This document is a Procurement and Fabrication Specification for the PIP-II production HB650 Cryomodule, specifically for the vacuum vessel, strongback, and support posts. Fermilab Forward Discovery Group (FFDG) is seeking a manufacturer to procure and fabricate one complete assembly, including a vacuum vessel, strongback tray, and G11 support posts. The specification outlines detailed requirements for materials, dimensional conformance, welding, cleanliness, painting, serial number stamping, and assembly, with multiple hold points and quality control measures throughout the fabrication process.
Key requirements include using specified drawings, performing comprehensive quality controls, conducting helium leak testing, applying specific epoxy primers and topcoats, and coating certain components with high emissivity coating. The manufacturer must provide certified mill test reports, generate dimensional control reports using a laser tracker system, and perform a traction test on the G11 support posts. The project has a 12-month lead time, and the manufacturer will be responsible for assembling all components at their premises prior to delivery, with FFDG representatives conducting reviews at critical stages of the manufacturing process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIP-II HB650 Cryomodule
- Procurement and Fabrication Specification -
Vacuum Vessel, Strongback, Support Posts
Author: J. Bernardini
Document Number: ED0043300 Rev -
Document Approval Date Approved
Originator J. Bernardini As in TC
Checker V. Roger As in TC
Approver J. Ozelis As in TC
PIP-II
Procurement and Fabrication Specification
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 2
Revision History
Author Revision Date Description of Change
J. Bernardini June 2025 Initial Release
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 3
Table of Contents
1 Scope 4
2 Procurement Specification 4
2.1 Bidding Phase 4
2.2 Technical and Cost Evaluation Phase 5
2.3 Execution Phase and Hold Points 5
3 Fabrication Specification 7
3.1 Introduction 7
3.2 Materials 10
3.3 Dimensional conformance 10
3.4 Cleanliness 11
3.5 Welding 11
3.5.1 Vacuum vessel weldment 11
3.5.2 Strongback module weldments 11
3.6 Leak check 12
3.7 Painting and Coating 12
3.8 Serial number stamping 14
3.9 Hardware 17
3.10 Assembly 17
`0.1 Traction test of the G11 Support Posts 18
3.10.2 Strongback assembly 18
3.10.3 Strongback & G11 posts Insertion 18
3.11 Common parts to be procured 19
3.12 Quality controls 19
3.13 Shipping Plan 20
APPENDIX A: Technical datasheets of epoxy for vessel interior painting 21
APPENDIX B: Technical datasheets of High Emissivity Coating 25
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 4
1 Scope
The High-Beta 650 MHz Cryomodule (HB650 CM) is one of the five different types of cryomodules (total of 23 units) that will constitute the PIP-II linear accelerator complex. The present specification is intended to inform the procurement, fabrication, and assembly of the vacuum vessel, strongback tray, and support posts for the HB650 CM, in quantity indicated in Table 1.
Top Assembly Drawing Description Quantity
F10243028 PROCUREMENT ASSY, HB650 VESSEL – SB – G11 POST 1
Table 1: Quantities and Top Assembly Drawing
Note: In FY 2021, a prototype vacuum vessel was procured by FNAL and manufactured according to drawing package F10148048 Rev H, which is attached to this specification for reference. This prototype vessel will be made available by FNAL to the Manufacturer for rework and modification to bring it into compliance with the production vacuum vessel requirements per drawing package F10196098 Rev D. An overview of the expected list of reworks to the prototype vacuum vessel is provided in ED0043279.
Except for the prototype vacuum vessel, the Manufacturer shall provide all materials necessary to fabricate complete deliverables. The Manufacturer shall provide manufacturing engineering services required to generate internal shop drawings, and all documentation needed to manage and support their suppliers. The Manufacturer shall provide all labor to assemble, test, and supervise the manufacture of all components regardless of where these are made: within the manufacturer’s plant or in a second facility or sub-contractor. The Manufacturer shall fabricate jigs and fixtures to ensure flange faces, ports, brackets, and other important components are maintained to specified tolerances. Any information of a proprietary nature must be identified in the bid response.
