Exhibit_B-1_Rate_Sheet_Fillable.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
C5612448-D, Rebid 3_High Voltage Equipment Maintenance and Repair Services
Solicitation number
0000036031
Issued by
California

About this file

This is a Rate Sheet for High Voltage Equipment Maintenance and Repair Services issued by the California Department of Corrections and Rehabilitation (CDCR) for Bid Number C5612448-D, Rebid 3. The document covers preventative maintenance, inspection, testing, and repair services for high voltage electrical equipment across eight correctional facilities: California Correctional Institution (CCI), California Men's Colony (CMC), California Medical Facility (CMF), California State Prison Los Angeles County (LAC), Pelican Bay State Prison (PBSP), Richard J. Donovan Correctional Facility (RJD), Herman G. Stark Youth Correctional Facility (HGS), and Ventura Youth Correctional Facility (VYCF). The bid allows contractors to bid on one or more locations, with detailed rate sheets for switchgear, vacuum switches, circuit breakers, transformers, automatic transfer switches, and other electrical infrastructure components. Each facility has an estimated number of services and quantities for various electrical maintenance tasks, with services to be performed three times during the contract term.

The pricing structure includes three sections for each facility: preventative maintenance/inspection/testing services, repairs, and other costs. Each location has a budget for parts ($50,000-$100,000) and equipment rentals ($30,000), with an additional 25% allocation for as-needed services. Bidders must provide rates for all items within a location, with blank or zero-dollar cells potentially leading to bid rejection. The contract requires hourly rates to meet minimum prevailing wage determinations by the California Department of Industrial Relations. Contractors may offer a discount of at least 1% for invoices paid within 30 days, with a minimum discount of $50. In case of tied bids, the lowest responsible bid with the highest discount will prevail, and if discounts are also tied, a public coin toss will determine the winner.

View the file

Other files

File Type Posted
C5612448-D,_Rebid3_IFB_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Sheet

