Exhibit_B-1_-_Public_Works_Rate_Sheet_Excel_Version.xlsx
XLSX spreadsheet 278 KB Posted
- Solicitation number
- 0000040890
- Issued by
- Alameda County, Alpine County, Amador County, Butte County, Calaveras County, Colusa County, Contra Costa County, Del Norte County, El Dorado County, Fresno County, Glenn County, Humboldt County, Imperial County, Inyo County, Kern County, Kings County, Lake County, Lassen County, Los Angeles County, Madera County, Marin County, Mariposa County, Mendocino County, Merced County, Modoc County, Mono County, Monterey County, Napa County, Nevada County, Orange County, Placer County, Plumas County, Riverside County, Sacramento County, San Benito County, San Bernardino County, San Diego County, San Francisco County, San Joaquin County, San Luis Obispo County, San Mateo County, Santa Barbara County, Santa Clara County, Santa Cruz County, Shasta County, Sierra County, Siskiyou County, Solano County, Sonoma County, Stanislaus County, Sutter County, Tehama County, Trinity County, Tulare County, Tuolumne County, Ventura County, Yolo County, Yuba County, Alameda City, Alpine Village CDP, Amador City, Amador Pines CDP, Sutter Creek City, Butte Creek Canyon CDP, Butte Meadows CDP, Butte Valley CDP, Rancho Calaveras CDP, Colusa City, Contra Costa Centre CDP, Auburn Lake Trails CDP, El Dorado Hills CDP, Placerville City, South Lake Tahoe City, Fresno City, Kingsburg City, Orange Cove City, San Joaquin City, Shaver Lake CDP, Blue Lake City, Humboldt Hill CDP, Imperial City, Alta Sierra CDP, China Lake Acres CDP, Glennville CDP, Inyokern CDP, Kernville CDP, Lake Isabella CDP, Lake of the Woods CDP, Lakeside CDP, Hidden Valley Lake CDP, Lakeport City, Lower Lake CDP, North Lakeport CDP, Upper Lake CDP, East Los Angeles CDP, Elizabeth Lake CDP, Lake Hughes CDP, Lake Los Angeles CDP, Lakewood City, Los Angeles City, Marina Del Rey CDP, Monterey Park City, San Marino City, Sierra Madre City, Bass Lake CDP, Madera City, Madera Acres CDP, Madera Ranchos CDP, Yosemite Lakes CDP, Corte Madera Town, Lucas Valley-Marinwood CDP, Marin City CDP, Lake Don Pedro CDP, Mariposa CDP, Mendocino CDP, Merced City, University of California-Merced CDP, Lake City CDP, Crowley Lake CDP, June Lake CDP, Mammoth Lakes Town, Mono City CDP, Twin Lakes CDP, Virginia Lakes CDP, Marina City, Monterey City, Napa City, Lake of the Pines CDP, Lake Wildwood CDP, Nevada City, Lake Forest City, Orange City, Kings Beach CDP, Bucks Lake CDP, Lake Almanor Country Club CDP, Lake Almanor Peninsula CDP, Lake Almanor West CDP, Lake Davis CDP, Plumas Eureka CDP, Canyon Lake City, Lake Elsinore City, Lakeland Village CDP, Lake Mathews CDP, Lake Riverside CDP, Lakeview CDP, Riverside City, Orangevale CDP, Sacramento City, Big Bear Lake City, Lake Arrowhead CDP, San Bernardino City, Silver Lakes CDP, Spring Valley Lake CDP, Alpine CDP, Imperial Beach City, Lake San Marcos CDP, Rancho San Diego CDP, San Diego City, San Diego Country Estates CDP, San Francisco City, Lake Nacimiento CDP, San Luis Obispo City, Emerald Lake Hills CDP, San Mateo City, South San Francisco City, Santa Barbara City, University of California-Santa Barbara CDP, Santa Clara City, Santa Cruz City, Lakehead CDP, Shasta CDP, Shasta Lake City, Sierra Brooks CDP, Sierra City CDP, Sierraville CDP, Lake Shastina CDP, Mount Shasta City, Sonoma City, Sonoma State University CDP, Monterey Park Tract CDP, Orange Blossom CDP, Sutter CDP, Yuba City, Lake California CDP, Rancho Tehama Reserve CDP, Tehama City, Trinity Center CDP, Trinity Village CDP, East Tulare Villa CDP, Tulare City, Mono Vista CDP, Phoenix Lake CDP, Pine Mountain Lake CDP, Sierra Village CDP, Tuolumne City CDP, Lake Sherwood CDP, West Sacramento City, Yolo CDP, Plumas Lake CDP, California
About this file
Summary
This is a Public Works Rate Sheet (Exhibit B-1) for a Master Agreement issued by the California Department of Corrections and Rehabilitation (CDCR) for asbestos abatement, lead-based paint, lead-containing paint, lead-containing materials, and mold removal services across multiple correctional facilities. The contract covers 13 institution groups comprising facilities such as Avenal State Prison, Pleasant Valley State Prison, Calipatria State Prison, Centinela State Prison, California Correctional Institution, Central California Women's Facility, Valley State Prison, California Health Care Facility, California Institution for Men, California Institution for Women, California Men's Colony, California Medical Facility, California State Prison Solano, California State Prison Corcoran, Substance Abuse Treatment Facility, Correctional Training Facility, Salinas Valley State Prison, Female Community Reentry Program San Diego, Female Community Reentry Program Santa Fe Springs, Folsom State Prison, and California State Prison Sacramento. The scope of work encompasses 45 line items covering non-emergency services including asbestos floor tiles, roofing, ceilings, walls, flooring, piping, thermal insulation, lead-based paint removal, lead-containing materials, mold remediation, underground storage tank removal, and additional submittals, emergency services, decontamination, containment, mobilization, and demobilization. Bidders may elect to bid on one or more institution groups but must bid on all locations within each selected group and complete all items within that group.
