Exhibit_A_-_SOW.pdf
PDF 186 KB Posted
- Attached to
- RFP HEERC Duct Replacement for DHU
- Solicitation number
- ISD-380609-RO
- Issued by
- Kane County, Bartelso Village, Illinois
About this file
This is a Statement of Work (SOW) issued by Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois, operated by the Fermi Forward Discover Group, for the replacement of exhaust ductwork for a Desiccant Dehumidifier (DHU) unit located at the Helen Edwards Engineering Research Center (HEERC), FIMS#004 in DuPage County. The project encompasses the complete removal of existing 2-inch duct insulation and designated ductwork sections, fabrication and installation of new square sheet metal ductwork with an inline trap configuration, installation of a condensate pan with internal duct, supply and installation of hangers and supports per SMACNA standards, sealing and re-insulation of all ductwork joints, installation of 3/4" PVC piping with a deep seal trap and condensate neutralizer connected to the facility floor drain, and third-party commissioning by Dry Solutions. The estimated project start date is April 9, 2026, with a hard stop completion date of December 31, 2026. The contractor must submit field measurements and design shop drawings for approval prior to fabrication and submit a written hazard analysis for insulation removal and disposal.
This contract is designated as a Total Small Business Set-Aside under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors. The subcontractor bears full responsibility for all aspects of project execution, including labor, supervision, equipment, measurements, programming, installation, and testing. Government-furnished property includes a metal dumpster for debris disposal. The contractor is responsible for daily site cleanup and must ensure compliance with OSHA 29 CFR 1910.147 Lock-Out Tag-Out procedures prior to work commencement. Upon completion, all operations and maintenance manuals, warranties, and commissioning reports must be submitted to the Task Manager/Construction Coordinator for project closeout.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW TEMPLATE 04.24.2023
SOW DATE: 2/3/2026
PROJECT TITLE: ID#296505, HEERC,004, The replacement of the existing exhaust ductwork for the Desiccant Dehumidifier (DHU).
PROJECT: 60 TASK#: 60.03.14.03.02
Fermi Forward POINT OF CONTACT: Joseph M. Perona x4772 41904N COUNTY THAT WILL BE COMPLETED IN: DuPage.
INTRODUCTION
This Statement of Work (SOW) outlines the provisions of supervision, expertise, labor, materials, and equipment necessary to complete the project.
The work will be performed at the Helen Edwards Engineering Research Center (HEERC), FIMS#004, located within the Fermilab facility located in Batavia, Illinois. Fermilab is operated by the Fermi Forward Discover Group (FFDG), which will assign a Task Manager/Construction Coordinator (TM/CC) to oversee this project.
The subcontractor shall replace the existing exhaust ductwork for the Desiccant Dehumidifier (DHU). The subcontractor is responsible for all aspects of the project's execution, including labor, supervision, equipment, measurements, programming, installation, and testing to ensure the work is completed in accordance with the project specifications. Upon completion, the subcontractor shall turn over the completed work to the FFDG TM/CC.
SCOPE OF WORK
1. Project Preparation & Mobilization
• Mobilization: Contractor shall mobilize all necessary labor, equipment, and materials to HEERC Fims#
004. (Equipment #M004AHU01).
• Safety & Energy Control: Prior to commencement, the TM/CC (Technical Manager/Construction Coordinator) and Contractor must verify that the RTU is shut off and secured in a Lock-Out Tag-Out (LOTO) configuration per OSHA 29 CFR 1910.147.
2. Mobilization & Hazard Management
• Insulation Removal: Remove existing 2-inch duct insulation from the RTU unit to the mechanical room wall.
• Hazard Analysis: Contractor must submit a written hazard analysis for the removal and disposal of non-asbestos insulation for approval.
• Ductwork Removal: Remove and dispose of designated ductwork sections as identified in the project drawings.
• Waste Management: The TM/CC will provide a metal dumpster. The contractor is responsible for daily site cleanup and for properly disposing of debris into the provided container.
3. Ductwork Fabrication & Installation
• Inline Trap Creation: Install a square sheet metal 90° and ducting to form an inline trap using four 90° elbows.
• Design Approval: Contractor must submit field measurements and design shop drawings for approval before fabrication.
• Condensate Management:
o Supply and install a condensate pan and a manufactured internal duct.
o Ensure exhaust ducting is pitched towards the new trap and away from the Dehumidification
Air Handling Unit (DHU) to prevent water re-entry.
Statement of Work 01.06.2025 Infrastructure Services Division
SOW TEMPLATE 04.24.2023
• Supports: Supply and install all necessary hangers and supports for new ductwork in accordance with SMACNA standards.
4. Sealing & Re-Insulation
• Water-Tight Sealing: Seal all existing and new ductwork joints using approved materials (e.g., mastic or foil tape) to ensure a 100% water-tight finish.
• New Insulation: Install new duct insulation (matching existing 2-inch thickness) following approval of a second installation hazard analysis.
5. Drainage & Plumbing
• PVC Installation: Install 3/4" PVC piping with a deep seal trap from the new pan to the facility floor drain.
• Condensate Neutralization: Install a 3/4" condensate neutralizer and provide all required piping supports.
6. Commissioning
• Third-Party Agent: The Contractor will hire and schedule Dry Solutions (Howell, MI) as the Commissioning Agent.
• Operational Verification: Dry Solutions shall:
o Ensure the unit is running properly and verify the exhaust fan settings for the new duct design.
o Perform a final operational inspection of the DHU and provide a commissioning report.
7. Demobilization
• Final Inspection: Complete a final walkthrough with the TM/CC to ensure all acceptance criteria are met.
• Closeout Documentation: Contractor shall submit all O&M manuals, warranties, and commissioning findings to the TM/CC.
GOVERNMENT FURNISHED PROPERTY
N/A
PLACE OF PERFORMANCE
Fermi National Accelerator Laboratory (Fermilab) HEERC, FIMS 004, Batavia, IL 60510.
ESTIMATED SCHEDULE/PERIOD OF PERFORMANCE
EST START DATE: 4/9/2026 EST END DATE: 12/31/2026
Additional justification for hard stop/start dates N/A
File details come from the government source that posted it. Updated .