The document is a Statement of Work (SOW) for a weather station electrical infrastructure installation project at Fermilab, located near "C" Road West and Wilson St. The scope of work includes multiple electrical tasks such as de-energizing and re-energizing 12kv overhead conductors, installing a 25kva single phase pole-mounted transformer, connecting lightning arrestors, installing wildlife guards, extending underground conduit, and setting up a new 100amp 120/240vac electrical panel. Specific technical requirements include installing ground rods, copper conductors, a concrete pad, Unistrut rack, a fused disconnect, and a Square D QOB NEMA 3R panel with breakers. The project also involves pot-holing utility crossings, using directional boring or backhoe for conduit installation, grading the site, and terminating and labeling all circuits. Wildlife guards are listed as government-furnished property.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work- Weather Station

INTRODUCTION

Provide labor and material for installation of QTY-1) 100amp 120/240 Panel to power existing weather station located near “C” Road West and Wilson St.

SCOPE OF WORK

The Subcontractor shall provide the following.

• Fermilab to de-energize 12kv overhead conductors. HVE to verify lines are de-energized and install grounds at pole location

• Provided and install reconditioned 25kva single phase 13.800/8000 - 240/120-volt pole mounted transformer

• Provide and install 5/8”x8’ ground rod and #4-sol ground wire to arrestor.

• Connect polymer lightning arrestor 12KV on “A” phase conductor.

• Provide and install S&C XS Fuse Cutout style primary power fuses (14.4 KV) w/ proper size fuses.

• Install wildlife guards on all primary connections from overhead cable thru primary fuse all the way into the transformer.

• Extend secondary conductors up pole with 2” PVC and steel u-guard and connect to transformer secondary bushings. Remove overhead grounds

• Fermilab to energize overhead conductors

• Provide and install 275’ of 2” PVC underground to existing weather station site

• Pot hole QTY-2) Utility crossings as per site map for new conduit installation

• Utilize directional boring and or backhoe for new conduit installation

• Provide and install QTY-3) #1 and QTY-1) #4 copper conductors for new 100amp

120/240vac panel

• Provide and install new concrete pad with stone subgrade for panel mounting

• Provide and install Unistrut rack for panel mounting

• Provide and install QTY-1) 100amp 250vac fused disconnect prior to panel service connection

• Provide and install QTY-1) 100amp 120/240vac Square D QOB NEMA 3R panel with the following 1-0kaic breakers: QTY-1) 100amp main, QTY-6) 20amp 1 pole with LOTO hasps

• Provide and install ¾” GRC conduit and wire for weather station feed

• Provide and install QTY-1) 20amp 120vac receptacle with in-use cover near panel

• Grade site when complete

• LOTO as required

• Terminate and label all circuits

GOVERNMENT FURNISHED PROPERTY

Wildlife guards

PLACE OF PERFORMANCE

Existing weather station located near “C” Road West and Wilson St.