Exhibit A-E Supplies or Services and Prices - Ordering Periods 1-5.xlsx

XLSX spreadsheet 105 KB Posted

Attached to
COMMERCIAL INDUSTRIAL SERVICES (CIS) NON-SKID DECK COVERING FOLLOW-ON
Solicitation number
N5523620R0002
Issued by

About this file

This document outlines a federal solicitation for commercial industrial services for non-skid deck covering repairs. The solicitation seeks to provide non-skid deck covering repairs in accordance with the statement of work on a firm fixed price basis. The required services include removal of existing deck coverings, surface preparation, primer application, application of various types of non-skid deck covering systems, crane and rigging services, and additional labor and materials. The solicitation involves five potential ordering periods and sets estimated quantities and areas for different services each period. The Department of the Navy Naval Sea Systems Command is the issuing agency.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

SECTION B ELIN SUMMARY

ELIN 0001
EXHIBIT AOrdering Period 1 Total$10,400.00
ELIN 0002
EXHIBIT BOrdering Period 2 Total$10,400.00
ELIN 0003
EXHIBIT COrdering Period 3 Total$10,400.00
ELIN 0004
EXHIBIT DOrdering Period 4 Total$10,400.00
ELIN 0005
EXHIBIT EOrdering Period 5 Total$10,400.00
$52,000.00

Ordering Period 1

SECTION B: ELIN 0001
EXHIBIT A: Ordering Period One
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A001REMOVE EXISTING DECK COVERING TO SUBSTRATE, SURFACE PREPARATION, AND FIRST PRIMER COATING APPLICATION. Provide labor, services, equipment, and materials for the cleaning prior to removal, the removal of the existing deck covering system to substrate, and the subsequent surface preparation, cleaning, and first primer coating application in accordance with the requirements of the statement of work.

A001AA STEEL SHOT OR STEEL GRIT OR STAINLESS STEEL ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

A001AB GARNET OR WALNUT SHELLS OR ALUMINUM OXIDE OR CRUSHED GLASS ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

A001AC HIGH PRESSURE OR ULTRAHIGH PRESSURE WATERJETTING (HP WJ OR UHP WJ) CLEANING: Hydroblast cleaning to include the use of power tools and hand tools. 10,000 SF $0.00

A001AD POWER TOOLS CLEANING AND HAND TOOLS CLEANING: 100,000 SF $0.00

A001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A002APPLICATION OF A SECOND COAT OF PRIMER: Provide labor, services, equipment, and materials for the application of the second coat primer coating in accordance with the requirements of the statement of work.

A002AA APPLICATION OF THE SECOND COAT OF PRIMER 100,000 SF $0.00

A002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A003PRESSURIZED WATER CLEANING. Provide labor, services, equipment, and materials for the Pressurized Water Cleaning (WC) in accordance with the requirements of the statement of work.

A003AA High-Pressure Water Cleaning (HP WC). Pressurized water cleaning. 5,000 SF $0.00

A003AB Low Pressure Water Cleaning (LP WC). Pressurized water cleaning. 2,000 SF $0.00

A003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A004TYPE I COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A004AA TYPE I COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 12 months service life 50,000 SF $0.00

A004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A005TYPE I COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A005AA TYPE I COMP G, STEEL SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 25,000 SF $0.00

A005AB TYPE I COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 25,000 SF $0.00

A005AC TYPE I COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

A005AD TYPE I COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A005AE TYPE I COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 500 SF $0.00

A005AF TYPE I COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 25,000 SF $0.00

A005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A006TYPE I COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A006AA TYPE I COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

A006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A007TYPE II COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A007AA TYPE II COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

A007AB TYPE II COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

A007AC TYPE II COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 100 SF $0.00

A007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A008TYPE III COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A008AA TYPE III COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A008AB TYPE III COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A008AC TYPE III COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 1,000 SF $0.00

A008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A009TYPE V COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A009AA TYPE V COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 3 years service life 10,000 SF $0.00

