Exhibit A-H ELIN Price List 241122.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- DIVERS LIFE SUPPORT SYSTEM (DLSS) SERVICE Federal contract opportunity
- Solicitation number
- H9224025Q0003
- Issued by
- United States Special Operations Command
About this file
This is a pricing template spreadsheet for a Naval Special Warfare Command Divers Life Support System (DLSS) contract (H92240-25-Q-0003). The template covers seven years of performance (five base years plus two option years) and includes space for FAR 52.217-8 option pricing. The spreadsheet contains detailed Exhibit Line Item Numbers (ELINs) for various maintenance requirements, including periodic maintenance, overhauls, filter replacements, and calibrations for diving life support equipment. Each year contains 46 identical line items with quantities ranging from 1 to 1,500 units per item, though pricing fields are unpopulated. Notable requirements include compressor overhauls at various hour intervals (253, 757, 20020, and 50050 hours), hydro testing, filter cartridge replacements for Bauer systems, and general labor rates for unspecified maintenance tasks. The template includes a note that estimated quantities are for evaluation purposes only and do not represent guaranteed purchase amounts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 DoL WD 2015-5635 Rev 25.pdf | ||
| Attachment 1 PWS 241210.pdf | ||
| H9224025Q0003.pdf | ||
| Attachment 3 Contractor Requirements Submission Matrix.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| H92240-25-Q-0003 |
| Naval Special Warfare Command - DLSS |
| YEAR ONE | Award + 12 Months, To Be Populated At Award |
| YEAR TWO | To Be Populated At Award |
| YEAR THREE | To Be Populated At Award |
| YEAR FOUR | To Be Populated At Award |
| YEAR FIVE | To Be Populated At Award |
| YEAR SIX (OPTION) | To Be Populated At Award |
| YEAR SEVEN (OPTION) | To Be Populated At Award |
| Total Evaluated Price Year 1 | $ - 0 |
| Total Evaluated Price Year 2 | $ - 0 |
| Total Evaluated Price Year 3 | $ - 0 |
| Total Evaluated Price Year 4 | $ - 0 |
| Total Evaluated Price Year 5 | $ - 0 |
| Total Evaluated Price Year 6 | $ - 0 |
| Total Evaluated Price Year 7 | $ - 0 |
| Total Evaluated Price FAR 52.217-8 | $ - 0 |
| TOTAL EVALUATED PRICE | $ - 0 |
YEAR 1
| YEAR 1 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| A001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| A002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| A003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| A004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| A005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| A006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| A007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| A008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| A009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| A010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| A011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| A012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| A013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| A014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| A015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| A016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| A017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| A018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| A019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| A020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| A021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| A022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| A023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| A024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| A025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| A026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| A027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| A028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| A029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| A030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| A031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| A032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| A033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| A034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| A035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| A036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| A037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| A038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| A039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| A040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| A041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| A042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| A043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| A044 | Calibrate in place | 5 | 0 | |||||
| A045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| A046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
YEAR 2
| YEAR 2 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| B001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| B002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| B003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| B004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| B005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| B006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| B007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| B008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| B009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| B010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| B011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| B012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| B013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| B014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| B015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| B016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| B017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| B018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| B019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| B020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| B021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| B022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| B023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| B024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| B025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| B026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| B027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| B028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| B029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| B030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| B031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| B032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| B033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| B034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| B035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| B036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| B037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| B038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| B039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| B040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| B041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| B042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| B043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| B044 | Calibrate in place | 5 | 0 | |||||
| B045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| B046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
YEAR 3