HIGH VOLTAGE EQUIPMENT MAINTENANCE AND REPAIR SERVICES
Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel, per diem, fuel, and mileage), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide all identified services.
Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
Hourly rates must meet minimum prevailing wage determination made by the Director of the California Department of Industrial Relations.
Each participating location’s total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder’s service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit B-1, Rate Sheet.
All CDCR estimated quantities and Contractor provided rates are for the entire term of this agreement.
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt =
In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts also tie, the awarded bidder shall be determined by a public coin toss.
There are no guarantees that any services will be requested from this agreement.
1. CALIFORNIA CORRECTIONAL INSTITUTION (CCI)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgear - 4,160 V Russ Electricx1x3=$ - 0
2Switchgear Industrial Electric, RSE sierra 4,160 Vx1x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx10x3=$ - 0
4Time Delay Starting/Closing Relay - 2x5x3=$ - 0
5Interlocking Relay - 3x5x3=$ - 0
6Rate of Change Relay - 7x5x3=$ - 0
7Distance Relay 21x5x3=$ - 0
8Monitor Relay - 25x5x3=$ - 0
9Voltz per Hertz Relay - 24x5x3=$ - 0
10Undervoltage Relay - 27x5x3=$ - 0
11Static Frequency Relay - 31x5x3=$ - 0
12Directional Power Relay - 32x5x3=$ - 0
13Undercurrent/Underpower Relay - 37x5x3=$ - 0
14Field Over/Under Excitation Relay - 40x1x3=$ - 0
15Unit Sequence Starting Relay - 44x5x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x2x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x5x3=$ - 0
18Incomplete Sequence Relay - 48x5x3=$ - 0
19Transformer Thermal Relay - 49x5x3=$ - 0
20Instantaneous Overcurrent Relay - 50x5x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x5x3=$ - 0
22Exciter or DC Generator Relay - 53x2x3=$ - 0
23Power Factor Relay - 55x2x3=$ - 0
24Field Application Relay - 56x2x3=$ - 0
25Rectification Failure Relay - 58x2x3=$ - 0
26Overvoltage Relay - 59x2x3=$ - 0
27Voltage or Current Balance Relay - 60x2x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x5x3=$ - 0
29Ground Detector Relay - 64x2x3=$ - 0
30AC Directional Overcurrent Relay - 64x2x3=$ - 0
31Blocking Relay - 68x2x3=$ - 0
32Alarm Relay - 74x2x3=$ - 0
33DC Overcurrent Relay - 76x2x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x5x3=$ - 0
36Frequency Relay - 81x2x3=$ - 0
37DC Reclosing Relay - 82x5x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x2x3=$ - 0
39Lockout Relay - 86x5x3=$ - 0
40Differential Protective Relay - 87x2x3=$ - 0
41Voltage Directional Relay - 91x2x3=$ - 0
42Voltage and Power Directional Relay - 92x2x3=$ - 0
43Tripping or Trip-Free Relay - 94x2x3=$ - 0
44Busbar Trip Lockout Relay - 96x2x3=$ - 0
45Voltage and Ampere Metersx4x3=$ - 0
46Control Transformersx3x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x3x3=$ - 0
48Potential Transformersx3x3=$ - 0
49Control and Instrument Switchesx10x3=$ - 0
50Position Switchx5x3=$ - 0
51Position Changing Mechanismx5x3=$ - 0
52Generator Step-Up Transformersx1x3=$ - 0
53Battery Chargerx2x3=$ - 0
54Batteriesx24x3=$ - 0
55Main Circuit Breaker - 4160x4x3=$ - 0
56Circuit Breaker - Voltage 4160x1x3=$ - 0
57Voltage Regulatorx2x3=$ - 0
VACUUM SWITCHES
3Bypass Isolation Switchx2x3=$ - 0
4Knife Switchx8x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 4160vx5x3=$ - 0
2Associated Componentsx5x3=$ - 0
TRANSFORMERS
1Pad Mounted Oil-Filled Transformer - 12 kVx22x3=$ - 0
2Pole Mounted Oil-Filled Transformer - 12 kVx3x3=$ - 0
3Dry Type Transformer - 4,160 Vx15x3=$ - 0
4Dry Type Transformer - 2,400 Vx5x3=$ - 0
5Pad mounted Oil-Filled Transformer - 2,400 Vx11x3=$ - 0
6Pad mounted Oil-Filled Transformer - 4,160 Vx4x3=$ - 0
7Pole mounted Oil-Filled Transformer - 2,400 Vx2x3=$ - 0
8Pole mounted Oil-Filled Transformer- 4,160 Vx12x3=$ - 0
9Oil Samplingx54x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - 4,160 Vx2x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switch (Air)x1x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Arms (Poles)x105x3=$ - 0
2Fuses (Cut outs)x41x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx200=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx200=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx100=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 50,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

CCI TOTAL BASIS OF AWARD (A + B + C) $ - 0

2. CALIFORNIA MEN'S COLONY (CMC)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgearx4x3=$ - 0
2Switchgear Filter, Lights, & Other Componentsx4x3=$ - 0
3Control Transformersx5x3=$ - 0
4Starter - Motor Controlx15x3=$ - 0
5Main Circuit Breakerx25x3=$ - 0
6Circuit Breakerx25x3=$ - 0
7Voltage Regulatorx25x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformerx7x3=$ - 0
2Oil-Filled Transformerx18x3=$ - 0
3Dry Type Transformerx20x3=$ - 0
4Oil Samplingx25x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switchx8x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx6x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx65x3=$ - 0
2Fusesx195x3=$ - 0
3Other Componentsx200x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx60=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 100,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

