12445123R0005 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309-2449
STE 876S
1720 PEACHTREE ST NW
USDA-FS CSA EAST 11
03/08/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/08/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of Amendment 0001 is to correct and clarify questions asked. See Page 2 of 2
(attached)
Period of Performance: 05/01/2023 to 03/31/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STEVEN J. ALVES
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X 1
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
BUY AMERICAN ACT- CONSTRUCTION MATERIALS
It is understood and agreed that the materials and components listed in Subparts 25.1 and 25.2 of the FAR are a part of this contract and are deemed to be Domestic Construction Material for the purposes of this contract.
NOTE TO CONTRACTOR:
The following information and any applicable supporting data is required for evaluation of requests under FAR Clause 52.225-9 Paragraph (c) & (d) and FAR Provision 52.225-10 Paragraph (b).
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
Material and/or Component
Construction Material Description Unit of Measure Quantity *Cost Delivered to Job Site
Foreign Construction Material
Comparable Domestic Material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]
Company Name:
Unique Identification:
Solicitation Number:
Signature:
Hazardous Material Identification Number
USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS
Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and
Recovery Act (RCRA) of 1976, as amended (42 U.S.C. 6901 et seq.), requires Federal, State, and local procuring agencies using appropriated Federal funds to purchase items composed of the highest percentage of recovered materials practical. Use of recovered materials is strongly encouraged. Highway construction items covered by the Environmental Protection Agency’s
Comprehensive Guidelines for Procurement of Products Containing Recovered Materials include fly ash, ground granulated blast furnace slag, traffic barricades, traffic cones, hydraulic mulch and compost for mulch.
Use of fly ash and ground granulated blast furnace slag and construction materials containing fly ash and ground granulated blast furnace slag on highway projects:
It is the policy of the United States Government that fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag shall have maximum practicable opportunity for incorporation into its construction projects.
The Contractor agrees to investigate the use of fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag to the fullest extent consistent with the efficient performance of this contract. Both the contractor and the subcontractors are urged to seek out suppliers of fly ash and ground granulated blast furnace slag, cement and concrete containing fly ash and ground granulated blast furnace slag and to solicit bids for these materials.
Names of firms that supply fly ash and ground granulated blast furnace slag and materials containing fly ash and ground granulated blast furnace slag are available from the American Coal Ash Association and the National Slag Association.
HAZARDOUS MATERIALS
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data - Alternate I, the apparent low bidder must submit prior to award a Material Safety Data Sheet (MSDS) for all hazardous materials that the bidder identifies in paragraph (b) of the FAR clause and defined under the latest version of Federal Standard No. 313.
Company Name:
Unique Identification:
Solicitation Number:
Signature:
| Text1: 12445123R0005 00001 |
| Text2: |
| Text3: The purpose of Amendment 0001 is to correct and clarify questions asked. Changes/Clarifications are as follows: |
Question #14: See new Exhibit E for completion.
Question #15: Page Limitation Clarification <change> Technical (15 Page total) -1.0 Technical 8 Single Sided -1.1 Mgt Approach 3 Single Sided
- 1.2 Key Personnel 1 Single Sided
- 1.3 Experience 3 Single Sided x 3 Min Projects (Exhibit c-Relevance Worksheet)
<change> Past Performance
- 2.0 3 Double Sided but the Exhibit D is 6 pages long!
*Change to read 3ea Exhibit D Submittal Min (18 Pages) - Five ea Maximum (30 pages)/last five years for recency.
- -Does not include CPAR submittals
Question #17: engineering professionals (design firms) / design-build. Delete all reference to "design firms/ design-build". This is no longer a requirement due to the different selection methodology required for design-build.
Question #18: Any intended survey firm must be licensed in the state in which the survey/work is to occur. You are not committed to only one firm, but the licensing requirement is not waiverable.
Question #22: Pricing. - Contractor shall utilize the "Exhibit A and the Sample Project" and will price them for either the zip code in the document watermark or the address specified in the sample.
| Text4: 1 |
| Unit of MeasureForeign Construction Material: |
| QuantityForeign Construction Material: |
| Cost Delivered to Job SiteForeign Construction Material: |
| Foreign Construction MaterialRow1: |
| Unit of MeasureRow2: |
| QuantityRow2: |
| Cost Delivered to Job SiteRow2: |
| Unit of MeasureComparable Domestic Material: |
| QuantityComparable Domestic Material: |
| Cost Delivered to Job SiteComparable Domestic Material: |
| Comparable Domestic MaterialRow1: |
| Unit of MeasureRow4: |
| QuantityRow4: |
| Cost Delivered to Job SiteRow4: |
| Unit of MeasureForeign Construction Material_2: |
| QuantityForeign Construction Material_2: |
| Cost Delivered to Job SiteForeign Construction Material_2: |
| Foreign Construction MaterialRow1_2: |
| Unit of MeasureRow2_2: |
| QuantityRow2_2: |
| Cost Delivered to Job SiteRow2_2: |
| Unit of MeasureComparable Domestic Material_2: |
| QuantityComparable Domestic Material_2: |
| Cost Delivered to Job SiteComparable Domestic Material_2: |
| Comparable Domestic MaterialRow1_2: |
| Unit of MeasureRow4_2: |
| QuantityRow4_2: |
| Cost Delivered to Job SiteRow4_2: |
| Hazardous MaterialRow1: |
| Identification NumberRow1: |
| Hazardous MaterialRow2: |
| Identification NumberRow2: |
| Hazardous MaterialRow3: |
| Identification NumberRow3: |
| Hazardous MaterialRow4: |
| Identification NumberRow4: |
| Text5: |
| Text6: |
| Text7: |
File details come from the government source that posted it. Updated .