 a.m. to 3:00 p.m.)96x$ - 0=$ - 0
Outside Normal Business Hours1x$ - 0=$ - 0
Emergency Services1x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR RJD (A + B + C) $ - 0

CALIFORNIA STATE PRISON, SACRAMENTO (SAC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG5x50x$ - 0=$ - 0
Forklift, Gas/Diesel1x10x$ - 0=$ - 0
Forklift, Electric1x10x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x10x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)4x40x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)15x80x$ - 0=$ - 0
Baler/Compactor1x10x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)300x$ - 0=$ - 0
Outside Normal Business Hours5x$ - 0=$ - 0
Emergency Services5x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SAC (A + B + C) $ - 0

CALIFORNIA SUBSTANCE ABUSE TREATMENT FACILITY (SATF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG2x12x$ - 0=$ - 0
Forklift, Gas/Diesel10x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SATF (A + B + C) $ - 0

SIERRA CONSERVATION CENTER (SCC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG8x12x$ - 0=$ - 0
Forklift, Gas/Diesel1x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)13x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)19x12x$ - 0=$ - 0
Baler/Compactor2x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)140x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SCC (A + B + C) $ - 0

CALIFORNIA STATE PRISON, SOLANO (SOL)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG11x51x$ - 0=$ - 0
Forklift, Gas/Diesel2x9x$ - 0=$ - 0
Forklift, Electric1x1x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x6x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x9x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)27x123x$ - 0=$ - 0
Baler/Compactor3x15x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)213x$ - 0=$ - 0
Outside Normal Business Hours24x$ - 0=$ - 0
Emergency Services24x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SOL (A + B + C) $ - 0

SAN QUENTIN REHABILITATION CENTER (SQRC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG2x12x$ - 0=$ - 0
Forklift, Gas/Diesel10x12x$ - 0=$ - 0
Forklift, Electric2x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)19x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)120x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SQRC (A + B + C) $ - 0

SALINAS VALLEY STATE PRISON (SVSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel8x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)10x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)80x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SVSP (A + B + C) $ - 0

VALLEY STATE PRISON (VSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG6x4x$ - 0=$ - 0
Forklift, Gas/Diesel1x4x$ - 0=$ - 0
Forklift, Electric5x2x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x1x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x4x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x1x$ - 0=$ - 0
Baler/Compactor1x2x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)16x$ - 0=$ - 0
Outside Normal Business Hours8x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR VSP (A + B + C) $ - 0

WASCO STATE PRISON (WSP)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG5x18x$ - 0=$ - 0
Forklift, Gas/Diesel1x18x$ - 0=$ - 0
Forklift, Electric5x18x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x18x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x18x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)4x18x$ - 0=$ - 0
Baler/Compactor1x1x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)300x$ - 0=$ - 0
Outside Normal Business Hours1x$ - 0=$ - 0
Emergency Services1x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 108,000.00

TOTAL BASIS OF AWARD FOR WSP (A + B + C) $ - 0

HEMAN G. STARK YOUTH CORRECTIONAL FACILITY (HGS)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel3x36x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)2x24x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR HGS (A + B + C) $ - 0

NORTHERN CALIFORNIA YOUTH CORRECTIONAL CENTER (NCYCC) (UNDER THE AUTHORITY OF CHCF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x24x$ - 0=$ - 0
Forklift, Gas/Diesel13x24x$ - 0=$ - 0
Forklift, Electric1x24x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)3x24x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x24x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)20x24x$ - 0=$ - 0
Baler/Compactor1x24x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR NCYCC (A + B + C) $ - 0

SOUTHERN YOUTH CORRECTIONAL RECEPTION CENTER AND CLINIC (SYCRCC)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel2x24x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)2x24x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)80x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SYCRCC (A + B + C) $ - 0

VENTURA YOUTH CORRECTIONAL FACILITY (VYCF)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel5x60x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)2x24x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR VYCF (A + B + C) $ - 0

CALIFORNIA CORRECTIONAL HEALTH CARE SERVICES (CCHCS)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel1x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)1x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)60x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR CCHCS (A + B + C) $ - 0

SIERRA CONSERVATION CENTER- LASSEN CAMP WAREHOUSE (LCW)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel1x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)6x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)80x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR LCW (A + B + C) $ - 0

SIERRA CONSERVATION CENTER- NORTH COAST WAREHOUSE (NCW)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel1x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)23x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)100x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR NCW (A + B + C) $ - 0

SIERRA CONSERVATION CENTER- SOUTHERN CAMP WAREHOUSE (SCW)

A. MAINTENANCE AND INSPECTION SERVICES
DescriptionEstimated Equipment QuantityxEstimated Number
of HoursxHourly Rate=Total
Forklift, LPG1x12x$ - 0=$ - 0
Forklift, Gas/Diesel1x12x$ - 0=$ - 0
Forklift, Electric1x12x$ - 0=$ - 0
Lift, Gas/Diesel (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Lift, Electric (i.e. aerial, boom, scissor, man, cherry picker, etc.)1x12x$ - 0=$ - 0
Other Equipment (i.e. carts, pallet jack, pallet truck, pallet stacker, walkie stacker, reach truck, etc.)5x12x$ - 0=$ - 0
Baler/Compactor1x12x$ - 0=$ - 0
SECTION (A) TOTAL$ - 0
B. REPAIR SERVICES
DescriptionEstimated Number
of HoursxHourly Rate=Total
Normal Business Hours (7:00 a.m. to 3:00 p.m.)80x$ - 0=$ - 0
Outside Normal Business Hours12x$ - 0=$ - 0
Emergency Services12x$ - 0=$ - 0
SECTION (B) TOTAL$ - 0
C. PARTS
(Estimated Amount for Entire Contract Term)$ 50,000.00

TOTAL BASIS OF AWARD FOR SCW (A + B + C) $ - 0

&"Arial,Regular" California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5612630-D Exhibit B-1

&"Arial,Regular"Page &P of &N

File details come from the government source that posted it. Updated .