This document is a Statement of Work (SOW) for landscaping maintenance services at the CMR Residence, located at Residence 8 Leedon Park for the U.S. Embassy in Singapore. The SOW provides detailed specifications for comprehensive tree and vegetation maintenance, including pruning, trimming, height reduction, and removal of dead or undesirable branches across multiple tree types such as coconut trees, bamboo clusters, and various unnamed tree species. The work involves precise landscaping interventions for approximately 20 distinct areas/tree groups, with specific instructions for each location including pushing back vegetation from fences, walkways, and structures, removing dead leaves and coconuts, and maintaining overall aesthetic and safety standards.

The contract requires the contractor to perform work within 60 calendar days of contract award, with a 10-calendar day completion window, operating during standard working hours (0900-1700 Monday-Friday). The contractor is responsible for providing all materials, equipment, and personnel, ensuring safety compliance, obtaining necessary permits, and performing work of good quality. Key contractual requirements include providing floor and wall protection, reporting incidents, complying with local labor laws, and maintaining personal protective equipment for all workers. The SOW emphasizes the contractor's responsibility for professional quality, technical accuracy, and coordination of all services performed under the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

STATEMENT OF WORK

FOR

Landscaping maintenance at

CMR Residence.

Project:

Residence 8 Leedon Park

U.S. Embassy Singapore

April 10th, 2025

2 | P a g e

The U.S. Embassy intends to award a contract for various landscaping maintenance work at its property at 8 Leedon Park. The contractor is to supply all material, equipment, labor and tools to complete the following:-

Intend:- The intend for pruning and trimming of the trees in the compound is to encourage trees to develop a strong structure and reduce the likelihood of damage during severe weather. Removing broken or damaged limbs encourage wound closure. Pruning for aesthetics, involves enhancing the natural form and character of trees or stimulating flower production. Also, to remove overgrown branches from crops such as trees, shrubs, and hedges. Extreme growth can prevent sunlight exposure to most parts of the tree hence inhibiting growth.

Scope of work:-

• Pruning/Trimming/Crowning

• Removal / Cutting of dead branches

• Removal of vines and plants on tree trunk

• Disposal and cleaning up of work area

Safety NOTE : Contractors are responsible to barricade and take all necessary safety measures prior in conducting the work. They are to dispose at an appropriate/ designated site that are approved by local law. To clean affected area after work is done.

All safety procedures, certificate, work from height and safety plan are to be submitted to APOSHO prior to start of work.

FIG 1

• Pruning/Trimming/Crowning

• Remove dead / superfluous or undesirable branch.

3 | P a g e

FIG 2a

• Trim all leaves and branches that crosses over the fence.

• Remove all dead branches.

FIG 2b

• Height reduction 2m

• Crowning

FIG 3

• Height reduction 3m

• Crowning

4 | P a g e

FIG 4

FIG 5

• From guard house to upslope of the driveway.

5 | P a g e

FIG 6

• Pruning/Trimming

FIG 7

• Remove all dead leaves

6 | P a g e

FIG 8

• Trim to push back to fences (OPTIONAL)

FIG 9

• Trim to push back to fences (OPTIONAL)

7 | P a g e

FIG 10

• Total of 7 trees clustered

• Height reduction 3m

FIG 10a

8 | P a g e

FIG 10b

FIG 11

• Total of 6 coconut trees

• Remove all coconuts

9 | P a g e

FIG 12

• Bamboo trees (2 cluster)

• Trim to push back 1m from walkway

• Remove dead bamboo trees

• Remove completely all slanting bamboo trees

FIG 13

• Bamboo trees (8 cluster)

• Height reduction 2m

• Remove dead bamboo trees

10 | P a g e

FIG 14

• Height reduction 3m

• Trim back 1m away from chiller enclosure

FIG 15

• Height reduction 3m

11 | P a g e

FIG 16

• Trim back from driveway 3-4 m

FIG 17

• Height reduction 3m

12 | P a g e

FIG 18

• Coconut trees

• Remove all coconuts

FIG 19

• Bamboo tree

• Height reduction 2m

• Remove all dead branches

13 | P a g e

FIG 19a

• Clear all bushes on the ground

• Remove bamboo tree behind.

FIG 20

• Cluster of 4 trees

• Height reduction 3m

14 | P a g e

FIG 21a

• Height reduction 1m

FIG 21b

• Remove tree branch completely

1. CONTRACT ADMINISTRATION

a. OBO does not make representations or warranties of whatsoever kind or nature, either expressed or implied, as to the quality, level of completion, accuracy, extent of compliance with the standards, codes and requirements described or referred to in this SOW, or the extent of coordination between or among the documents provided to the Contractor.

b. Neither the Embassy’s nor OBO’s review, approval, or acceptance of, nor payment for the services required under this contract, shall be considered to operate as a waiver of any rights under this contract or any cause of action against the Contractor arising out of the performance of this contract.

c. OBO has the right to inspect and test all services called for by the contract, to the extent practicable, at all times and places during the term of the contract. OBO may perform quality assurance inspections (QAI) to confirm the work is being performed according to the Statement of Work.

2. RESPONSIBILITY OF THE CONTRACTOR

a. The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all construction and other services furnished under this contract. The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in its construction and other services.

15 | P a g e

b. The Contractor is to provide floor and wall protection for all areas accessed during the work and will be responsible for the repair of damage to floors, walls, furnishings, or property caused by work performed under this contract, at no additional cost.

c. The Contractor is responsible for safety, obtaining any necessary licenses and permits and shall comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters. Embassy staff reserve the right to stop work is unsafe practices are observed. Personal Protection Equipment appropriate for the work being done is required for everyone on site.

d. The Contractor shall promptly report all incidents resulting in lost time, disabling, or fatal injuries to the Contracting Officer’s Representative (COR) to be identified during the site visit. The Contractor shall also be responsible for all damages to persons or property that occurs as a result of the Contractor’s fault or negligence.

3. CONSTRUCTION REQUIREMENTS

a. The Contractor shall be responsible for all required materials (unless stated otherwise), equipment and personnel to manage, administer, and supervise this project. All workmanship shall be of good quality and performed in a skillful manner as determined of OBO.

b. The period of performance; work is to commence within 60 calendar days of contract award (including all material ordering lead time) and will be finished within 10 calendar days from start. Scheduled start date needs to be coordinated with the COR and end customer.

c. The Contractor shall have limited access to the remainder of the building outside the areas designated for the project, except with permission by the CO or COR.

d. Working hours will be from 0900 – 17:00 Monday – Friday, excluding local and U.S.

holidays. Weekend or afterhours work must be approved by the CO or COR and will not be justification for additional cost.

4. DELIVERABLE SCHEDULE

The Contractor shall commence work under this contract promptly, execute the work diligently, and achieve final completion and acceptance of the project, including final cleanup of the premises, within the contract period specified.

END OF STATEMENT OF WORK