Exhibit A_Statement of Work Weather Station.pdf
PDF 89 KB Posted
- Attached to
- Fermilab-Weather Station-369951
- Solicitation number
- ISD-369951-DG
About this file
The document is a Statement of Work (SOW) for a weather station electrical infrastructure installation project at Fermilab, located near "C" Road West and Wilson St. The scope of work includes multiple electrical tasks such as de-energizing and re-energizing 12kv overhead conductors, installing a 25kva single phase pole-mounted transformer, connecting lightning arrestors, installing wildlife guards, extending underground conduit, and setting up a new 100amp 120/240vac electrical panel. Specific technical requirements include installing ground rods, copper conductors, a concrete pad, Unistrut rack, a fused disconnect, and a Square D QOB NEMA 3R panel with breakers. The project also involves pot-holing utility crossings, using directional boring or backhoe for conduit installation, grading the site, and terminating and labeling all circuits. Wildlife guards are listed as government-furnished property.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work- Weather Station
INTRODUCTION
Provide labor and material for installation of QTY-1) 100amp 120/240 Panel to power existing weather station located near “C” Road West and Wilson St.
SCOPE OF WORK
The Subcontractor shall provide the following.
• Fermilab to de-energize 12kv overhead conductors. HVE to verify lines are de-energized and install grounds at pole location
• Provided and install reconditioned 25kva single phase 13.800/8000 - 240/120-volt pole mounted transformer
• Provide and install 5/8”x8’ ground rod and #4-sol ground wire to arrestor.
• Connect polymer lightning arrestor 12KV on “A” phase conductor.
• Provide and install S&C XS Fuse Cutout style primary power fuses (14.4 KV) w/ proper size fuses.
• Install wildlife guards on all primary connections from overhead cable thru primary fuse all the way into the transformer.
• Extend secondary conductors up pole with 2” PVC and steel u-guard and connect to transformer secondary bushings. Remove overhead grounds
• Fermilab to energize overhead conductors
• Provide and install 275’ of 2” PVC underground to existing weather station site
• Pot hole QTY-2) Utility crossings as per site map for new conduit installation
• Utilize directional boring and or backhoe for new conduit installation
• Provide and install QTY-3) #1 and QTY-1) #4 copper conductors for new 100amp
120/240vac panel
• Provide and install new concrete pad with stone subgrade for panel mounting
• Provide and install Unistrut rack for panel mounting
• Provide and install QTY-1) 100amp 250vac fused disconnect prior to panel service connection
• Provide and install QTY-1) 100amp 120/240vac Square D QOB NEMA 3R panel with the following 1-0kaic breakers: QTY-1) 100amp main, QTY-6) 20amp 1 pole with LOTO hasps
• Provide and install ¾” GRC conduit and wire for weather station feed
• Provide and install QTY-1) 20amp 120vac receptacle with in-use cover near panel
• Grade site when complete
• LOTO as required
• Terminate and label all circuits
GOVERNMENT FURNISHED PROPERTY
Wildlife guards
PLACE OF PERFORMANCE
Existing weather station located near “C” Road West and Wilson St.
File details come from the government source that posted it. Updated .