CMC TOTAL BASIS OF AWARD (A + B + C) $ - 0

3. CALIFORNIA MEDICAL FACILITY (CMF)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgear 12kV- Eatonx1x3=$ - 0
2Switchgear 4160v - Eatonx1x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx3x3=$ - 0
4Time Delay Starting/Closing Relay - 2x1x3=$ - 0
5Interlocking Relay - 3x4x3=$ - 0
6Rate of Change Relay - 7x2x3=$ - 0
7Distance Relay 21x21x3=$ - 0
8Monitor Relay - 25x1x3=$ - 0
9Voltz per Hertz Relay - 24x2x3=$ - 0
10Undervoltage Relay - 27x2x3=$ - 0
11Static Frequency Relay - 31x2x3=$ - 0
12Directional Power Relay - 32x1x3=$ - 0
13Undercurrent/Underpower Relay - 37x1x3=$ - 0
14Field Over/Under Excitation Relay - 40x1x3=$ - 0
15Unit Sequence Starting Relay - 44x1x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x1x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x1x3=$ - 0
18Incomplete Sequence Relay - 48x1x3=$ - 0
19Transformer Thermal Relay - 49x1x3=$ - 0
20Instantaneous Overcurrent Relay - 50x14x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x1x3=$ - 0
22Exciter or DC Generator Relay - 53x8x3=$ - 0
23Power Factor Relay - 55x1x3=$ - 0
24Field Application Relay - 56x6x3=$ - 0
25Rectification Failure Relay - 58x3x3=$ - 0
26Overvoltage Relay - 59x2x3=$ - 0
27Voltage or Current Balance Relay - 60x2x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x6x3=$ - 0
29Ground Detector Relay - 64x9x3=$ - 0
30AC Directional Overcurrent Relay - 64x3x3=$ - 0
31Blocking Relay - 68x1x3=$ - 0
32Alarm Relay - 74x1x3=$ - 0
33DC Overcurrent Relay - 76x1x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x3x3=$ - 0
36Frequency Relay - 81x1x3=$ - 0
37DC Reclosing Relay - 82x3x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x1x3=$ - 0
39Lockout Relay - 86x1x3=$ - 0
40Differential Protective Relay - 87x1x3=$ - 0
41Voltage Directional Relay - 91x1x3=$ - 0
42Voltage and Power Directional Relay - 92x2x3=$ - 0
43Tripping or Trip-Free Relay - 94x2x3=$ - 0
44Busbar Trip Lockout Relay - 96x1x3=$ - 0
45Voltage and Ampere Metersx1x3=$ - 0
46Control Transformersx6x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x2x3=$ - 0
48Potential Transformersx2x3=$ - 0
49Control and Instrument Switchesx2x3=$ - 0
50Position Switchx2x3=$ - 0
51Position Changing Mechanismx3x3=$ - 0
52Generator Step-Up Transformersx3x3=$ - 0
53Battery Chargerx9x3=$ - 0
54Batteriesx36x3=$ - 0
SWITCHGEAR
55Starter - Motor Control - Voltage 120vx1x3=$ - 0
56Main Circuit Breaker - Voltage 4160vx1x3=$ - 0
57Circuit Breaker - Voltage 208vx1x3=$ - 0
58Voltage Regulatorx1x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switchx6x3=$ - 0
2Bypass Isolation Switchx1x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 4160vx1x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformer - Voltage 12k/4160vx2x3=$ - 0
2Oil-Filled Transformer - Voltage 4160/480x10x3=$ - 0
3Dry Type Transformer - Voltage 480/208/120x26x3=$ - 0
4Oil Samplingx12x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 4160vx1x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx3x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - All Ratingsx2x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Cross Armsx30x90=$ - 0
2Fusesx3x9=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx150=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx60=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 50,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