FFDG is requesting that offerors provide firm-fixed pricing for DAP shipping (HTS code 8543.90.88.45) as part of their firm-fixed-price proposal to the RFP.
2 Procurement Specification
Purchase Order will be owned and managed by Fermilab Forward Discovery Group (FFDG).
2.1 Bidding Phase
Bidder shall provide Quotation including all costs to deliver the assembly indicated in Table 1, along with the following documentation:
a) Schedule that meets a lead time of 12 months, starting from the date that the FFDG Purchase
Order is awarded to the Bidder running through fabrication, including hold points reported in
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 5
Table 2. Shipping batches will be defined at the time of the MRR. Supporting documentation, to demonstrate that the Bidder will deliver within the specified timeframe, is recommended.
b) Technical Proposal to demonstrate the ability of the Bidder to deliver the assembly with performance that meets or exceeds Fabrication Specification reported in section 3 of this document. The Bidder shall list the equipment that will be used for manufacturing, and shall disclose what part of the work, if any, will be sub-contracted.
c) Past experience including examples of past projects (within the last five years) that closely match the scope in complexity and value, and that best illustrate the bidder’s capability, experience, and performance.
d) Management Control Plan to demonstrate the ability to ensure the required quality standard (see section 3) throughout the entire execution of the project. Examples of documentation developed for past projects (within the last five years) to meet the pressure vessel codes of ASME B & PV VIII
Division I, 2021, and ASME section IX in terms of welding process, inspection and testing will be considered for the technical evaluation.
All required documentation shall be organized with a table of contents and corresponding sections.
2.2 Technical and Cost Evaluation Phase
FFDG Purchase Order is awarded to one bidder after that the proposals will have been evaluated by technical and cost evaluation teams.
2.3 Execution Phase and Hold Points
Upon FFDG purchase order award, the Manufacturer shall assign a person responsible for the technical execution and Quality Control (QC) of the project, and a person responsible for the commercial follow-up, throughout the duration of the contract. They shall be able to communicate in English.
Within two weeks from FFDG purchase order award, a kick-off meeting shall be scheduled to initiate technical and commercial discussion between the technical and commercial representatives from FFDG and the Manufacturer. Action items from the meeting shall be addressed within one week.
Upon conclusion of the kick-off meeting, FFDG expects to receive bi-weekly a status report via e-mail
(FFDG will provide a template) from the manufacturer. Also, a monthly meeting held by videoconference shall be regularly scheduled to discuss technical and commercial updates. The meetings will be held in
English. However, FFDG representatives are always available to respond any time if questions will arise.
Within eight weeks from FFDG purchase order award and before starting any fabrication / procurement activity, the Manufacturing Readiness Review (MRR) shall be organized to allow FFDG reviewers to assess the Manufacturer’s level of preparation to proceed to the manufacturing and procurement phase.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 6
Review’s recommendations (if any) based on the presented material (see MRR deliverables in Table 2), shall be addressed within two weeks from the conclusion of the MRR.
Upon conclusion of the MRR, the Manufacturer will be allowed to proceed with the fabrication / procurement phase. Quality Controls (see section 3.12) and Technical reports, as detailed in Table 2, shall be provided by the Manufacturer to FFDG.
The readiness to ship the units shall be assessed through an appropriate review.
A Hold Point is defined as the moment in time wherein the process needs to be stopped in order to allow a FFDG representative to perform reviews and QCs deemed necessary. Table 2 lists the main hold points and associated documentation deliverables for this project.
Hold Point Description Deliverables When required
A Kick-off Meeting Address action items from the meeting Within 2 weeks of contract award
B Manufacturing Readiness Review(s) (MRR)
MDED (see section 3.3) Welding documentation (see section 3.5)
Common Parts to be procured Documentation (see section 3.11)
Detailed MIP and Travelers’ template (see section 3.12)
Within 8 weeks from FFDG purchase order award and before starting any Fabrication / Procurement
C Traction Test of the G11 Support Post QC report(s) As specified in the MIP
D Final Dimensional Check of the Strongback Modules QC report(s) As specified in the MIP
E Final Dimensional Check of the reworked Vacuum Vessel QC report(s) As specified in the MIP
F Pre-painting Leak Check of the Vacuum Vessel QC report(s) As specified in the MIP
G Painting Readiness Review Detailed plan describing which surfaces will be painted and which holes and surfaces will be masked off.