Pricing must be provided in U.S. currency and shall encompass all expenses necessary to perform services including labor, travel, per diem, parts, equipment, materials, supplies, insurance, transportation, personal protective equipment, licenses, certifications, permits, and bonds. The state's estimated contract values vary by group, ranging from $150,000 for the smallest groups to $5,000,000 for the largest. Payment is made monthly in arrears upon completion of each phase following invoice approval. Bidders may offer a discount on invoices of at least one percent (1%) with a minimum of $50 to receive payment within 30 days; in case of ties, the bid with the highest discount prevails, with any remaining ties resolved by public coin toss. Bidders must certify whether they qualify as California companies under Public Contract Code Section 6107 to claim reciprocal preference. Prime contractors must disclose all subcontractors performing work exceeding one-half of one percent of the total bid and list certified Disabled Veteran Business Enterprise (DVBE) subcontractors designated to fulfill DVBE participation goals. Any blank cell or failure to indicate a dollar amount for line items may result in bid rejection, and a zero dollar amount indicates the bidder will perform that service at no cost to the state.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_Bid_Package_C5613679-D.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| Electronic bid packages include an Excel version of this Public Works Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete all highlighted cells. CDCR will make payments no more often than monthly in arrears upon completion of each phase. No payment will be made until Contractor’s invoice has been furnished and approved by the CDCR Representative. |
| All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services. |
NOTE: Bidders may bid on one (1) or more institution groups. Bidders are not required to bid on all groups. However, if bidding on a group, your bid shall be for all locations within each group. Each item within the selected group you are bidding must be completed. Failure to indicate a dollar amount (BLANK CELL) in any item may be grounds to reject the entire bid. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder shall perform any such services at NO COST to the State. Rates must include all fees and taxes.
Any quantities listed on Exhibit B-1, Public Works Rate Sheet are CDCR's estimates only. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to omit portions of the work as may deemed necessary or advisable by the State.
The "Basis for Award" for each Group is strictly used for bidding purposes only to determine the lowest responsive bidder.
NOTE: The State makes no guarantee that any institution which is included in this bid package, will request services.
If awarded the contract, the Contractor agrees to sign the contract and to furnish the applicable bonds and certificates of insurance as required and start the work when notified.
Pursuant to Public Contract Code Section 6107, in awarding contracts for construction, a State agency shall grant a California company a reciprocal preference against a nonresident contractor with the lowest responsive bid, except where the resident contractor is eligible for a California small business preference, in which case the preference applied shall be the greater of the two, but not both.
NOTE: THIS RECIPROCAL PREFERENCE IS AVAILABLE ONLY TO BIDDERS WHO CERTIFY, UNDER PENALTY OF PERJURY, THAT THEY QUALIFY AS CALIFORNIA COMPANIES.
In order to qualify as a "California company" under California Public Contract Code Section 6107, a business entity must be a licensed California contractor at the time of the bid opening and must meet one of the following requirements:
1. Has its principal place of business in California.
2. Has its principal place of business in a state in which there is no local contractor preference on construction contracts.
3. Has its principal place of business in a state in which there is no local contractor preference on construction contracts, but the bidder has paid not less than Five Thousand Dollars ($5,000) in sales or use taxes to California for construction related activity for each of the five years immediately preceding the submission of the bid.
| Does bidder certify, under penalty of perjury, that the bidder qualifies as a California company? |
| Yes ____ No ____ |
Nonresident bidder must disclose any and all bid preferences provided to the nonresident bidder by the state or country in which the nonresident bidder has its principal place of business at the time of bid submission. Therefore, if the bidder has answered “No” above, use this space to disclose any such preference. (If none, indicate):
Preference given:
By signing the Bidder Acknowledgement/Certification (OBS 300), the bidder certifies under penalty of perjury the correctness of this statement. Bidders are cautioned that making false certification may result in rejection of the bid or legal action or both.