CMF TOTAL BASIS OF AWARD (A + B + C) $ - 0

4. CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgear 12.4 kv /CGIx2x3=$ - 0
2Switchgear 12.4 KV CGI 1200 amps CGIx10x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx200x3=$ - 0
4Time Delay Starting/Closing Relay - 2x12x3=$ - 0
5Interlocking Relay - 3x10x3=$ - 0
6Volts per Hertz Relayx24x3=$ - 0
7Distance Relay 21x2x3=$ - 0
8Monitor Relay - 25x6x3=$ - 0
9Voltz per Hertz Relay - 24x24x3=$ - 0
10Undervoltage Relay - 27x4x3=$ - 0
11Static Frequency Relay - 31x3x3=$ - 0
12Directional Power Relay - 32x2x3=$ - 0
13Undercurrent/Underpower Relay - 37x9x3=$ - 0
14Field Over/Under Excitation Relay - 40x12x3=$ - 0
15Unit Sequence Starting Relay - 44x12x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x4x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x9x3=$ - 0
18Incomplete Sequence Relay - 48x4x3=$ - 0
19Transformer Thermal Relay - 49x4x3=$ - 0
20Ground Detector Relay - 50x8x3=$ - 0
21Alarm Relay -74x8x3=$ - 0
22Exciter or DC Generator Relay - 53x8x3=$ - 0
23Power Factor Relay - 55x3x3=$ - 0
24Field Application Relay - 56x4x3=$ - 0
25Trip Lockout Relays - 58x2x3=$ - 0
26Overvoltage Relay - 59x4x3=$ - 0
27Voltage or Current Balance Relay - 60x4x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x2x3=$ - 0
29Ground Detector Relay - 64x5x3=$ - 0
30AC Directional Overcurrent Relay - 64x23x3=$ - 0
31Position switchx30x3=$ - 0
32Alarm Relay - 74x22x3=$ - 0
33DC Overcurrent Relay - 76x34x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x10x3=$ - 0
36Frequency Relay - 81x2x3=$ - 0
37DC Reclosing Relay - 82x2x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x8x3=$ - 0
39Lockout Relay - 86x2x3=$ - 0
40Differential Protective Relay - 87x2x3=$ - 0
41Voltage Directional Relay - 91x2x3=$ - 0
42Voltage and Power Directional Relay - 92x2x3=$ - 0
43Tripping or Trip-Free Relay - 94x2x3=$ - 0
44Busbar Trip Lockout Relay - 96x2x3=$ - 0
45Voltage and Ampere Metersx16x3=$ - 0
46Control Transformersx4x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x10x3=$ - 0
48Potential Transformersx2x3=$ - 0
49Control and Instrument Switchesx36x3=$ - 0
50Position Switchx36x3=$ - 0
51Position Changing Mechanismx36x3=$ - 0
52Generator Step-Up Transformersx2x3=$ - 0
53Battery Chargerx4x3=$ - 0
54Batteriesx52x3=$ - 0
55Engine/ Generator Control Panel -Voltage 120 VDCx2x3=$ - 0
56Main Circuit Breaker - Voltage 150 Amps /120 VDCx1x3=$ - 0
57Circuit Breaker - Voltage 12470x9x3=$ - 0
58Voltage Regulatorx2x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switch Cooper Power Sys. Cat# 620L07G30 Mod # R-vac6Bx9x3=$ - 0
2Bypass Isolation Switchx36x3=$ - 0
3Oil Samplingx10x3=$ - 0
4Switches 4 Position 200 amp T-blade break befor makex36x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 12470 1200 amps Westinghouse Style # 3776A20G02x10x3=$ - 0
2Associated Components Type 150 VCPWx1x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformer - Voltagex1x3=$ - 0
2Oil-Filled Transformer - Voltage 12470/480/204x50x3=$ - 0
3Dry Type Transformer - Voltage 480/208x6x3=$ - 0
4Oil Samplingx68x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 12470/480x5x3=$ - 0
2Bypass Isolation Switch - Voltage 12470/ 480x5x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx3x3=$ - 0
2Load Interruptorsx3x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx120=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx120=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx120=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 75,000.00
Equipment Rentals=$ 75,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

LAC TOTAL BASIS OF AWARD (A + B + C) $ - 0

5. PELICAN BAY STATE PRISON (PBSP)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgear-15KV-GE 8 Sectionsx8x3=$ - 0
2Undervoltage Relay - 27x1x3=$ - 0
3Static Frequency Relay - 31x1x3=$ - 0
4Directional Power Relay - 32x2x3=$ - 0
5Undercurrent/Underpower Relay - 37x1x3=$ - 0
6Field Over/Under Excitation Relay - 40x3x3=$ - 0
7Reverse-phase or Phase-Balance Current Relay - 46x2x3=$ - 0
8AC Inverse Time Overcurrent Relay - 51x24x3=$ - 0
9Frequency Relay - 81x1x3=$ - 0
10Lockout Relay - 86x3x3=$ - 0
11Differential Protective Relay - 87x6x3=$ - 0
12Voltage and Ampere Metersx8x3=$ - 0
13Control Transformersx6x3=$ - 0
14Instrument Transformers (CT’s, PT’s)x23x3=$ - 0
15Potential Transformersx6x3=$ - 0
16Control and Instrument Switchesx10x3=$ - 0
17Generator Step-Up Transformers 480V-12460Vx2x3=$ - 0
18Battery Chargerx1x3=$ - 0
19Batteries Nickel Cadmiumx92x3=$ - 0
20Main Circuit Breaker -GE Power/Vac 15KV 1200Ampx9x3=$ - 0
21Voltage Regulatorx2x3=$ - 0
22Asco/Delta Engine Controlx2x3=$ - 0
23Relay 51/27x2x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switch-AB Chancex8x3=$ - 0
2Gas Insulated Vacuum Switchx2x3=$ - 0
3Oil Samplingx8x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - 480 Voltsx10x3=$ - 0
CONTINUOUS LOAD RECORDING
17-day periodx2x3=$ - 0
POWER POLES
1Fusesx6x3=$ - 0
2Pole Type Distribution Transformer 3 Phase 20KVx1x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx750=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx250=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx250=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 50,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