As specified in the MIP
H Final leak check of the vacuum vessel QC report(s) As specified in the MIP
I Discrepancies / Nonconformities Discrepancy report(s) As soon as identified
L Shipping Readiness Review
Shipping Plan (see section 3.13) Final version of MIP
Final version of MDED Final version of Welding documentation
Discrepancy report(s) (If applicable) CMTRs (see sections 3.2) Visual Inspection Reports
Certificate of dimensional controls (see section 3.3)
Leak Checking reports (see section 3.6)
Prior to shipping
Table 2: Hold Points and Documentation Deliverables for Fabrication Phase
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 7
3 Fabrication Specification
This section provides a technical introduction of the scope, assembly to be manufactured, quality controls, and shipping plan.
3.1 Introduction
FFDG engineering drawing packages listed in Table 1 shall be used for the complete parts list, including the hardware needed for assembling.
For technical introduction, Table 3 lists ONLY the main subassemblies of top assembly F10243028.
Item No. Name of sub-assembly Description
F10196098 Vacuum Vessel Assembly
This assembly serves to house all the CM components which operate in a moderate to high vacuum service. Note: the Manufacturer is required to rework of a pre-existing vacuum vessel as detailed in ED0043279.
F10143029 Strongback Assembly This assembly serves as the structure backbone of the coldmass.
F10117006 G11 Support Post
An assembly of a low thermal conductivity G11 fiberglass pipe and three stages of shrink-fit aluminum and stainless-steel discs and rings.
Assembly and test procedure in ED0009719.
Table 3: List and descriptions of main sub-assemblies.
The vacuum vessel assembly consists of a cylindrical shell, anchored to the floor with bottom supports, and equipped with lugs for lifting purposes. The vessel shell is closed at the upstream and downstream side with endcaps, which host viewports and access ports. The vessel has got ports for input RF power couplers, access, instrumentation, vacuum pump-out, and safety relief. The main components of SSR2 vacuum vessel are shown in Figure 1 and Figure 2.
The vacuum vessel provides a structural support for the strongback, which can slide in the vessel by means of a system of rails and wheels. The strongback is locked to the vessel with fourteen studs accessible from the outside. Twelve G11 support posts are bolted to the strongback, as shown in Figure 3.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 8
Figure 1: F10196098, Vacuum Vessel Cryogenic Side
Figure 2: F10196098, Vacuum Vessel Instrumentation Side
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 9
Figure 3: F10243028, Vacuum Vessel with Strongback Section View
Figure 4: F10143029, Strongback Assembly
Figure 5: F10117006, G11 Support Post
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 10
3.2 Materials
Materials are specified in the referenced drawings. The use of any materials non-listed in the drawings is excluded by the present specification. Under exceptional conditions FFDG may approve other materials upon a written request. Exceptions for hardware materials are specified in section 0.
Certified Mill Test Reports (CMTR) of all raw materials used to fabricate deliverables shall be provided to
FFDG as soon as materials are received and as part of the deliverables of the shipping readiness review
(see Table 2). Electronic copies of materials certifications in PDF format shall be provided and shall include all processes and tests with grade and composition being clearly identifiable and traceable to the respective component.
If the vendor obtains components from a subcontractor, the vendor is responsible to prove that the materials and welds for the components meet compliance requirements.
3.3 Dimensional conformance
All drawings referenced shall be used by the Manufacturer for configuration control and dimensional conformance. Dimensional variances and overall envelope configuration shall be maintained within specified tolerances.
The drawings supplied as part of this request for proposal are to be considered near-final release. The final set of drawings (latest revisions), including minor modifications that might occur during the bidding phase, will be given to the Manufacturer at the time of the kick-off meeting.