The bidder shall set forth in the bid:
1. The name and business address of each subcontractor who will perform work or labor or render service in an amount in excess of one-half of one percent of the general contractor's total bid; and
2. The portion of work to be performed by each subcontractor. (See California Public Contract Code Sections 4100 through 4108, inclusive.)
3. In addition, effective January 1,1994, pursuant to the California Public Contract Code Section 10115 et seq., prime contractors MUST list on their Bid Proposal all certified DVBE subcontractors who will perform work or labor or render service to the prime contractor in connection with the performance of the contract and who will be used by the prime contractor to fulfill DVBE participation goals. The prime contractor shall list only one subcontractor for each portion as is defined by the prime contractor in his/her bid.
Contractor may offer a discount to the amount paid on invoices received and accepted by the CDCR in order for the invoices to be paid within thirty (30) days of receipt. Discount offered on invoices must be at least one percent (1%) of the invoice amount and a minimum of $50.00.
Discount offered on invoices to be paid within 30 days of receipt = %*
* In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts' also tie, the awarded bidder shall be determined by a public coin toss. Refer to the Invitation for Bid, Basis for Award.
&12TBB
California Department of Corrections and Rehabilitation (CDCR) Public Works Rate Sheet &12Bid Number C5613679-D Exhibit B-1
&12Page &P of &N
1 ASP-PVSP
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| AVENAL STATE PRISON (ASP) |
| PLEASANT VALLEY STATE PRISON (PVSP) |
| Group 1: ASP, PVSP | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 19 | Aboveground Asbestos Piping 4-1/2" to 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 20 | Underground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 21 | Underground Asbestos Piping 4-1/2" - 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 22 | Asbestos Thermal System Insulation from Metal Piping 1/2" to 4-1/4" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 23 | Asbestos Thermal System Insulation from Metal Piping 4-1/2" to 10" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 24 | Asbestos Thermal System Insulation from Air Handler Units, Duct Work, Boilers and Tanks (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 25 | Lead-Based Paint Coated Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 26 | Lead-Based Paint Coated Piping 4-1/2" to 10" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | ||
| 27 | Lead-Based Paint Interior/Exterior Surfaces (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 28 | Lead-Based Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 29 | Lead-Containing Paint Interior/Exterior Surfaces (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 30 | Lead-Containing Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 31 | Soil Contaminated with Lead (Per cubic ft) | x | 100 Cubic feet | = | $ - 0 | ||
| 32 | Exterior Surfaces (includes driveways, walkways, curbs) Contaminated with Lead (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 33 | Plywood/Drywall with Lead (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 34 | Plywood/Drywall with Mold (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 35 | Insulation with Mold (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 36 | Floor Covering (Carpet/Vinyl) with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 37 | Ceiling Tile with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 38 | Lumber with Mold (Per linear ft) | x | 300 Linear feet | = | $ - 0 | ||
| 39 | Plumbing Fixtures with Mold | x | 50 Each | = | $ - 0 | ||
| 40 | Plumbing Fixtures with Lead | x | 50 Each | = | $ - 0 | ||
| 41 | Underground Storage Tanks | ||||||
| (1,000 gallons or less) | x | 1 Each | = | $ - 0 | |||
| 42 | Underground Storage Tanks | ||||||
| (1,001 - 5,000 gallons) | x | 1 Each | = | $ - 0 | |||
| 43 | Cabinets (including tops) with Mold | ||||||
| (Per cubic ft) | x | 200 Cubic feet | = | $ - 0 | |||
| 44 | Lead-Containing Materials (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 45 | Lead-Containing Ceramic Tile (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| Subtotal of Section A | = | $ - 0 | |||||
| B. SUBMITTALS | |||||||
| Item | Cost Per Each | x | Estimated Number of Submittals | = | Total | ||
| Submittals | x | 1 Each | = | $ - 0 | |||
| C. EMERGENCY SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours | = | Total | ||
| Emergency Call Out Charge for Abatement Work* | x | 40 Hours | = | $ - 0 | |||
| *Emergency Call Out Charge includes costs for abatement and disposal as described in Scope of Work. | |||||||
| D. DECONTAMINATION / CONTAINMENT | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Decontamination* | x | 1 Each | = | $ - 0 | |||
| Containment* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section D | = | $ - 0 | |||||
| *Cost for Decontamination/Containment includes items described in Scope of Work. | |||||||
| E. MOBILIZATION / DEMOBILIZATION | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Mobilization* | x | 1 Each | = | $ - 0 | |||
| Demobilization* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section E | = | $ - 0 | |||||
| *Cost for Mobilization/Demobilization includes items described in Scope of Work. | |||||||
| F. NON-TYPICAL SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours Per Quoted Service per Agreement Term | = | Total | ||
| Non-Typical Quoted Services not identified as any items listed on the rate sheet | x | 40 Hours | = | $ - 0 |