| YEAR 3 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| C001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| C002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| C003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| C004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| C005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| C006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| C007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| C008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| C009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| C010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| C011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| C012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| C013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| C014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| C015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| C016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| C017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| C018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| C019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| C020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| C021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| C022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| C023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| C024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| C025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| C026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| C027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| C028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| C029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| C030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| C031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| C032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| C033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| C034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| C035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| C036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| C037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| C038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| C039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| C040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| C041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| C042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| C043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| C044 | Calibrate in place | 5 | 0 | |||||
| C045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| C046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
YEAR 4
| YEAR 4 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| D001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| D002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| D003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| D004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| D005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| D006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| D007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| D008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| D009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| D010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| D011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| D012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| D013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| D014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| D015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| D016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| D017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| D018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| D019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| D020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| D021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| D022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| D023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| D024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| D025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| D026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| D027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| D028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| D029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| D030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| D031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| D032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| D033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| D034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| D035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| D036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| D037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| D038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| D039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| D040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| D041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| D042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| D043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| D044 | Calibrate in place | 5 | 0 | |||||
| D045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| D046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
YEAR 5
| YEAR 5 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| E001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| E002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| E003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| E004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| E005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| E006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| E007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| E008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| E009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| E010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| E011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| E012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| E013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| E014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| E015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| E016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| E017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| E018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| E019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| E020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| E021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| E022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| E023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| E024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| E025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| E026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| E027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| E028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| E029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| E030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| E031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| E032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| E033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| E034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| E035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| E036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| E037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| E038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| E039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| E040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| E041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| E042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| E043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| E044 | Calibrate in place | 5 | 0 | |||||
| E045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| E046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
YEAR 6 (OPTION)
| YEAR 6 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| F001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| F002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| F003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| F004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| F005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| F006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| F007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| F008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| F009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| F010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| F011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| F012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| F013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| F014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| F015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| F016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| F017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| F018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| F019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| F020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| F021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| F022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| F023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| F024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| F025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| F026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| F027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| F028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| F029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| F030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| F031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| F032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| F033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| F034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| F035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| F036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| F037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| F038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| F039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| F040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| F041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| F042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| F043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| F044 | Calibrate in place | 5 | 0 | |||||