PBSP TOTAL BASIS OF AWARD (A + B + C) $ - 0

6. RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Distributionx1x3=$ - 0
2Sub Station Distribution Sectionx13x3=$ - 0
3Basler Relayx54x3=$ - 0
415 kv GE Vacuum Circuit Breakersx14x3=$ - 0
5Current Transformersx98x3=$ - 0
6Potential Transformersx18x3=$ - 0
7Ammetersx6x3=$ - 0
8Hertz Metersx2x3=$ - 0
9Kilo-Volt Meterx8x3=$ - 0
10Sens Battery Chargerx1x3=$ - 0
11Synchronizerx1x3=$ - 0
12Synscopex1x3=$ - 0
13KWH Meterx1x3=$ - 0
TRANSFORMERS
1Oil Filled Transformersx18x3=$ - 0
2Dry Type Transformersx46x3=$ - 0
3Oil Samplesx18x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx220=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx24=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx24=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 50,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

RJD TOTAL BASIS OF AWARD (A + B + C) $ - 0

7. HEMAN G. STARK YOUTH CORRECTIONAL FACILITY (HGS)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgear 12.4 KV-Pacilifc Electricx1x3=$ - 0
2Switchgear 12.4 KV - Westinghousex5x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx1x3=$ - 0
4Time Delay Starting/Closing Relay - 2x1x3=$ - 0
5Interlocking Relay - 3x1x3=$ - 0
6Rate of Change Relay - 7x1x3=$ - 0
7Distance Relay 21x1x3=$ - 0
8Monitor Relay - 25x1x3=$ - 0
9Voltz per Hertz Relay - 24x1x3=$ - 0
10Undervoltage Relay - 27x1x3=$ - 0
11Static Frequency Relay - 31x1x3=$ - 0
12Directional Power Relay - 32x1x3=$ - 0
13Undercurrent/underpower Relay - 37x1x3=$ - 0
14Field Over/Under Excitation Relay - 40x1x3=$ - 0
15Unit Sequence Starting Relay - 44x1x3=$ - 0
16Reverse-phase or Pase-Balance Current Relay - 46x1x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x1x3=$ - 0
18Incomplete Sequence Relay - 48x1x3=$ - 0
19Transformer Thermal Relay - 49x1x3=$ - 0
20Instantaneous Overcurrent Relay - 50x1x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x1x3=$ - 0
22Exciter or DC Generator Relayv - 53x1x3=$ - 0
23Power Factor Relay - 55x1x3=$ - 0
24Field Application Relay - 56x1x3=$ - 0
25Rectification Failure Relay - 58x1x3=$ - 0
26Overvoltage Relay - 59x1x3=$ - 0
27Voltage or Current Balance Relay - 60x1x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x1x3=$ - 0
29Ground Detector Relay - 64x1x3=$ - 0
30AC Directional Overcurrent Relay - 64x1x3=$ - 0
31Blocking Relay - 68x1x3=$ - 0
32Alarm Rleay - 74x1x3=$ - 0
33DC Overcurrent Relay - 76x1x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x1x3=$ - 0
35AC Closing Relay - 79x1x3=$ - 0
36Frequency Relay - 81x1x3=$ - 0
37DC Reclosing Relay - 82x1x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x1x3=$ - 0
39Lockout Relay - 86x1x3=$ - 0
40Differential Protective Relay - 87x1x3=$ - 0
41Voltage Directional Relay - 91x1x3=$ - 0
42Voltage and Power Directional Relay - 92x1x3=$ - 0
43Tripping and Trip-Free Relay - 94x1x3=$ - 0
44Busbar Trip Lockout Relay - 96x1x3=$ - 0
45Voltage and Ampere Metersx1x3=$ - 0
46Control Transformersx1x3=$ - 0
47Instrument Transformers (CT's, PT's)x1x3=$ - 0
48Potential Transformerx1x3=$ - 0
49Control and Instrument Switchesx1x3=$ - 0
50Position Switchx1x3=$ - 0
51Position Changing Mechanismx1x3=$ - 0
52Generator Step-Up Transformersx1x3=$ - 0
53Battery Chagerx1x3=$ - 0
54Batteriesx1x3=$ - 0
55Starter - Motor Control - Voltage 480x1x3=$ - 0
56Main Circuit Breaker - Voltage 480x1x3=$ - 0
57Circuit Breaker - Voltage 480x1x3=$ - 0
58Voltage Regulatorx1x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switch Cooper Power System Cat# 620L07G30 Mod #R-vac6Bx1x3=$ - 0
2Gas Insulated Vacuum Switchx1x3=$ - 0
3Bypass Isolation Switchx1x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - Voltage 12.45KV snf 480KVx1x3=$ - 0
TRANSFORMERS
1Oil-Filled Transformer - Voltage 12KV to 480 Voltsx1x3=$ - 0
2Dry Type Transformer - Voltage 480/208x10x3=$ - 0
3Oil Samplingx6x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - Voltage 12KVx1x3=$ - 0
2Bypass Isolation Switch - Voltage 12KVx1x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx1x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - All Ratingsx1x3=$ - 0
POWER POLES
1Cross Armsx6x3=$ - 0
2Fusesx1x3=$ - 0
3Other Componentsx1x3=$ - 0
4Pole mounted transformersx4x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx75=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx50=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx25=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 50,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