The Manufacturer may decide to use the drawings provided by FFDG for fabrication, or to produce its own drawings. Any change or deviation from the set of drawings provided by FFDG shall be listed in a
Manufacturer’s Drawings Exception Document (MDED). FFDG will have to provide a written approval to the MDED before the Manufacturer can proceed to the next step. FFDG is not accountable for any change in the drawings not listed in the MDED. The MDED can be revised and approved throughout the entire duration of the project.
CMM reports shall be produced for the following parts:
- F10117006 and subcomponents: G11 SUPPORT POST – HB650 (before and after traction test, as specified in ED0009719).
- F10143020: 650HB STRONGBACK MODULE MACHINED.
- F10143022: 650HB US STRONGBACK MODULE MACHINED.
- F10144062: 650HB DS STRONGBACK MODULE MACHINED.
- Subcomponents of F10148039: ASSEMBLY, METROLOGY ADJUSTABLE TABLE, HB650.
Dimensional control reports, with the use of a laser tracker system, shall be generated for the following components:
- F10196099: VESSEL, HB650 PROD, FINAL MACHINING.
- F10243028: PROCUREMENT ASSY, HB650 VESSEL – SB – G11 POST.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 11
CMM and dimensional control reports shall be made available by the time of the shipping readiness review, as detailed in Table 2.
3.4 Cleanliness
The interior of the vacuum vessel shall be bead or sand blasted to remove all rust and foreign material.
Before any welding or painting (as specified in drawings), all parts must be degreased with soap and water, followed by a thorough DI water rinse. Parts shall be protected at all stages of fabrication for the cleanliness. Protective caps must be installed during fabrication to help protect sealing surfaces. All threads shall be cleaned and checked with go/no-go gauges before shipment.
3.5 Welding
All weld joints shall conform to types and sizes called out on drawings provided by FFDG, unless otherwise listed in the MDED approved by FFDG.
All weld joints shall be performed using the following welding filler materials:
- Carbon steel to carbon steel: E70XX
- Stainless steel to stainless steel: ER308
- Carbon steel to stainless steel: ER309
Weldment must be free of dirt, grease, oil and chips. The Manufacturer shall ensure that no entrapped gases, fluxes, pits, cracks, or like imperfections are left in the heat affected zones. All fillet welds shall be smooth for cosmetic appearance. Post cleaning of welds with a wire brush only is acceptable and required to leave the surface in a bright finish condition with no trace of solvent residue.
3.5.1 Vacuum vessel weldment
All welding process, inspection and documentation shall be performed and developed in accordance with related pressure vessel codes of ASME B&PV section VIII Division I, 2021.
All welders shall be qualified to the ASME B&PV section IX, 2021. Welding documentation (WPS, WPQ, and PQR) shall be provided to FNAL at the time of the MRR.
3.5.2 Strongback module weldments
The structural welds shall be in accordance with the latest revision of ANSI/AWS D1.6, structural welding code for stainless steel, and the lengths and spacing of the welds shall meet the requirements as specified in the drawings. All welders shall be qualified as required by ANSI/AWS D1.6. A weld map which includes each weld, welder performing the weld, by which WPS, and dated inspector signature shall be provided. All welds must conform to size called out on print. The welding filler material for stainless-to-stainless joint shall be ER308.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 12
3.6 Leak check
Helium leak testing at room temperature shall be used to verify that assembly, subassemblies, and components (when specified on drawings) are suitably leak-tight at all stages of fabrication and assembly.
The allowable leakage rates are indicated on drawings (when applicable). Leak testing should be performed with a calibrated Helium Mass Spectrometer Leak Detector (HMSLD), according to ISO 20485 or equivalent standard.
No painting (external or internal) is allowed before leak check is completed and approved by FFDG representatives.
The completed Vacuum Vessel Assembly shall be made available to FFDG for inspection before, during, or after final leak checking (prior to painting). Advanced notice shall be provided to FFDG for travel arrangements.