| TOTAL BID AMOUNT GROUP 1 (SUM OF A, B, C, D, E & F) = | $ - 0 |
| BASIS FOR AWARD |
THE AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $2,300,000.00.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Percentage of work to be performed in relation to overall bid amount Kind of Work Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
&12TBB
California Department of Corrections and Rehabilitation (CDCR) Public Works Rate Sheet &12Bid Number C5613679-D
&12Page &P of &N
2 CAL-CEN
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| CALIPATRIA STATE PRISON (CAL) |
| CENTINELA STATE PRISON (CEN) |
| Group 2: CAL, CEN | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 19 | Aboveground Asbestos Piping 4-1/2" to 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 20 | Underground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 21 | Underground Asbestos Piping 4-1/2" - 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 22 | Asbestos Thermal System Insulation from Metal Piping 1/2" to 4-1/4" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 23 | Asbestos Thermal System Insulation from Metal Piping 4-1/2" to 10" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 24 | Asbestos Thermal System Insulation from Air Handler Units, Duct Work, Boilers and Tanks (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 25 | Lead-Based Paint Coated Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 26 | Lead-Based Paint Coated Piping 4-1/2" to 10" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | ||
| 27 | Lead-Based Paint Interior/Exterior Surfaces (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 28 | Lead-Based Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 29 | Lead-Containing Paint Interior/Exterior Surfaces (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 30 | Lead-Containing Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 31 | Soil Contaminated with Lead (Per cubic ft) | x | 100 Cubic feet | = | $ - 0 | ||
| 32 | Exterior Surfaces (includes driveways, walkways, curbs) Contaminated with Lead (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 33 | Plywood/Drywall with Lead (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 34 | Plywood/Drywall with Mold (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 35 | Insulation with Mold (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 36 | Floor Covering (Carpet/Vinyl) with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 37 | Ceiling Tile with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 38 | Lumber with Mold (Per linear ft) | x | 300 Linear feet | = | $ - 0 | ||
| 39 | Plumbing Fixtures with Mold | x | 50 Each | = | $ - 0 | ||
| 40 | Plumbing Fixtures with Lead | x | 50 Each | = | $ - 0 | ||
| 41 | Underground Storage Tanks | ||||||
| (1,000 gallons or less) | x | 1 Each | = | $ - 0 | |||
| 42 | Underground Storage Tanks | ||||||
| (1,001 - 5,000 gallons) | x | 1 Each | = | $ - 0 | |||
| 43 | Cabinets (including tops) with Mold | ||||||
| (Per cubic ft) | x | 200 Cubic feet | = | $ - 0 | |||
| 44 | Lead-Containing Materials (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 45 | Lead-Containing Ceramic Tile (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| Subtotal of Section A | = | $ - 0 | |||||
| B. SUBMITTALS | |||||||
| Item | Cost Per Each | x | Estimated Number of Submittals | = | Total | ||
| Submittals | x | 1 Each | = | $ - 0 | |||
| C. EMERGENCY SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours | = | Total | ||
| Emergency Call Out Charge for Abatement Work* | x | 40 Hours | = | $ - 0 | |||
| *Emergency Call Out Charge includes costs for abatement and disposal as described in Scope of Work. | |||||||
| D. DECONTAMINATION / CONTAINMENT | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Decontamination* | x | 1 Each | = | $ - 0 | |||
| Containment* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section D | = | $ - 0 | |||||
| *Cost for Decontamination/Containment includes items described in Scope of Work. | |||||||
| E. MOBILIZATION / DEMOBILIZATION | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Mobilization* | x | 1 Each | = | $ - 0 | |||
| Demobilization* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section E | = | $ - 0 | |||||
| *Cost for Mobilization/Demobilization includes items described in Scope of Work. | |||||||
| F. NON-TYPICAL SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours Per Quoted Service per Agreement Term | = | Total | ||
| Non-Typical Quoted Services not identified as any items listed on the rate sheet | x | 40 Hours | = | $ - 0 |
| TOTAL BID AMOUNT GROUP 2 (SUM OF A, B, C, D, E & F) = | $ - 0 |
| BASIS FOR AWARD |
THE AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $250,000.00.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Percentage of work to be performed in relation to overall bid amount Kind of Work Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
Public Works Rate Sheet &12Bid Number C5613679-D
&12Page &P of &N
3 CCI
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| CALIFORNIA CORRECTIONAL INSTITUTION (CCI) |
| Group 3: CCI | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 19 | Aboveground Asbestos Piping 4-1/2" to 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 20 | Underground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 21 | Underground Asbestos Piping 4-1/2" - 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 22 | Asbestos Thermal System Insulation from Metal Piping 1/2" to 4-1/4" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 23 | Asbestos Thermal System Insulation from Metal Piping 4-1/2" to 10" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 24 | Asbestos Thermal System Insulation from Air Handler Units, Duct Work, Boilers and Tanks (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 25 | Lead-Based Paint Coated Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 26 | Lead-Based Paint Coated Piping 4-1/2" to 10" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | ||
