Exhibit A - SAMPLE SCHEDULE B FILLABLE.pdf

PDF 190 KB Posted

Attached to
USDA Forest Service - Arkansas OZARK NORTH Road Construction MATOC
Solicitation number
12445123R0005
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RD 1 OF 1

District

DISTRICT

County

COUNTY

Pay Item Number Description

Method Measure.

Units of Measure. Quantity Unit Price Cost

15101 Mobilization LSQ L.S. 1 $ $

20104 Clearing and grubbing, disposal of tops and limbs (F) , logs( F ), stumps (F)

CQ Acre 5

20301 Removal of culverts CQ Each 10 $ $

20401 Roadway excavation, compaction placement method 3

CQ C.Y. 25

20407 Select borrow, compaction placement method 2

CQ C.Y. 25

25101-1 Placed riprap, class 1 CQ C.Y. 50

25116 Geotextile, type IV-D CQ S.Y. 50 $ $

55201 Structural concrete class A(AE) CQ C.Y. 20 $ $

55401 Reinforcing steel CQ LBS 1000 $ $

30113 Aggregate surface course, Type AR-class 4, compaction method A

CQ C.Y. 500

30122 Pit run maximum size 3", compaction method ( A )

CQ C.Y. 500

30311 Road reconditioning, surfacing, Compaction Placement Method 3

CQ STA 50

60211-18 18 Inch aluminized, type 2, CSP 0.064 Inch Thickness

AQ LF 100

60211-24 24 Inch aluminized, type 2, CSP 0.064 Inch Thickness

AQ LF 100

60211-48 48 Inch aluminized, type 2, CSP 0.079 Inch Thickness

AQ LF 100

60211-72 72 Inch aluminized, type 2, CSP 0.079 Inch Thickness

AQ LF 100

62527 Seeding, Fertilizing, and Mulching, hydraulic or dry Method

CQ Acre 5

63501 Temporary traffic control LSQ L.S. 1 $ $

65001 Furnish and install road closure device, type metal gate, size 16'

CQ Each 1

Road 1 Total

ROAD CONSTRUCTION MATOC CONSTRUCTION

(1) Road 1 CONTRACTOR:

Length (miles) 0.00 SAM Unique ID #

SAMPLE SCHEDULE B

Solicitation:

Forest/State

INSTRUCTION: This is a list of common required items. Price these items for the location identified in Forest/State. THIS IS FOR EVALUATION PURPOSES ONLY!

CONSTRUCTION:
SAM Unique ID:
Cost:
fill_17:
fill_18:
fill_23:
fill_24:
fill_28:
fill_29:
fill_33:
fill_34:
fill_39:
fill_40:
fill_45:
fill_46:
fill_50:
fill_51:
fill_56:
fill_57:
fill_61:
fill_62:
fill_66:
fill_67:
fill_71:
fill_72:
fill_76:
fill_77:
fill_81:
fill_82:
fill_86:
fill_87:
fill_91:
fill_92:
fill_96:
fill_97:
fill_103:
fill_104:
fill_108:
fill_109:
Unit Price:
Text1:
Text2:

File details come from the government source that posted it. Updated .