HGS TOTAL BASIS OF AWARD (A + B + C) $ - 0

8. VENTURA YOUTH CORRECTIONAL FACILITY (VYCF)
A. Preventative Maintenance, Inspection, and Testing Services
Equipment DescriptionCost per ServicexEstimated QuantityxEstimated Number of Services=Total
SWITCHGEAR
1Main Switchgear - Power Switch Centerx2x3=$ - 0
2Switchgear - Power Switch Center 4.8 kvx2x3=$ - 0
3Switchgear Filter, Lights, & Other Componentsx2x3=$ - 0
4Time Delay Starting/Closing Relay - 2x2x3=$ - 0
5Interlocking Relay - 3x2x3=$ - 0
6Rate of Change Relay - 7x2x3=$ - 0
7Distance Relay 21x2x3=$ - 0
8Monitor Relay - 25x2x3=$ - 0
9Voltz per Hertz Relay - 24x2x3=$ - 0
10Undervoltage Relay - 27x2x3=$ - 0
11Static Frequency Relay - 31x2x3=$ - 0
12Directional Power Relay - 32x2x3=$ - 0
13Undercurrent/Underpower Relay - 37x2x3=$ - 0
14Field Over/Under Excitation Relay - 40x2x3=$ - 0
15Unit Sequence Starting Relay - 44x2x3=$ - 0
16Reverse-phase or Phase-Balance Current Relay - 46x2x3=$ - 0
17Phase-Sequence or Phase-Balance Voltage Relay - 47x2x3=$ - 0
18Incomplete Sequence Relay - 48x2x3=$ - 0
19Transformer Thermal Relay - 49x2x3=$ - 0
20Instantaneous Overcurrent Relay - 50x2x3=$ - 0
21AC Inverse Time Overcurrent Relay - 51x2x3=$ - 0
22Exciter or DC Generator Relay - 53x2x3=$ - 0
23Power Factor Relay - 55x2x3=$ - 0
24Field Application Relay - 56x2x3=$ - 0
25Rectification Failure Relay - 58x2x3=$ - 0
26Overvoltage Relay - 59x2x3=$ - 0
27Voltage or Current Balance Relay - 60x2x3=$ - 0
28Time-Delay Stopping or Opening Relay - 62x2x3=$ - 0
29Ground Detector Relay - 64x2x3=$ - 0
30AC Directional Overcurrent Relay - 64x2x3=$ - 0
31Blocking Relay - 68x2x3=$ - 0
32Alarm Relay - 74x2x3=$ - 0
33DC Overcurrent Relay - 76x2x3=$ - 0
34Phase-Angle Measuring or Out-of-Step Relay - 78x2x3=$ - 0
35AC Closing Relay - 79x2x3=$ - 0
36Frequency Relay - 81x2x3=$ - 0
37DC Reclosing Relay - 82x2x3=$ - 0
38Automatic Selective Control or Transfer Relay - 83x2x3=$ - 0
39Lockout Relay - 86x2x3=$ - 0
40Differential Protective Relay - 87x2x3=$ - 0
41Voltage Directional Relay - 91x2x3=$ - 0
42Voltage and Power Directional Relay - 92x2x3=$ - 0
