Exhibit A (To be completed by Contractor).xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Grounds Maintenance Services for Rock Island Arsenal
Solicitation number
W912EK25R0013
Issued by

About this file

This is an Excel spreadsheet template titled "Exhibit A" that contractors must complete to demonstrate their qualifications for the Clock Tower Complex grounds maintenance project at Rock Island Arsenal. The form requires contractors to submit evidence for three key factors: Factor 1A requires documentation of two commercial contracts showing 10 years of experience in similar grounds maintenance projects with current references; Factor 1B requires a personnel list proving the contractor's ability to self-perform at least 85% of on-site work through their own staffing and equipment; and Factor 1C requires proof that the contractor has a facility within 60 miles of the project location.

The document is part of solicitation W912EK25R0013 issued by the Department of the Army Corps of Engineers Engineering District Rock Island for grounds maintenance services at the Rock Island Arsenal Clock Tower Complex. The template contains highlighted fields where contractors must input their company information, including name, address, CAGE code, SAM Unique Entity ID, and specific evidence for each qualification factor.

View the file

Other files

File Type Posted
Appendix C.pdf PDF
Appendix A.PDF PDF
Appendix B.PDF PDF
W912EK25R0013 ROCK ISLAND GROUNDS MAINTENANCE SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A Cover Sheet

Contractor Name and Address
CAGE Code
SAM Unique Entity ID
**Note to contractors**Contractors must complete all yellow highlighted areas for factors 1A, 1B and 1C

Factor 1A

Factor 1a --The Prime Contractor is required to submit TWO commercial contracts demonstrating 10 years’ experience completing grounds maintenance on projects of a similar size and scope to the Clock Tower Complex grounds maintenance project. Current references for these contracts, must be included with the two contracts submitted.
Project 1--
Project 1 References --
Project 2 --
Project 2 References --

Factor 1B

Factor 1b -- The Prime Contractor is required to submit a list of the prime contractor's personnel, who will be working on this potential contract, as proof of the companies’ ability to self-perform at least 85% of the on-site work thru their own staffing and equipment.
Please include list of personel here --

Factor 1C

Factor 1c -- The Prime Contractor is required to have a facility to be located within 60 miles of the project location.
Please include location of prime contractor here --