A009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A010TYPE V COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A010AA TYPE V COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum3 years service life 30,000 SF $0.00

A010AB TYPE V COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 30,000 SF $0.00

A010AC TYPE V COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 5,000 SF $0.00

A010AD TYPE V COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 5,000 SF $0.00

A010AE TYPE V COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 40,000 SF $0.00

A010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A011TYPE V COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A011AA TYPE V COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 15,000 landings. 30,000 SF $0.00

A011 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A012TYPE VI COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A012AA TYPE VI COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum12 months service life 20,000 SF $0.00

A012AB TYPE VI COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 20,000 SF $0.00

A012AC TYPE VI COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

A012AD TYPE VI COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A012 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A013TYPE VI COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A013AA TYPE VI COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

A013 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A014TYPE VIII COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A014AA TYPE VIII COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum 12 months service life 20,000 SF $0.00

A014AB TYPE VIII COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 20,000 SF $0.00

A014AC TYPE VIII COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

A014AD TYPE VIII COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A014 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A015TYPE VIII COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A015AA TYPE VIII COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

A015 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A016TYPE XI COMP PS: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

A016AA TYPE XI COMP PS, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A016AB TYPE XI COMP PS, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

A016AC TYPE XI COMP PS, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 1,000 SF $0.00

A016AD TYPE XI COMP PS, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 10,000 SF $0.00

A016 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A017CRANE AND RIGGING SERVICES. Provide labor, services, equipment, and materials for the crane and rigging services required in support of the application of the complete Non-Skid deck covering system in accordance with the statement of work.

A017AA CRANE AND RIGGING SERVICES 200 HR $0.00

A017 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A018OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
A018AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.$200.00HR$0.00
A018ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN A018AB.$ 10,000.00Dollars, U.S0.00%$10,000.00

A018 ITEM NUMBER TOTAL $10,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
A019ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A018AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A018 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN A019).

A001 - A018 ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION $10,000.00

ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): $2,000.00

ADDITIONAL PERCENT FEE PROPOSED: 20% LOT $400.00

A019 ITEM NUMBER TOTAL 1 LOT $400.00

ELIN SUMMARY - BASE YEAR ONE

A001TOTAL$0.00
A002 TOTAL$0.00FINAL TOTAL
BASE YEAR ONE$10,400.00
A003 TOTAL$0.00
A004 TOTAL$0.00
A005 TOTAL$0.00
A006 TOTAL$0.00
A007 TOTAL$0.00
A008 TOTAL$0.00
A009 TOTAL$0.00
A010 TOTAL$0.00
A011 TOTAL$0.00
A012 TOTAL$0.00
A013 TOTAL$0.00
A014 TOTAL$0.00
A015 TOTAL$0.00
A016 TOTAL$0.00
A017 TOTAL$0.00
A018 TOTAL$10,000.00
A019 TOTAL$400.00

&P of &N

Ordering Period 2

SECTION B: ELIN 0002
EXHIBIT B: Ordering Period Two
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B001REMOVE EXISTING DECK COVERING TO SUBSTRATE, SURFACE PREPARATION, AND PRIMER COATING APPLICATION. Provide labor, services, equipment, and materials for the cleaning prior to removal, the removal of the existing deck covering system to substrate, and the subsequent surface preparation, cleaning, and first primer coating application in accordance with the requirements of the statement of work.

B001AA STEEL SHOT OR STEEL GRIT OR STAINLESS STEEL ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

B001AB GARNET OR WALNUT SHELLS OR ALUMINUM OXIDE OR CRUSHED GLASS ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

B001AC HIGH PRESSURE OR ULTRAHIGH PRESSURE WATERJETTING (HP WJ OR UHP WJ) CLEANING: Hydroblast cleaning to include the use of power tools and hand tools. 10,000 SF $0.00

B001AD POWER TOOLS CLEANING AND HAND TOOLS CLEANING: 100,000 SF $0.00

B001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B002APPLICATION OF A SECOND COAT OF PRIMER: Provide labor, services, equipment, and materials for the application of the second coat primer coating in accordance with the requirements of the statement of work.