43Tripping or Trip-Free Relay - 94x2x3=$ - 0
44Busbar Trip Lockout Relay - 96x2x3=$ - 0
45Voltage and Ampere Metersx2x3=$ - 0
46Control Transformersx2x3=$ - 0
47Instrument Transformers (CT’s, PT’s)x2x3=$ - 0
48Potential Transformersx2x3=$ - 0
49Control and Instrument Switchesx2x3=$ - 0
50Position Switchx2x3=$ - 0
51Position Changing Mechanismx2x3=$ - 0
52Generator Step-Up Transformersx2x3=$ - 0
53Battery Chargerx2x3=$ - 0
54Batteriesx2x3=$ - 0
55Starter - Motor Control - Voltage - 4.8 kVx2x3=$ - 0
56Main Circuit Breaker - Voltage - 4.8 kVx2x3=$ - 0
57Circuit Breaker - Voltage - 4.8 kVx2x3=$ - 0
58Voltage Regulatorx2x3=$ - 0
VACUUM SWITCHES
1Liquid Insulated Vacuum Switchx2x3=$ - 0
2Gas Insulated Vacuum Switchx2x3=$ - 0
3Bypass Isolation Switchx2x3=$ - 0
CIRCUIT BREAKER
1Circuit Breaker - 4.8 kvx2x3=$ - 0
2Associated Componentsx2x3=$ - 0
TRANSFORMERS
1Main Oil-Filled Transformer - Voltage - 4,160 Vx2x3=$ - 0
3Dry Type Transformer - Voltage - 4,160 V, 150 kVAx2x3=$ - 0
AUTOMATIC TRANSFER SWITCHES
1Automatic Transfer Switch - 5 kVx2x3=$ - 0
2Bypass Isolation Switchx2x3=$ - 0
CIRCUIT SWITCHER
13-Phase High Voltage Switchx2x3=$ - 0
2Load Interruptorsx2x3=$ - 0
CAPACITOR BANK
1KVAR Capacitor Bank - All Ratingsx2x3=$ - 0
POWER POLES
1Cross Armsx2x3=$ - 0
2Fusesx2x3=$ - 0
3Other Componentsx2x3=$ - 0
SECTION (A) TOTAL$ - 0
B. Repairs
Service DescriptionHourly RatexEstimated Number of Hours=Total
1High Voltage Routine Repairs - Scheduledx80=$ - 0
2High Voltage Emergency Repairs - Normal Business Hoursx80=$ - 0
3High Voltage Emergency Repairs - Outside of Normal Business Hoursx80=$ - 0
SECTION (B) TOTAL$ - 0
C. Other
Description=Total
Parts (not included under Preventative Maintenance)=$ 50,000.00
Equipment Rentals=$ 30,000.00
As-Needed Services (25%)=$ - 0
SECTION (C) TOTAL$ - 0

VYCF TOTAL BASIS OF AWARD (A + B + C) $ - 0

&"Arial,Regular" California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5612448-D, Rebid 3 Exhibit B-1

&"Arial,Regular"Page &P of &N

File details come from the government source that posted it. Updated .