3.7 Painting and Coating
After the assembly has passed final leak checking, the carbon steel surfaces and stainless-steel nozzles of the vacuum vessel final machining and top hat shall be painted with a rust preventative primer. The exterior shall be painted with a rust preventative primer, color RAL3026 Luminous bright red (or equivalent) and jet black (RAL 9005) as detailed in the CAD model. Paint sample of RAL3026 Luminous bright red need to be sent to Fermilab for paint color approval. The interior shall be painted with low vapor pressure vacuum compatible rust preventative epoxy paint, color white (RAL 9003). Both interior and exterior paints must be lead free, have good adhesion to the metal surfaces, and must be solvent resistant. Once completed, the vessel shall always remain dry. Before starting any painting process, a
Painting Readiness Review shall be conducted as a hold point listed in Table 2.
All sealing surfaces and threaded areas shall be masked as also specified on drawings prior to painting.
In addition, the next figures show inside of tubes, faces, holes, and threads that shall be masked off during the painting.
Figure 6: HB650 Vacuum Vessel, Cryogenic Connections
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 13
Figure 7: HB650 Vacuum Vessel, Bottom plates
Figure 8: HB650 Vacuum Vessel, Lifting points
Figure 9: HB650 Vacuum Vessel, CM mover & transportation frame interface
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 14
Figure 10: HB650 Vacuum Vessel, Strongback supports
The bottom surface of the weldments of the strongback modules (F10144706, F10144633, and
F10144709) shall be sand blasted and coated with high emissivity coating Aremco HiE-Coat_840-M, as specified on drawings. Heat curing up to 500 K for 60 minutes is required after the coating is applied to dry off chemically retained water.
Included with this package are technical datasheets for interior primer, interior paint finishing recommendations, and high emissivity coating.
3.8 Serial number stamping
Supplier shall permanently etch a serial number on each subassembly listed in the table below. The serial number shall follow this alphanumeric format:
Part# Revision CM# Sequence#
Part number and revision number shall be the ones indicated in FFDG drawings, if no revision is indicated in the drawing, symbol “-“ shall be used. CM number is 3 for all the items included in this procurement package. The sequence number shall increase from 01 to the number of repeated components in the assembly.
Drawings Serialization
F10196099, Rev D F10196099 D 3 01
F10137438, Rev E
F10137438 E 3 01 F10137438 E 3 02 F10137438 E 3 03 F10137438 E 3 04 F10137438 E 3 05 F10137438 E 3 06 F10137438 E 3 07 F10137438 E 3 08 F10137438 E 3 09 F10137438 E 3 10
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 15
F10137438 E 3 11 F10137438 E 3 12 F10137438 E 3 13 F10137438 E 3 14
F10137447, Rev C
F10137447 C 3 01 F10137447 C 3 02 F10137447 C 3 03 F10137447 C 3 04 F10137447 C 3 05 F10137447 C 3 06 F10137447 C 3 07 F10137447 C 3 08 F10137447 C 3 09 F10137447 C 3 10 F10137447 C 3 11 F10137447 C 3 12 F10137447 C 3 13 F10137447 C 3 14
F10143020, Rev C
F10143020 C 3 01 F10143020 C 3 02 F10143020 C 3 03 F10143020 C 3 04
F10143022, Rev C F10143022 C 3 01
F10144062, Rev C F10144062 C 3 01
F10117006, Rev N
F10117006 N 3 01 F10117006 N 3 02 F10117006 N 3 03 F10117006 N 3 04 F10117006 N 3 05 F10117006 N 3 06 F10117006 N 3 07 F10117006 N 3 08 F10117006 N 3 09 F10117006 N 3 10 F10117006 N 3 11 F10117006 N 3 12
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 16
The etched serial number shall be placed consistently on the location shown in figures below.
Figure 11: Downstream flange of the vacuum vessel to be etched (revision letter shall be latest revision & CM number shall be 3)
Figure 12: Serial number location on F10137438
Figure 13: Serial number location on F10137447
Figure 14: Serial number location on F10143020 (same location for all the strongback modules).