B002AA APPLICATION OF THE SECOND COAT OF PRIMER 100,000 SF $0.00

B002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B003PRESSURIZED WATER CLEANING. Provide labor, services, equipment, and materials for the Pressurized Water Cleaning (WC) in accordance with the requirements of the statement of work.

B003AA High-Pressure Water Cleaning (HP WC). Pressurized water cleaning. 5,000 SF $0.00

B003AB Low Pressure Water Cleaning (LP WC). Pressurized water cleaning. 2,000 SF $0.00

B003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B004TYPE I COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B004AA TYPE I COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 12 months service life 50,000 SF $0.00

B004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B005TYPE I COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B005AA TYPE I COMP G, STEEL SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 25,000 SF $0.00

B005AB TYPE I COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 25,000 SF $0.00

B005AC TYPE I COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

B005AD TYPE I COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B005AE TYPE I COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 500 SF $0.00

B005AF TYPE I COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 25,000 SF $0.00

B005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B006TYPE I COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B006AA TYPE I COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

B006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B007TYPE II COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B007AA TYPE II COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

B007AB TYPE II COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

B007AC TYPE II COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 100 SF $0.00

B007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B008TYPE III COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B008AA TYPE III COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B008AB TYPE III COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B008AC TYPE III COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 1,000 SF $0.00

B008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B009TYPE V COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B009AA TYPE V COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 3 years service life 10,000 SF $0.00

B009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B010TYPE V COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B010AA TYPE V COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum3 years service life 30,000 SF $0.00

B010AB TYPE V COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 30,000 SF $0.00

B010AC TYPE V COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 5,000 SF $0.00

B010AD TYPE V COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 5,000 SF $0.00

B010AE TYPE V COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 40,000 SF $0.00

B010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B011TYPE V COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B011AA TYPE V COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 15,000 landings. 30,000 SF $0.00

B011 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B012TYPE VI COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B012AA TYPE VI COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum12 months service life 20,000 SF $0.00

B012AB TYPE VI COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 20,000 SF $0.00

B012AC TYPE VI COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

B012AD TYPE VI COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B012 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B013TYPE VI COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B013AA TYPE VI COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

B013 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B014TYPE VIII COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B014AA TYPE VIII COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum 12 months service life 20,000 SF $0.00

B014AB TYPE VIII COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 20,000 SF $0.00

B014AC TYPE VIII COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

B014AD TYPE VIII COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B014 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B015TYPE VIII COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B015AA TYPE VIII COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

B015 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B016TYPE XI COMP PS: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

B016AA TYPE XI COMP PS, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B016AB TYPE XI COMP PS, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

B016AC TYPE XI COMP PS, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 1,000 SF $0.00

B016AD TYPE XI COMP PS, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 10,000 SF $0.00

B016 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B017CRANE AND RIGGING SERVICES. Provide labor, services, equipment, and materials for the crane and rigging services required in support of the application of the complete Non-Skid deck covering system in accordance with the statement of work.

B017AA CRANE AND RIGGING SERVICES 200 HR $0.00

B017 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B018OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
B018AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.$200.00HR$0.00
B018ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN B018AB.$ 10,000.00Dollars, U.S0.00%$10,000.00

B018 ITEM NUMBER TOTAL $10,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
B019ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B018AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B018 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN B019).

