About this file
This is a pricing sheet exhibit for material, labor, and equipment services for Atlanta Public Schools Facilities Services. The document outlines detailed line items for various construction and maintenance services including asphalt pavement installation at different thicknesses and square yardage ranges, concrete work for sidewalks and driveways, decorative concrete installations, curb and gutter sections, density testing, road base construction, material removal and disposal, traffic striping, sod restoration, and brick paver removal.
The pricing sheet also includes hourly rates for equipment (such as excavators, loaders, trucks, and compactors) and personnel (including superintendents, program managers, foremen, operators, laborers, and concrete finishers) for additional services and emergency support services. All additional services require prior approval from Atlanta Public Schools Facilities Services before work can commence.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25_09007_B_CP Asphalt and Concrete ServicesFi.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Cost, Labor and Equipm
| LINE ITEM | DESCRIPTION | TOTAL COST |
| Asphalt pavement per 1.5" layer | ||
| 1 | 10 sq. yds. or less | |
| 2 | 10.1 to 30 sq. yds. | |
| 3 | Over 30 sq. yards | |
| Asphalt pavement per each add'l. 1/2" layer thickness | ||
| 4 | 10 sq. yds. or less | |
| 5 | 10.1 to 30 sq. yds. | |
| 6 | Over 30 sq. yards | |
| Asphalt pavement 1" thickness (overlay) | ||
| 7 | 10 sq. yds. or less | |
| 8 | 10.1 to 30 sq. yds. | |
| 9 | Over 30 sq. yards | |
| FC-4 Asphalt Friction Course 1" thickness (overlay) | ||
| 10 | 10 sq. yds. or less | |
| 11 | 10.1 to 30 sq. yds. | |
| 12 | Over 30 sq. yards | |
| FC-2 Asphalt Friction Course 5/8" thickness (overlay) | ||
| 13 | 10 sq. yds. or less | |
| 14 | 10.1 to 30 sq. yds. | |
| 15 | Over 30 sq. yards | |
| 4" Concrete (Sidewalk or Driveway) | ||
| 16 | 10 sq. yds. or less | |
| 17 | 10.1 to 20 sq. yds. | |
| 18 | Over 20 sq. yards | |
| Decorative Concrete | panels w/ ribbon, salt rock | |
| 6" Concrete (Sidewalk or Driveway) | ||
| 19 | 10 sq. yds. or less | |
| 20 | 10.1 to 20 sq. yds. | |
| 21 | Over 20 sq. yards | |
| 8" Concrete (Sidewalk or Driveway) | ||
| 22 | 10 sq. yds. or less | |
| 23 | 10.1 to 20 sq. yds. | |
| 24 | Over 20 sq. yards | |
| 6" x 16" Straight or Radius Upright Curb | ||
| 25 | 20 lin. ft. or less | |
| 26 | Over 20 lin. ft. | |
| 2 ft. Curb & Gutter Section or Radius | ||
| 27 | 20 lin. ft. or less | |
| 28 | Over 20 lin. ft. | |
| Density Tests: Certified Testing Lab (when required by agency inspector) | ||
| 29 | Soil Proctor Test | |
| 30 | Soil Density Test | |
| 8" Concrete Roadway replacement (broom finished) | ||
| 31 | 10 sq. yds. or less | |
| 32 | Over 10 sq. yds. | |
| 8" Concrete Road Base (unfinished) | ||
| 33 | 10 sq. yds. or less | |
| 34 | Over 10 sq. yds. | |
| Remove Asphalt and Dump | ||
| 41 | 10 sq. yds. or less | |
| 42 | 10.1 to 20 sq. yds. | |
| 43 | 20.1 to 40 sq. yds. | |
| 44 | Over 40 sq. yds. | |
| Milling of Asphalt and Dump | ||
| 45 | 10 sq. yds. or less | |
| 46 | 10.1 to 20 sq. yds. | |
| 47 | 20.1 to 40 sq. yds. | |
| 48 | Over 40 sq. yds. | |
| Remove Concrete and Dump | ||
| 49 | 10 sq. yds. or less | |
| 50 | 10.1 to 30 sq. yds. | |
| 51 | Over 30 sq. yards | |
| Stripes & Lines - white & yellow (to DOT Standards) | ||
| 56 | 4" Solid | |
| 57 | 6" Solid | |
| 58 | 8" Solid | |
| 59 | 12" Solid | |
| 60 | 18" solid | |
| 61 | 24" Solid | |
| 62 | 6" Skip | |
| 63 | Directional Arrow | |
| 64 | Message | |
| 65 | Reflective Marker | |
| 66 | Rail Road | |
| Sod Restoration | ||
| 73 | Sod - St Augustine | |
| 74 | Sod - Bahia | |
| 75 | Sod - Zoysia | |
| 76 | Sod - Bermuda | |
| Brick Paver | ||
| 77 | Removal and disposal | |
| Grand Total |
| Additional services and emergency support services may be requested from the Contractor in response to unplanned events. Services that include the equipment and personnel listed below will need approval from Atlanta Public Schools Facilities Services before starting site work. | ||
| LINE ITEM | DESCRIPTION | Hourly Rate |
| Equipment | ||
| 1 | Large Excavator | |
| 2 | Small Excavator | |
| 3 | Front End Loader | |
| 4 | Skid Steer Loader | |
| 5 | Broom Tractor | |
| 6 | Roller Compactor | |
| 7 | Light Tower | |
| 8 | Dump Truck | |
| 9 | Street Saw | |
| 10 | Water Truck | |
| 11 | Pick Up Truck | |
| Personnel | ||
| 12 | Superintendent | |
| 13 | Program Manager | |
| 14 | Foreman | |
| 15 | Operator | |
| 16 | Laborers | |
| 17 | Concrete Finisher | |
| Insert additional positions if needed | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 |