Figure 15: Serial number location for F10117006.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 17
3.9 Hardware
The Manufacturer shall provide to FFDG the hardware (bolts, nuts, washers, seals) in quantities listed in the part list of drawings plus 20% for each item. Quantities and materials are the ones listed on drawings, please note that SSB88 is SS 316L. Silicon bronze (SB) hardware in assembly F10196098 may be substituted with CuNi2Si alloy or with silver plated hardware. The substitution shall be communicated and approved by FNAL before the hardware is procured by the Manufacturer. The hardware shall be properly packed and labeled to be easily identifiable during assembling of the components at Fermilab.
3.10 Assembly
It is required that all parts shall be assembled per drawings provided by FFDG at Manufacturer’s premises prior to delivery.
Unless specified on drawings, all the fasteners shall be torqued to their recommended values depending on their sizes and materials, listed in Table 4.
Size Torque (N∙m) Bolt & Nut Material
Association
M2.5 0.4 SS/SB
M3 0.6 SS/SB
M4x0.7 1.9 SS/SB M4x0.7 1.7 BR/SS M5x0.8 2.6 SS/SB M6 x 1 6.8 SS/SB
M8 x 1.25 14.1 SS/SB M8x1.25 12.4 BR/SS
5/16-18 14.1 SS/SB
M10 x 1.5 27.1 SS/SB M12 x 1.75 48.6 SS/SB
M16 x 2 118.6 SS/SB
Table 4: Torque requirements (N∙m) for the fasteners
FFDG may request the Manufacturer to use Loctite in some bolted connections. Those connections will be identified by FFDG and communicated to the Manufacturer during the execution phase.
The support posts shall be assembled on the strongback, and the strongback shall be inserted into the vacuum vessel, as detailed in F10243028. The completed Vacuum Vessel Assembly and Strongback Tray
Assembly shall be made available to an FFDG representative for inspection. Advanced notice shall be provided to FFDG for travel arrangements.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 18
3.10.1 Traction test of the G11 Support Posts
All the assembled G11 Support Posts (F10117006) shall undergo a vertical traction test in tension, as specified in ED0009719. To successfully pass the test, each support post shall sustain a load of 5,000 kg for at least 5 minutes. The following tests results shall be collected and reported:
1. Vertical dimension of the post before the test.
2. Maximum load and time at maximum load.
3. Repeated measurement of the vertical dimension of the post with the same accuracy and in the same conditions as in step 1.
ED0009719 shall be the reference for this test. The traction test should be performed in presence of FFDG representatives. Advanced notice shall be provided to FFDG for travel arrangements.
3.10.2 Strongback assembly
As specified on drawing F10143029, each strongback module shall be connected together using 2 pins
F10143041. Take a video showing the assembly of the strongback F10143029.
3.10.3 Strongback & G11 posts Insertion
Before inserting the strongback & G11 posts in the vacuum vessel:
• Loose the hardware present in F10191096.
• Install F10191095 on the vacuum vessel, note that the serial number of F10137447 and
F10137438 need to match the position described in the Figure 16. F10137447 need to be low enough to allow the strongback insertion.
Figure 16: Vacuum vessel stud positions
After inserting the strongback & G11 posts in the vacuum vessel:
• Move up each F10137447 to meet the conical plate. Keep the strongback wheels in contact with the vacuum vessel rails.
• Torque as specified in Table 4 the hardware in F10196096.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 19
3.11 Common parts to be procured
The common parts are components available on the market from one or multiple suppliers. In the bill of material of FFDG drawings, the common parts are the ones with drawing number starting with letters
‘’FC’’ (example FC0077263).
FC0077263 and FC0077265 are available at one supplier only and shall be procured from JESA
(www.jesa.com), parts numbers are 402977-OPT0002069 with NO SHIELDS and using APIEZON L and
402978-OPT0002069 with NO SHIELD, AND USING APIEZON L, respectively.
- FC0077263: BEARING CYLINDRICAL – JESA 15x55x19 / REF: 402977-OPT0002069 WITH NO
SHIELD, AND USING APIEZON L.
