This is a Public Works Rate Sheet (Exhibit B-1) for the California Department of Corrections and Rehabilitation (CDCR) for concrete debris removal and slope stabilization services at the Richard J. Donovan Correctional Facility in San Diego, California. The project involves three phases: Phase 1 consists of clearing and grubbing the project work area, removing concrete debris, and re-grading a delineated fill area; Phase 2 involves hydroseeding disturbed areas; and Phase 3 requires assessing and addressing hydroseeding development issues. Bidders must complete the Excel version of the rate sheet by entering dollar amounts for each phase, with all three phases requiring pricing. The contract will be compensated on a progressive payment basis with payments made no more frequently than monthly in arrears upon completion of each phase. All prices must be submitted in U.S. currency and must encompass every item of expense necessary to perform the services, including labor, insurance, bonds, licenses, travel, materials, equipment rental, and training. Bidders are required to bid each item; failure to provide a dollar amount for any item may result in bid rejection, and a zero dollar amount indicates the bidder will perform that service at no cost to the State.
The bid evaluation process includes California company reciprocal preference provisions under Public Contract Code Section 6107, available only to bidders who certify they qualify as California companies with a licensed California contractor status and meet specified principal place of business requirements. Bidders must disclose all proposed subcontractors performing work exceeding one-half of one percent of the general contractor's total bid, along with their California Contractors State License Board license numbers and Public Works Contractor Registration Numbers. The contract requires certified Disabled Veteran Business Enterprise (DVBE) subcontractors to be listed if used to fulfill DVBE participation goals. Contractors may offer a discount of at least one percent of the invoice amount with a minimum of fifty dollars for payment within thirty days of invoice receipt; in the event of a tie bid, the lowest responsible bid with the highest discount shall prevail, and if discounts also tie, the awarded bidder will be determined by public coin toss.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Phased PW Rate Sheet
| CONCRETE DEBRIS REMOVAL AND SLOPE STABILIZATION |
| RICHARD J DONOVAN CORRECTIONAL FACILITY |
| Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells. CDCR will make progress payments no more often than monthly in arrears upon completion of each phase. No progress payment will be made until Contractor’s invoice has been furnished and approved by the CDCR Representative. The Bidder shall set forth in clear legible figures the total RATE PER PHASE where required in the spaces provided below. Bid shall be Progressive Payment for all contract work. |
| All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services. |
| Note: Bidder is required to bid each item. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds to reject the entire bid. A zero dollar amount ($0.00 or $ - ) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. |
| PHASE | PHASE DESCRIPTION | RATE PER PHASE |
| 1 | Clear and grub project work area; remove concrete debris, and re-grade delineated fill area | |
| 2 | Hydroseed disturbed areas | |
| 3 | Assess and address hydroseeding development issues | |
| TOTAL BID AMOUNT (Phases 1+2+3) | $ - 0 | |
| Basis For Award |
If awarded the contract, the Contractor agrees to sign the contract and to furnish the applicable bonds and certificates of insurance as required and start the work when notified.
Pursuant to Public Contract Code Section 6107, in awarding contracts for construction, a State agency shall grant a California company a reciprocal preference against a nonresident contractor with the lowest responsive bid, except where the resident contractor is eligible for a California small business preference, in which case the preference applied shall be the greater of the two, but not both.
NOTE: THIS RECIPROCAL PREFERENCE IS AVAILABLE ONLY TO BIDDERS WHO CERTIFY, UNDER PENALTY OF PERJURY, THAT THEY QUALIFY AS CALIFORNIA COMPANIES.
In order to qualify as a "California company" under California Public Contract Code Section 6107, a business entity must be a licensed California contractor at the time of the bid opening and must meet one of the following requirements:
1. Has its principal place of business in California.
2. Has its principal place of business in a state in which there is no local contractor preference on construction contracts.
3. Has its principal place of business in a state in which there is no local contractor preference on construction contracts, but the bidder has paid not less than Five Thousand Dollars ($5,000) in sales or use taxes to California for construction related activity for each of the five years immediately preceding the submission of the bid.
| Does bidder certify, under penalty of perjury, that the bidder qualifies as a California company? |
| Yes ____ No ____ |
Nonresident bidder must disclose any and all bid preferences provided to the nonresident bidder by the state or country in which the nonresident bidder has its principal place of business at the time of bid submission. Therefore, if the bidder has answered “No” above, use this space to disclose any such preference. (If none, indicate):
Preference given:
By signing the Bidder Acknowledgement/Certification (OBS 300), the bidder certifies under penalty of perjury the correctness of this statement. Bidders are cautioned that making false certification may result in rejection of the bid or legal action or both.
The bidder shall set forth in the bid:
1. The name and business address of each subcontractor who will perform work or labor or render service in an amount in excess of one-half of one percent of the general contractor's total bid; and
2. The portion of work to be performed by each subcontractor. (See California Public Contract Code Sections 4100 through 4108, inclusive.)
3. In addition, effective January 1,1994, pursuant to the California Public Contract Code Section 10115 et seq., prime contractors MUST list on their Bid Proposal all certified DVBE subcontractors who will perform work or labor or render service to the prime contractor in connection with the performance of the contract and who will be used by the prime contractor to fulfill DVBE participation goals. The prime contractor shall list only one subcontractor for each portion as is defined by the prime contractor in his/her bid.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Kind of Work Percentage of work to be performed in relation to overall bid amount Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
Contractor may offer a discount to the amount paid on invoices received and accepted by the CDCR in order for the invoices to be paid within thirty (30) days of receipt. Discount offered on invoices must be at least one percent (1%) of the invoice amount and a minimum of $50.00.
Discount offered on invoices to be paid within 30 days of receipt = %*
* In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts' also tie, the awarded bidder shall be determined by a public coin toss. Refer to the Invitation for Bid, Basis for Award.