| 27 | Lead-Based Paint Interior/Exterior Surfaces (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 28 | Lead-Based Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 29 | Lead-Containing Paint Interior/Exterior Surfaces (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 30 | Lead-Containing Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 31 | Soil Contaminated with Lead (Per cubic ft) | x | 100 Cubic feet | = | $ - 0 | ||
| 32 | Exterior Surfaces (includes driveways, walkways, curbs) Contaminated with Lead (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 33 | Plywood/Drywall with Lead (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 34 | Plywood/Drywall with Mold (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 35 | Insulation with Mold (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 36 | Floor Covering (Carpet/Vinyl) with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 37 | Ceiling Tile with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 38 | Lumber with Mold (Per linear ft) | x | 300 Linear feet | = | $ - 0 | ||
| 39 | Plumbing Fixtures with Mold | x | 50 Each | = | $ - 0 | ||
| 40 | Plumbing Fixtures with Lead | x | 50 Each | = | $ - 0 | ||
| 41 | Underground Storage Tanks | ||||||
| (1,000 gallons or less) | x | 1 Each | = | $ - 0 | |||
| 42 | Underground Storage Tanks | ||||||
| (1,001 - 5,000 gallons) | x | 1 Each | = | $ - 0 | |||
| 43 | Cabinets (including tops) with Mold | ||||||
| (Per cubic ft) | x | 200 Cubic feet | = | $ - 0 | |||
| 44 | Lead-Containing Materials (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 45 | Lead-Containing Ceramic Tile (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| Subtotal of Section A | = | $ - 0 | |||||
| B. SUBMITTALS | |||||||
| Item | Cost Per Each | x | Estimated Number of Submittals | = | Total | ||
| Submittals | x | 1 Each | = | $ - 0 | |||
| C. EMERGENCY SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours | = | Total | ||
| Emergency Call Out Charge for Abatement Work* | x | 40 Hours | = | $ - 0 | |||
| *Emergency Call Out Charge includes costs for abatement and disposal as described in Scope of Work. | |||||||
| D. DECONTAMINATION / CONTAINMENT | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Decontamination* | x | 1 Each | = | $ - 0 | |||
| Containment* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section D | = | $ - 0 | |||||
| *Cost for Decontamination/Containment includes items described in Scope of Work. | |||||||
| E. MOBILIZATION / DEMOBILIZATION | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Mobilization* | x | 1 Each | = | $ - 0 | |||
| Demobilization* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section E | = | $ - 0 | |||||
| *Cost for Mobilization/Demobilization includes items described in Scope of Work. | |||||||
| F. NON-TYPICAL SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours Per Quoted Service per Agreement Term | = | Total | ||
| Non-Typical Quoted Services not identified as any items listed on the rate sheet | x | 40 Hours | = | $ - 0 |
| TOTAL BID AMOUNT GROUP 3 (SUM OF A, B, C, D, E & F) = | $ - 0 |
| BASIS FOR AWARD |
THE AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $750,000.00.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Percentage of work to be performed in relation to overall bid amount Kind of Work Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
Public Works Rate Sheet &12Bid Number C5613679-D
&12Page &P of &N
4 CCWF-VSP
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF) |
| VALLEY STATE PRISON (VSP) |
| Group 4: CCWF, VSP | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 19 | Aboveground Asbestos Piping 4-1/2" to 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 20 | Underground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 21 | Underground Asbestos Piping 4-1/2" - 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 22 | Asbestos Thermal System Insulation from Metal Piping 1/2" to 4-1/4" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 23 | Asbestos Thermal System Insulation from Metal Piping 4-1/2" to 10" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 24 | Asbestos Thermal System Insulation from Air Handler Units, Duct Work, Boilers and Tanks (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 25 | Lead-Based Paint Coated Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 26 | Lead-Based Paint Coated Piping 4-1/2" to 10" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | ||
| 27 | Lead-Based Paint Interior/Exterior Surfaces (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 28 | Lead-Based Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 29 | Lead-Containing Paint Interior/Exterior Surfaces (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 30 | Lead-Containing Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 31 | Soil Contaminated with Lead (Per cubic ft) | x | 100 Cubic feet | = | $ - 0 | ||
| 32 | Exterior Surfaces (includes driveways, walkways, curbs) Contaminated with Lead (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 33 | Plywood/Drywall with Lead (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 34 | Plywood/Drywall with Mold (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 35 | Insulation with Mold (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 36 | Floor Covering (Carpet/Vinyl) with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 37 | Ceiling Tile with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 38 | Lumber with Mold (Per linear ft) | x | 300 Linear feet | = | $ - 0 | ||