- FC0077265: BEARING FLAT – JESA 15x50x19 / REF: 402978-OPT0002069 WITH NO SHIELD, AND
USING APIEZON L.
Documentation of the parts to be procured parts shall be submitted to FFDG for approval, as detailed in Table 2.
3.12 Quality controls
The Manufacturer shall prepare a project specific Manufacturing and Inspection Plan (MIP) for FFDG’s approval. The MIP shall list the sequence of manufacturing steps, as well as the associated inspections:
- Visual inspections.
- Dimensional inspections.
- Leak checks.
- Magnetic permeability measurements.
- Assembly test of vacuum vessel, strongback and G11 posts.
The Manufacturer shall develop quality control procedures and tests to guarantee that the project will be in full conformance with the FFDG’s specifications. If during inspections a discrepancy occurs, the supplier shall generate a Discrepancy Report (DR) and obtain FFDG’s approval before proceeding to the subsequent step.
The magnetic permeability of Stainless-Steel components shall be measured when specified on drawings prior and after machining.
The Manufacturer shall maintain records of all inspections and tests in the form of Quality Reports (i.e., electronic travelers).
The Manufacturer shall provide documentation detailing the weld assurance program. Welding documentation shall be developed in accordance with related pressure vessel codes of 2021 ASME B&PV section VIII, Division I, and ASME section IX.
https://urldefense.proofpoint.com/v2/url?u=http-3A__www.jesa.com&d=DwMFAw&c=gRgGjJ3BkIsb5y6s49QqsA&r=duG-OVxCg2kpfBBBih-Xaw&m=_tWXMV19pvqekiobvO-M5vKDwwq4IM9rgv7-wKuyvjI&s=DWM4n60Ke4Le6wpHP2P2abigj2waK3c7JeWsOelHXFo&e=
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 20
The MIP and Welding Documentation shall be made available for FFDG’s reviews and approval by the
Manufacturing Readiness Review (MRR), as also indicated in Table 2.
3.13 Shipping Plan
The Manufacturer shall ship the vacuum vessel, with the strongback and support posts in place and properly locked, as in drawing F10243028. The Manufacturer shall ship the entire assembly properly packed, to ensure that damage is not incurred during shipment, in accordance with transportation industry standards. This shall include weather protection and the closure of all open pipes with test plugs or removable caps. Protective caps must be installed during shipping to help protect sealing surfaces.
Sizing shall be such that handling is facilitated and weight limitations imposed by the transportation industry can readily be met.
All deliverables including documentation shall be catalogued and offered for acceptance to FFDG by the
Shipping Readiness Review.
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 21
APPENDIX A: Technical datasheets of epoxy for vessel interior painting
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 22
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 23
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 24
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 25
APPENDIX B: Technical datasheets of High Emissivity Coating
Document Title: PIP-II production HB650 Cryomodule - Procurement and Fabrication Specification -
Fermi National Accelerator Laboratory 26
| 1 Scope |
| 2 Procurement Specification |
| 2.1 Bidding Phase |
| 2.2 Technical and Cost Evaluation Phase |
| 2.3 Execution Phase and Hold Points |
| 3 Fabrication Specification |
| 3.1 Introduction |
| 3.2 Materials |
| 3.3 Dimensional conformance |
| 3.4 Cleanliness |
| 3.5 Welding |
| 3.5.1 Vacuum vessel weldment |
| 3.5.2 Strongback module weldments |
| 3.6 Leak check |
| 3.7 Painting and Coating |
| 3.8 Serial number stamping |
| 3.9 Hardware |
| 3.10 Assembly |
| 3.10.1 Traction test of the G11 Support Posts |
| 3.10.2 Strongback assembly |
| 3.10.3 Strongback & G11 posts Insertion |
| 3.11 Common parts to be procured |
| 3.12 Quality controls |
| 3.13 Shipping Plan |
| APPENDIX A: Technical datasheets of epoxy for vessel interior painting |
| APPENDIX B: Technical datasheets of High Emissivity Coating |
File details come from the government source that posted it. Updated .