This document is a Section 01010 Summary of Work for the Lockwood Blvd Force Main and RCW Design project in Seminole County. The project involves improving the reclaimed water main distribution and sanitary sewer transmission system, which includes the provision and installation of 10-inch and 12-inch PVC and HDPE force mains and reclaimed water mains using Horizontal Directional Drill (HDD) and open-cut methods. The scope of work encompasses installing associated valves and fittings, performing pressure testing and flushing, making connections to existing infrastructure, implementing temporary traffic control, designing and installing sheeting and shoring systems, and completing temporary and permanent site restoration including roadway, driveway, sidewalk, and curb reconstruction.
The document does not provide specific details about pricing, funding sources, contract term, or budget allocations. The Summary of Work section focuses exclusively on describing the technical scope of the infrastructure improvement project, outlining the specific construction and installation requirements without delving into financial or contractual specifics beyond the work description.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCKWOOD BLVD FORCE MAIN AND RCW DESIGN
SEMINOLE COUNTY
01010 - 1
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. The completed Work will provide the Owner with an improved reclaimed water main distribution, and sanitary sewer transmission system within the project area.
B. The Work shall include but is not limited to the provision and installation of the following:
1. Provision and installation of 10-inch PVC C900 and 10-inch DR-11 HDPE
Force Main via pipe Horizontal Directional Drill (HDD) and open-cut.
2. Provision and installation of 12-inch PVC C900 and 12-inch DR-11 HDPE
Reclaimed Water Main via pipe Horizontal Directional Drill (HDD) and open-cut.
3. Provision and installation of all associated valves and fittings for the force main and reclaimed water main.
4. Performing all flushing/pigging, pressure testing, and all required testing as specified.
5. Connections to existing force main and core drill existing wet well as required.
6. Connections to existing reclaimed water main.
7. Performance of all with associated temporary traffic control requirements for work within the road right of way.
8. The design, provision, and installation of all sheeting and shoring systems necessary to perform the work.
9. Temporary/interim and permanent restoration of site and other affected facilities.
10. Temporary/interim roadway and sidewalk facilities as necessary to facilitate uninterrupted service during the course of work.
11. Restoration including but not limited to backfilling, complete roadway restoration (including subbase, base, binder, asphalt/surface, etc.), driveway, sidewalk, curb reconstruction and more.
LOCKWOOD BLVD FORCE MAIN AND RCW DESIGN
SEMINOLE COUNTY
01010 - 2
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)