| 39 | Plumbing Fixtures with Mold | x | 50 Each | = | $ - 0 | ||
| 40 | Plumbing Fixtures with Lead | x | 50 Each | = | $ - 0 | ||
| 41 | Underground Storage Tanks | ||||||
| (1,000 gallons or less) | x | 1 Each | = | $ - 0 | |||
| 42 | Underground Storage Tanks | ||||||
| (1,001 - 5,000 gallons) | x | 1 Each | = | $ - 0 | |||
| 43 | Cabinets (including tops) with Mold | ||||||
| (Per cubic ft) | x | 200 Cubic feet | = | $ - 0 | |||
| 44 | Lead-Containing Materials (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 45 | Lead-Containing Ceramic Tile (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| Subtotal of Section A | = | $ - 0 | |||||
| B. SUBMITTALS | |||||||
| Item | Cost Per Each | x | Estimated Number of Submittals | = | Total | ||
| Submittals | x | 1 Each | = | $ - 0 | |||
| C. EMERGENCY SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours | = | Total | ||
| Emergency Call Out Charge for Abatement Work* | x | 40 Hours | = | $ - 0 | |||
| *Emergency Call Out Charge includes costs for abatement and disposal as described in Scope of Work. | |||||||
| D. DECONTAMINATION / CONTAINMENT | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Decontamination* | x | 1 Each | = | $ - 0 | |||
| Containment* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section D | = | $ - 0 | |||||
| *Cost for Decontamination/Containment includes items described in Scope of Work. | |||||||
| E. MOBILIZATION / DEMOBILIZATION | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Mobilization* | x | 1 Each | = | $ - 0 | |||
| Demobilization* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section E | = | $ - 0 | |||||
| *Cost for Mobilization/Demobilization includes items described in Scope of Work. | |||||||
| F. NON-TYPICAL SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours Per Quoted Service per Agreement Term | = | Total | ||
| Non-Typical Quoted Services not identified as any items listed on the rate sheet | x | 40 Hours | = | $ - 0 |
| TOTAL BID AMOUNT GROUP 4 (SUM OF A, B, C, D, E & F) = | $ - 0 |
| BASIS FOR AWARD |
THE AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $750,000.00.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Percentage of work to be performed in relation to overall bid amount Kind of Work Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
Public Works Rate Sheet &12Bid Number C5613679-D
&12Page &P of &N
5 CHCF
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| CALIFORNIA HEALTH CARE FACILITY (CHCF) |
| Group 5: CHCF | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 19 | Aboveground Asbestos Piping 4-1/2" to 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 20 | Underground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 21 | Underground Asbestos Piping 4-1/2" - 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 22 | Asbestos Thermal System Insulation from Metal Piping 1/2" to 4-1/4" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 23 | Asbestos Thermal System Insulation from Metal Piping 4-1/2" to 10" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 24 | Asbestos Thermal System Insulation from Air Handler Units, Duct Work, Boilers and Tanks (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 25 | Lead-Based Paint Coated Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 26 | Lead-Based Paint Coated Piping 4-1/2" to 10" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | ||
| 27 | Lead-Based Paint Interior/Exterior Surfaces (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 28 | Lead-Based Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 29 | Lead-Containing Paint Interior/Exterior Surfaces (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 30 | Lead-Containing Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 31 | Soil Contaminated with Lead (Per cubic ft) | x | 100 Cubic feet | = | $ - 0 | ||
| 32 | Exterior Surfaces (includes driveways, walkways, curbs) Contaminated with Lead (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 33 | Plywood/Drywall with Lead (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 34 | Plywood/Drywall with Mold (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 35 | Insulation with Mold (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 36 | Floor Covering (Carpet/Vinyl) with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 37 | Ceiling Tile with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 38 | Lumber with Mold (Per linear ft) | x | 300 Linear feet | = | $ - 0 | ||
| 39 | Plumbing Fixtures with Mold | x | 50 Each | = | $ - 0 | ||
| 40 | Plumbing Fixtures with Lead | x | 50 Each | = | $ - 0 | ||
| 41 | Underground Storage Tanks | ||||||
| (1,000 gallons or less) | x | 1 Each | = | $ - 0 | |||
| 42 | Underground Storage Tanks | ||||||
| (1,001 - 5,000 gallons) | x | 1 Each | = | $ - 0 | |||
| 43 | Cabinets (including tops) with Mold | ||||||
| (Per cubic ft) | x | 200 Cubic feet | = | $ - 0 | |||
| 44 | Lead-Containing Materials (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 45 | Lead-Containing Ceramic Tile (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| Subtotal of Section A | = | $ - 0 | |||||
| B. SUBMITTALS | |||||||
| Item | Cost Per Each | x | Estimated Number of Submittals | = | Total | ||
| Submittals | x | 1 Each | = | $ - 0 | |||
| C. EMERGENCY SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours | = | Total | ||
| Emergency Call Out Charge for Abatement Work* | x | 40 Hours | = | $ - 0 | |||
| *Emergency Call Out Charge includes costs for abatement and disposal as described in Scope of Work. | |||||||