| F045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| F046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
YEAR 7 (OPTION)
| YEAR 7 | ||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | ||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | ||
| G001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 9 | 0 | ||
| G002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 6 | 0 | ||
| G003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| G004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 6 | 0 | ||
| G005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 6 | 0 | ||
| G006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 6 | 0 | ||
| G007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 6 | 0 | ||
| G008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 6 | 0 | ||
| G009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 6 | 0 | |||
| G010 | 5921/063-68 | A7PS36 Y | 24M-1R | 6 | 0 | |||
| G011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 6 | 0 | |||
| G012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 6 | 0 | ||
| G013 | 5921/032 | B7 8GSB Y | 24M-6 | 12 | 0 | |||
| G014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 12 | 0 | |||
| G015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 12 | 0 | |||
| G016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 12 | 0 | |||
| G017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 12 | 0 | |||
| G018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 12 | 0 | |||
| G019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 12 | 0 | |||
| G020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 12 | 0 | ||
| G021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 12 | 0 | |||
| G022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 12 | 0 | ||
| G023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 12 | 0 | ||
| G024 | 5921/034 | 18 6KTB Y | 36M-4 | 26 | 0 | |||
| G025 | 5921/034 | B6 9YCS N | 60M-1 | 10 | 0 | |||
| G026 | 5921/034 | 77 1HA1 N | 72M-1 | 5 | 0 | |||
| G027 | 5921/080 | B7 8GSB y | 24M-6 | 45 | 0 | |||
| G028 | 5921/080 | A6 9YCV N | 60M-5 | 2 | 0 | |||
| G029 | 5921/182 | 91 9LDJ N | 60M-1 | 420 | 0 | |||
| G030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 220 | 0 | ||
| G031 | 5921/033-46 | B5 8GTL U | U-2 | 10 | 0 | |||
| G032 | 5921/034-66 | 28 1CY8N | 18M-3 | 12 | 0 | |||
| G033 | B7 8GSB Y | 24M-6 | 12 | 0 | ||||
| G034 | 63 IGZ6 N | 36M-2 | 12 | 0 | ||||
| G035 | 26 6KTB Y | 36M-4 | 12 | 0 | ||||
| G036 | 24 IGZ7N | 36M-5 | 12 | 0 | ||||
| G037 | B6 9YCS N | 60M-1 | 12 | 0 | ||||
| G038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 1 | 0 | ||
| G039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 2 | 0 | |||
| G040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 6 | 0 | ||||
| G041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 3 | 0 | ||||
| G042 | 66 8GSB Y | removal/inspect/replace oil & filter | 4 | 0 | ||||
| G043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 5 | 0 | ||||
| G044 | Calibrate in place | 5 | 0 | |||||
| G045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 1500 | 0 | |||||
| G046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | ||||||
| TOTAL EVALUATED PRICE | 0 | |||||||
| FILL IN PROPOSED FIRM FIXED PRICING IN YELLOW CELLS |
FAR 52.217-8
| FAR 52.217-8 | |||||||||
| ELIN | Maintenance Index Page (MIP) | Maintenance | |||||||
| Requirement Card (MRC) NO. | PERIODICITY CODE | Periodicity Requirements | Proposed Price | Estimated Qty* | Total Evaluated Price | *Note these Estimated Qtys are for evaluation purposes only and shall not be construed as the exact amount the Government intends to purchase under performance of this contract. | |||
| H001 | 9802/006-B5 | 34 A7RB U | U-1 | Every 2 year required/Overhaul | 0 | 9 | 0 | ||
| H002 | 5921/037-98 | 96 9QQC Y | 24M-1R | Every 200±20 hours of operation /Overhaul | 0 | 6 | 0 | **The evaluated price of the option under FAR 52.217-8 will be calculated by the Government at 50% of the total price for Year 5. | |
| H003 | 5921/037-98 | 18 6KTB Y | 36M-4 | 0 | 6 | 0 | |||
| H004 | 5921/037-98 | 33 6JGT N | R-2 | Every 25±3 hours of operation/Overhaul | 0 | 6 | 0 | ||
| H005 | 5921/037-98 | 96 6LNG N | R-3 | Every 75±7 hours of operation/Overhaul | 0 | 6 | 0 | ||
| H006 | 5921/037-98 | 96 9ZAX U | U-1 | Accomplish when compressor operation indicates possible internal damage | 0 | 6 | 0 | ||
| H007 | 5921/063-68 | A7 1MX4 N | A-6R | Every 500±50 hours of operation/ Overhaul | 0 | 6 | 0 | ||
| H008 | 5921/063-68 | A7 PS36 Y | 24M-1R | Every 200±20 hours of operation/ Overhaul | 0 | 6 | 0 | ||
| H009 | 5921/063-68 | A6 6JGN Y | 18M-3 | 0 | 6 | 0 | |||
| H010 | 5921/063-68 | A7PS36 Y | 24M-1R | 0 | 6 | 0 | |||
| H011 | 5921/063-68 | 18 6KTB Y | 36M-4 | 0 | 6 | 0 | |||
| H012 | 5921/063-68 | 96 6LNG N | R-3 | Every 75±7 hours of operation/ Overhaul | 0 | 6 | 0 | ||
| H013 | 5921/032 | B7 8GSB Y | 24M-6 | 0 | 12 | 0 | |||
| H014 | 5921/065-98 | 18 6KTB Y | 36M-4 | 0 | 12 | 0 | |||
| H015 | 5921/065-98 | A6 1LS5 N | 24M-1 | 0 | 12 | 0 | |||
| H016 | 5921/065-98 | B6 8MVH Y | 36M-1 | 0 | 12 | 0 | |||
| H017 | 5921/065-98 | A6 9CDN Y | 36M-2 | 0 | 12 | 0 | |||
| H018 | 5921/065-98 | A6 9AQF Y | 36M-3 | 0 | 12 | 0 | |||
| H019 | 5921/065-98 | 98 6KTB Y | 36M-4 | 0 | 12 | 0 | |||
| H020 | 5921/065-98 | A6 8MVJ Y | 36M-5R | Every 24±2 hours of operation/ Overhaul | 0 | 12 | 0 | ||
| H021 | 5921/065-98 | B7 1KG0 N | 72M-1 | 0 | 12 | 0 | |||
| H022 | 5921/065-98 | A6 8MVL U | U-1 | Accomphlished when loss of system integrity is suspected/piping disassembly | 0 | 12 | 0 | ||
| H023 | 5921/065-98 | A9 1KG1 U | U-2 | Acomphlished where contamination of componet is determined suspect | 0 | 12 | 0 | ||
| H024 | 5921/034 | 18 6KTB Y | 36M-4 | 0 | 26 | 0 | |||
| H025 | 5921/034 | B6 9YCS N | 60M-1 | 0 | 10 | 0 | |||
| H026 | 5921/034 | 77 1HA1 N | 72M-1 | 0 | 5 | 0 | |||
| H027 | 5921/080 | B7 8GSB y | 24M-6 | 0 | 45 | 0 | |||
| H028 | 5921/080 | A6 9YCV N | 60M-5 | 0 | 2 | 0 | |||
| H029 | 5921/182 | 91 9LDJ N | 60M-1 | 0 | 420 | 0 | |||
| H030 | 5921/019-76 | 63 1CC0 N | 60M-1 | Flat Rate Hydro (A-1 included) | 0 | 220 | 0 | ||
| H031 | 5921/033-46 | B5 8GTL U | U-2 | 0 | 10 | 0 | |||
| H032 | 5921/034-66 | 28 1CY8N | 18M-3 | 0 | 12 | 0 | |||
| H033 | B7 8GSB Y | 24M-6 | 0 | 12 | 0 | ||||
| H034 | 63 IGZ6 N | 36M-2 | 0 | 12 | 0 | ||||
| H035 | 26 6KTB Y | 36M-4 | 0 | 12 | 0 | ||||
| H036 | 24 IGZ7N | 36M-5 | 0 | 12 | 0 | ||||
| H037 | B6 9YCS N | 60M-1 | 0 | 12 | 0 | ||||
| H038 | 5921 /063-18 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer 0-26 | 0 | 1 | 0 | ||
| H039 | C7 1GV2 Y | 18M-9R | remove and replace filter/drying cartridge Bauer K-60 | 0 | 2 | 0 | |||
| H040 | C5 PP93 Y | remove and replace filter/drying cartridge Bauer MVT42 | 0 | 6 | 0 | ||||
| H041 | A7 PS36 Y | removal/cleaning/inspection/reinstallation | 0 | 3 | 0 | ||||
| H042 | 66 8GSB Y | removal/inspect/replace oil & filter | 0 | 4 | 0 | ||||
| H043 | 18 6KTB Y | Flat Rate Calibration x2 ea | 0 | 5 | 0 | ||||
| H044 | Calibrate in place | 0 | 5 | 0 | |||||
| H045 | General Labor Rate - This rate will be used to negotiate Task Order for work items within the scope of the contract not accounted for in this ELIN structure and IAW DFARS 252.217-7028 | 0 | 1500 | 0 | |||||
| H046 | Other DLSS Services/Supplies to be negotiated throughout contract performance. | To Be Negotiated | |||||||
| TOTAL EVALUATED PRICE | 0 |
File details come from the government source that posted it. Updated .