Exhibit_B-1_-_Rate_Sheet_Excel_Version.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 0000040893
About this file
This rate sheet is an Excel-based pricing document for a California Department of Corrections and Rehabilitation (CDCR) competitive bid (Bid Number C5613752-D) for steam boiler system installation and rental services at the Richard J. Donovan Correctional Facility in San Diego, California. The project requires contractors to deliver and install a portable boiler package unit (PBPU) consisting of a minimum 600 horsepower ASME 3 Pass Dry Back Package Firetube Boiler with Low NOx Burner that meets San Diego Air Pollution Control District regulatory requirements. The rate sheet identifies five line items for pricing: rental of all components (36 monthly occurrences), installation of the portable boiler package unit and associated components (1 per event), preventative maintenance services (36 monthly occurrences), training services with a 4-hour minimum (1 per event), and equipment removal (1 per event). Bidders are required to submit a dollar amount for each line item, with failure to provide pricing grounds for bid rejection; a zero dollar amount will be interpreted as the contractor performing services at no cost to the State.
All prices must be submitted in U.S. currency and shall encompass every expense necessary to perform the services. Contractors may offer a discount on invoices for payment within thirty days of receipt, with the discount requirement set at a minimum of one percent and $50.00; in the event of tied bids, the highest discount offered will prevail for award consideration. The State reserves the right to omit portions of work as deemed necessary and clarifies that quantities listed on the rate sheet are estimates only and do not obligate the State to utilize the full estimated quantities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_Bid_Package_C5613752-D.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
STEAM BOILER SYSTEM INSTALLATION AND RENTAL SERVICES
RICHARD J DONOVAN CORRECTIONAL FACILITY
| Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders are encouraged to download the Excel version and complete all highlighted cells. |
| Any quantities listed on Exhibit B-1, Rate Sheet are CDCR's estimates only and are offered as a basis for comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. |
| NOTE: Bidder is required to bid each item. Failure to indicate a dollar amount in any item may be grounds to reject the entire bid. A zero dollar ($0.00) amount listed for any and all items will be interpreted and understood to the State to mean that the bidder indicating a zero dollar amount shall perform any such services at no cost to the State. |
| All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services. |
| STEAM BOILER SYSTEM INSTALLATION AND RENTAL SERVICES |
| DESCRIPTION |
tc={A5DB002C-9FE9-4B55-ABC7-3FFC52793A48}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Should Section 5. Repair Services be referenced in any of the line items below?
Reply:
| See comment in email | RATE | X | QUANTITY | FREQUENCY | = | TOTAL | |
| Rental of All Components | X | 36 | Monthly | = | $ - 0 | ||
| Installation of Portable Boiler Package Unit (PBPU), hoses, piping and electrical as specified in Exhibit A, Scope of Work, Sections 2, 3, and 6 | X | 1 | Per Event | = | $ - 0 | ||
| Preventative Maintenance, as specified in Exhibit A, Scope of Work, Section 4 | X | 36 | Monthly | = | $ - 0 | ||
| Training as specified in Exhibit A, Scope of Work, Section 7 (4 hour minimum) | X | 1 | Per Event | = | $ - 0 | ||
| Equipment Removal as specified in Exhibit A, Scope of Work, Section 8 | X | 1 | Per Event | = | $ - 0 | ||
| TOTAL OF ALL ITEMS ABOVE | = | $ - 0 | |||||
| BASIS FOR AWARD |
| Contractor may offer a discount on invoices in order for the invoices to be paid within thirty (30) days of receipt. Discount offered must be at least one percent (1 %) and a minimum of $50.00. | |
| Discount offered on invoices to be paid within 30 days of receipt = | % |
| *The percent of discount (highest discount prevails) may be used in the event of tie bids. Refer to the Invitation for Bid, Basis for Award. |
Should Section 5. Repair Services be referenced in any of the line items below?
See comment in email
&"Arial,Regular"TBB California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5613752-D Exhibit B-1
&"Arial,Regular"Page 1 of 1
File details come from the government source that posted it. Updated .