| D. DECONTAMINATION / CONTAINMENT | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Decontamination* | x | 1 Each | = | $ - 0 | |||
| Containment* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section D | = | $ - 0 | |||||
| *Cost for Decontamination/Containment includes items described in Scope of Work. | |||||||
| E. MOBILIZATION / DEMOBILIZATION | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Mobilization* | x | 1 Each | = | $ - 0 | |||
| Demobilization* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section E | = | $ - 0 | |||||
| *Cost for Mobilization/Demobilization includes items described in Scope of Work. | |||||||
| F. NON-TYPICAL SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours Per Quoted Service per Agreement Term | = | Total | ||
| Non-Typical Quoted Services not identified as any items listed on the rate sheet | x | 40 Hours | = | $ - 0 |
| TOTAL BID AMOUNT GROUP 5 (SUM OF A, B, C, D, E & F) = | $ - 0 |
| BASIS FOR AWARD |
THE AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $2,000,000.00.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Percentage of work to be performed in relation to overall bid amount Kind of Work Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
Public Works Rate Sheet &12Bid Number C5613679-D
&12Page &P of &N
6 CIM-CIW
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| CALIFORNIA INSTITUTION FOR MEN (CIM) |
| CALIFORNIA INSTITUTION FOR WOMEN (CIW) |
| Group 6: CIM, CIW | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 19 | Aboveground Asbestos Piping 4-1/2" to 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 20 | Underground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 21 | Underground Asbestos Piping 4-1/2" - 10" diameter (Per linear ft) | x | 50 Linear feet | = | $ - 0 | ||
| 22 | Asbestos Thermal System Insulation from Metal Piping 1/2" to 4-1/4" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 23 | Asbestos Thermal System Insulation from Metal Piping 4-1/2" to 10" diameter | ||||||
| (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 24 | Asbestos Thermal System Insulation from Air Handler Units, Duct Work, Boilers and Tanks (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 25 | Lead-Based Paint Coated Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | |||
| 26 | Lead-Based Paint Coated Piping 4-1/2" to 10" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 | ||
| 27 | Lead-Based Paint Interior/Exterior Surfaces (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 28 | Lead-Based Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 29 | Lead-Containing Paint Interior/Exterior Surfaces (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 30 | Lead-Containing Paint Windowsills/frames and Doors/frames (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 31 | Soil Contaminated with Lead (Per cubic ft) | x | 100 Cubic feet | = | $ - 0 | ||
| 32 | Exterior Surfaces (includes driveways, walkways, curbs) Contaminated with Lead (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 33 | Plywood/Drywall with Lead (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 34 | Plywood/Drywall with Mold (Per sq ft) | x | 300 Square feet | = | $ - 0 | ||
| 35 | Insulation with Mold (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 36 | Floor Covering (Carpet/Vinyl) with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 37 | Ceiling Tile with Mold (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 38 | Lumber with Mold (Per linear ft) | x | 300 Linear feet | = | $ - 0 | ||
| 39 | Plumbing Fixtures with Mold | x | 50 Each | = | $ - 0 | ||
| 40 | Plumbing Fixtures with Lead | x | 50 Each | = | $ - 0 | ||
| 41 | Underground Storage Tanks | ||||||
| (1,000 gallons or less) | x | 1 Each | = | $ - 0 | |||
| 42 | Underground Storage Tanks | ||||||
| (1,001 - 5,000 gallons) | x | 1 Each | = | $ - 0 | |||
| 43 | Cabinets (including tops) with Mold | ||||||
| (Per cubic ft) | x | 200 Cubic feet | = | $ - 0 | |||
| 44 | Lead-Containing Materials (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 45 | Lead-Containing Ceramic Tile (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| Subtotal of Section A | = | $ - 0 | |||||
| B. SUBMITTALS | |||||||
| Item | Cost Per Each | x | Estimated Number of Submittals | = | Total | ||
| Submittals | x | 1 Each | = | $ - 0 | |||
| C. EMERGENCY SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours | = | Total | ||
| Emergency Call Out Charge for Abatement Work* | x | 40 Hours | = | $ - 0 | |||
| *Emergency Call Out Charge includes costs for abatement and disposal as described in Scope of Work. | |||||||
| D. DECONTAMINATION / CONTAINMENT | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Decontamination* | x | 1 Each | = | $ - 0 | |||
| Containment* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section D | = | $ - 0 | |||||
| *Cost for Decontamination/Containment includes items described in Scope of Work. | |||||||
| E. MOBILIZATION / DEMOBILIZATION | |||||||
| Item | Cost Per Each | x | Estimated Number of Services | = | Total | ||
| Mobilization* | x | 1 Each | = | $ - 0 | |||
| Demobilization* | x | 1 Each | = | $ - 0 | |||
| Subtotal of Section E | = | $ - 0 | |||||
| *Cost for Mobilization/Demobilization includes items described in Scope of Work. | |||||||
| F. NON-TYPICAL SERVICES | |||||||
| Item | Cost Per Hour | x | Estimated Number of Hours Per Quoted Service per Agreement Term | = | Total | ||
| Non-Typical Quoted Services not identified as any items listed on the rate sheet | x | 40 Hours | = | $ - 0 |
| TOTAL BID AMOUNT GROUP 6 (SUM OF A, B, C, D, E & F) = | $ - 0 |
| BASIS FOR AWARD |
THE AGREEMENT SHALL BE WRITTEN FOR THE STATE'S ESTIMATE OF $2,000,000.00.
