Exhibit_A_RFP_252614_Elevated__Storage_Tank_Maint__Asset_Mng_SOV.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- RFP 25/26-14
- Issued by
- Florida
About this file
This is an Exhibit A Schedule of Value for the City of Sanford, Florida's RFP 25/26-14 for Elevated & Ground Storage Tank Maintenance & Asset Management, due July 2, 2026 at 2:00 PM local time. The City of Sanford seeks a qualified contractor to provide full-service maintenance and asset management services for nine (9) elevated and ground water storage tanks located throughout the city. Services include engineering, professional management, GASB 34 compliance as an alternate asset management method, inspection, rehabilitation, repair, washouts, visual inspections, and repainting. The contract scope encompasses tanks at nine locations with varying capacities ranging from 250 KG to 3.0 MG, including facilities at the Auxiliary North and South Plants, Main Water Plant, Main Water Reclaimed Plant, North Reclaimed Plant, South Plant, French Avenue Booster, Mellonville Elevated Tank, and Silver Lake Elevated Tank. The contract is proposed to run through fiscal year 2030, with annual performance periods from FY 2026 through FY 2030.
The Schedule of Value document does not contain specific pricing information, as all line items and totals are shown as "$0" across all fiscal years, indicating this is a blank template awaiting contractor pricing submissions. No set-asides, incumbent contractor information, or specific funding amounts are identified in this exhibit. The document serves as the pricing structure through which qualified contractors will submit their proposed costs for maintenance and asset management services across the identified tank locations during the five-year contract period.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOV
| Item | Description | Per Tank/Price | Quantity | FY 2026 | FY 2027 | FY 2028 | FY 2029 | FY 2030 |
| 1 | Auxiliary N. Plant 3100 Orlando Drive Sanford, FL 32771 (1.0 MG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Auxiliary S. Plant 3100 Orlando Drive Sanford, FL 32771 (500 KG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Main Water Plant (MWP) 3701 Country Club Road Sanford, FL 32771 (700 KG) | $ - 0 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Main Water Reclaimed Plant - 3701 Country Club Sanford, FL 32771 Reclaimed (3.0MG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | North Reclaimed Plant 1201 W. Seminole Blvd Sanford, FL 32771 (1.5 KG) | $ - 0 | 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | South Plant 3540 Cameron Avenue Sanford, FL 32773 (3.0MG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | French Avenue Booster 1301 French Avenue Sanford, FL 32771 (1.0 MG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | Mellonville Elevated Tank 1101 Mellonville Avenue Sanford, FL 32771 (250KG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9 | Silver Lake Elevated Tank 2601 E. Lake Mary Blvd Sanford, FL 32773 (250KG) | $ - 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | TOTAL RFP PRICE | 0 | 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&"-,Bold"&14Exhibit "A" Schedule of Value &"-,Bold"City of Sanford
RFP 25/26-14
Elevated & Ground Storage Tank Maintenance & Asset Management Due July 2, 2026 at 2:00PM Local Time
File details come from the government source that posted it. Updated .