Exhibit_B-1_Rate_Sheet_-_Excel.xls

XLS spreadsheet 144 KB Posted

Attached to
C5612146-D - MCQUAY AND YORK CHILLERS MAINTENANCE, REPAIR, AND INSPECTION SERVICES
Solicitation number
0000032085
Issued by
California

About this file

This document is an Excel rate sheet (Exhibit B-1) for a state contract opportunity issued by the California Department of Corrections and Rehabilitation (CDCR) for MCQUAY AND YORK CHILLER MAINTENANCE, REPAIR, AND INSPECTION SERVICES. The contract includes maintenance, repair, and inspection services on McQuay and York chillers and chilled water cooling towers at two CDCR facilities: Ironwood State Prison (ISP) and Chuckawalla Valley State Prison (CVSP). The rate sheet includes pricing for annual maintenance, semi-annual maintenance, Eddy current testing, leak checks, and hourly repair rates. The contract term is not specified. Bidders must bid on all items, and the State reserves the right to add or remove institutions from the agreement.

The rate sheet requires bidders to provide pricing for each line item and specify a discount percentage for invoices paid within 30 days. The discount percentage may be used to break tie bids. The contract has an estimated parts budget of $175,000 for ISP and $10,000 for CVSP. Bidders are not allowed to charge for travel time or per diem, as those costs should be included in the provided rates.

View the file

Other files

File Type Posted
IFB_Package_C5612146-D.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

MCQUAY AND YORK CHILLER MAINTENANCE, REPAIR, AND INSPECTION SERVICES
Electronic bid packages include an Excel version (Exhibit B-1) in addition to the PDF file, to assist bidders in computing accurate totals. Bidders should dowload the Excel version and complete all highlighted cells.
NOTE: Bidder is required to bid each item. Failure to indicate a dollar amount in any item will be grounds to reject the entire bid. A zero-dollar ($0.00) amount for any and all items will be interpreted and understood by the State to mean that the Bidder indicating a zero-dollar ($0.00) amount shall perform any such services at no cost to the State.Any quantities listed on Exhibit B-1 are CDCR's estimates only and are offered as basis for the comparision of bids. The State will not pay for travel time and per diem as it should be included in any ratees at the time of bidding for this job.
The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may be deemed necessary or advisable by the State. The State reserves the aright to add or remove Institutions from this Agreement.
All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall

encompass every item of expense necessary to perform the services.

Ironwood State Prison (ISP) York Chillers
A. Annual Maintenance Services
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X3=
Chiller # 2X3=
Chiller # 3X3=
Chilled water cooling towerx3
Chilled water cooling towerX3=
Chilled water cooling towerX3=
TOTAL A =
B. Semi-Annual Maintenance Services
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X6=
Chiller # 2X6=
Chiller # 3X6=
TOTAL B =
C.1 Eddy Testing three (3) year Condenser Test
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X1=
Chiller # 2X1=
Chiller # 3X1=
TOTAL C.1 =
C.2 Eddy Current Testing five (5) year Evaporator Test
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X1=
Chiller # 2X1=
Chiller # 3X1=
TOTAL C.2 =
D. Leak Check on condenser and evaporator (with Hyper Watt Pressurizer)
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X6=
Chiller # 2X6=
Chiller # 3X6=
TOTAL D =
E. Repair Hourly Rate
Repair Hourly RateCost Per Hour, Per CrewXEstimated No. of Hours=Total
Repair Hourly RateX500=
Emergency Call Hourly RateX300=
Total E =
F. Parts
Estimate of Parts for Agreement Term$175,000.00
ISP Total of A+B+C.1+C.2+D+E+F=
Chuckawalla Valley State Prison (CVSP) McQuay Chillers
A. Annual Maintenance Services
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X3=
Chiller # 2X3=
Chiller # 3X3=
Chilled water cooling towerx3
Chilled water cooling towerX3=
Chilled water cooling towerX3=
TOTAL A =
B. Semi-Annual Maintenance Services
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X6=
Chiller # 2X6=
Chiller # 3X6=
TOTAL B =
C.1 Eddy Testing three (3) year Condenser Test
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X1=
Chiller # 2X1=
Chiller # 3X1=
TOTAL C.1 =
C.2 Eddy Current Testing five (5) year Evaporator Test
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X1=
Chiller # 2X1=
Chiller # 3X1=
TOTAL C.2 =
D. Leak Check on condenser and evaporator (with Hyper Watt Pressurizer)
EquipmentCost Per UnitXEstimated No. of Services=TOTAL
Chiller # 1X6=
Chiller # 2X6=
Chiller # 3X6=
TOTAL D =
E. Repair Hourly Rate
Repair Hourly RateCost Per Hour, Per CrewXEstimated No. of Hours=Total
Repair Hourly RateX500=
Emergency Call Hourly RateX300=
Total E =
F. Parts
Estimate of Parts for Agreement Term$10,000.00
CVSP Total of A+B+C.1+C.2+D+E+F =
Sum of ISP Total and CVSP Total =
BASIS OF AWARD
Contractor may offer a discount to the amount paid on invoices received and accepted by the CDCR in order for the invoices to be paid within thirty (30) days of receipt. Discount offered on invoices must be at least one percent of the invoice amount and a minimum of $50.00.

Discount offered on invoices paid within 30 days of receipt = _________ %

*The percent of the discount (highest discount prevails) may be used in the event of tie bids. Refer to the notice to prospective Bidders, Bid Submission Requirements.

&L&11TBB

California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &R&11Bid Number C5612146-D Exhibit B-1 &C&11Page &P of &N

File details come from the government source that posted it. Updated .