LIST OF PROPOSED SUBCONTRACTORS
Listed hereinafter is the name and address of each subcontractor who will be employed and the kind of work which each will perform in carrying out the aforementioned project. I understand that under California Public Contract Code Sections 4100 through 4108, and section 1725.5 of the Labor Code, the Prime Contractor MUST clearly set forth the name, address, California Contractors State License Board (CSLB) license number, and Public Works Contractor Registration Number of each subcontractor who will perform work or labor or render service to me in or about the site of the work and that as to any work in which I fail to do, I agree to perform that portion myself or be subjected to penalty under the Subletting and Subcontracting Fair Practices Act.
If further space is required for the list of proposed subcontractors, additional sheets showing the required information, in the format outlined below, shall be attached hereto and made a part of the Bid Proposal.
NOTE: Percentage of work to be performed refers to the percentage of the overall Scope of Work that the subcontractor will be performing. Total should not exceed 100%.
Percentage of work to be performed in relation to overall bid amount Kind of Work Type of License and No Public Works Contractor Registration Number Subcontractor Name and Address
Subcontractor Name Subcontractor Dollar Amount Total Bid Amount Percentage Subcontractor Usage
Public Works Rate Sheet &12Bid Number C5613679-D
&12Page &P of &N
7 CMC
| ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, |
| LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES |
| CALIFORNIA MEN'S COLONY (CMC) |
| Group 7: CMC | |||||||
| A. NON-EMERGENCY SERVICES | |||||||
| Item | Cost Per Square, Square Foot (sq ft), Linear Foot (linear ft), Cubic Foot (cubic ft), or Each | x | Estimated Area to be Abated | = | Total | ||
| 1 | Asbestos Floor Tiles and Mastic, 1 - 100 Sq Ft (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 2 | Asbestos Floor Tiles and Mastic, 101 - 2,000 Sq Ft (Per sq ft) | x | 3,000 Square feet | = | $ - 0 | ||
| 3 | Asbestos Floor Tiles and Mastic, 2,001 Sq Ft or more (Per sq ft) | x | 6,000 Square feet | = | $ - 0 | ||
| 4 | Asbestos Roofing and Mastic, less than 10 Square (Per square) | x | 25 Square | = | $ - 0 | ||
| 5 | Asbestos Roofing and Mastic, 10 to 25 Square (Per square) | x | 100 Square | = | $ - 0 | ||
| 6 | Asbestos Roofing and Mastic, more than 25 Square (Per square) | x | 500 Square | = | $ - 0 | ||
| 7 | Asbestos Ceiling (Per sq ft) | x | 2,500 Square feet | = | $ - 0 | ||
| 8 | Asbestos Walls (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 9 | Asbestos Flooring (Per sq ft) | x | 5,000 Square feet | = | $ - 0 | ||
| 10 | Asbestos Fire Brick Inside and Outside of Boilers up to 4" Thick (Per sq ft) | x | 500 Square feet | = | $ - 0 | ||
| 11 | Asbestos or Contaminated Loose Fill Insulation up to 6" Thick (Per sq ft) | x | 200 Square feet | = | $ - 0 | ||
| 12 | Asbestos Felt/Underlayment (Per sq ft) | x | 1,000 Square feet | = | $ - 0 | ||
| 13 | Asbestos Siding Material (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 14 | Asbestos Spray-On Surfacing Material | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 15 | Asbestos Adhesives/Mastics on all Surfaces (Per sq ft) | x | 250 Square feet | = | $ - 0 | ||
| 16 | Asbestos Window Glazing (Per sq ft) | x | 100 Square feet | = | $ - 0 | ||
| 17 | Asbestos Contamination Cleanup | ||||||
| (Per sq ft) | x | 100 Square feet | = | $ - 0 | |||
| 18 | Aboveground Asbestos Piping 1/2" to | ||||||
| 4-1/4" diameter (Per linear ft) | x | 100 Linear feet | = | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.