B001 - B018 ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION $10,000.00

ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): $2,000.00

ADDITIONAL PERCENT FEE PROPOSED: 20% LOT $400.00

B019 ITEM NUMBER TOTAL 1 LOT $400.00

ELIN SUMMARY - BASE YEAR TWO

B001TOTAL$0.00
B002 TOTAL$0.00FINAL TOTAL
BASE YEAR TWO$10,400.00
B003 TOTAL$0.00
B004 TOTAL$0.00
B005 TOTAL$0.00
B006 TOTAL$0.00
B007 TOTAL$0.00
B008 TOTAL$0.00
B009 TOTAL$0.00
B010 TOTAL$0.00
B011 TOTAL$0.00
B012 TOTAL$0.00
B013 TOTAL$0.00
B014 TOTAL$0.00
B015 TOTAL$0.00
B016 TOTAL$0.00
B017 TOTAL$0.00
B018 TOTAL$10,000.00
B019 TOTAL$400.00

Ordering Period 3

SECTION B: ELIN 0003
EXHIBIT C: Ordering Period Three
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C001REMOVE EXISTING DECK COVERING TO SUBSTRATE, SURFACE PREPARATION, AND PRIMER COATING APPLICATION. Provide labor, services, equipment, and materials for the cleaning prior to removal, the removal of the existing deck covering system to substrate, and the subsequent surface preparation, cleaning, and first primer coating application in accordance with the requirements of the statement of work.

C001AA STEEL SHOT OR STEEL GRIT OR STAINLESS STEEL ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

C001AB GARNET OR WALNUT SHELLS OR ALUMINUM OXIDE OR CRUSHED GLASS ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

C001AC HIGH PRESSURE OR ULTRAHIGH PRESSURE WATERJETTING (HP WJ OR UHP WJ) CLEANING: Hydroblast cleaning to include the use of power tools and hand tools. 10,000 SF $0.00

C001AD POWER TOOLS CLEANING AND HAND TOOLS CLEANING: 100,000 SF $0.00

C001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C002APPLICATION OF A SECOND COAT OF PRIMER: Provide labor, services, equipment, and materials for the application of the second coat primer coating in accordance with the requirements of the statement of work.

C002AA APPLICATION OF THE SECOND COAT OF PRIMER 100,000 SF $0.00

C002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C003PRESSURIZED WATER CLEANING. Provide labor, services, equipment, and materials for the Pressurized Water Cleaning (WC) in accordance with the requirements of the statement of work.

C003AA High-Pressure Water Cleaning (HP WC). Pressurized water cleaning. 5,000 SF $0.00

C003AB Low Pressure Water Cleaning (LP WC). Pressurized water cleaning. 2,000 SF $0.00

C003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C004TYPE I COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C004AA TYPE I COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 12 months service life 50,000 SF $0.00

C004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C005TYPE I COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C005AA TYPE I COMP G, STEEL SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 25,000 SF $0.00

C005AB TYPE I COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 25,000 SF $0.00

C005AC TYPE I COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

C005AD TYPE I COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C005AE TYPE I COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 500 SF $0.00

C005AF TYPE I COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 25,000 SF $0.00

C005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C006TYPE I COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C006AA TYPE I COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

C006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C007TYPE II COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C007AA TYPE II COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

C007AB TYPE II COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

C007AC TYPE II COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 100 SF $0.00

C007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C008TYPE III COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C008AA TYPE III COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C008AB TYPE III COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C008AC TYPE III COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 1,000 SF $0.00

C008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C009TYPE V COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C009AA TYPE V COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 3 years service life 10,000 SF $0.00

C009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C010TYPE V COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C010AA TYPE V COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum3 years service life 30,000 SF $0.00

C010AB TYPE V COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 30,000 SF $0.00

C010AC TYPE V COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 5,000 SF $0.00

C010AD TYPE V COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 5,000 SF $0.00

C010AE TYPE V COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 40,000 SF $0.00

C010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C011TYPE V COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C011AA TYPE V COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 15,000 landings. 30,000 SF $0.00

C011 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C012TYPE VI COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C012AA TYPE VI COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum12 months service life 20,000 SF $0.00

C012AB TYPE VI COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 20,000 SF $0.00

C012AC TYPE VI COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

C012AD TYPE VI COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C012 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C013TYPE VI COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C013AA TYPE VI COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

C013 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C014TYPE VIII COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C014AA TYPE VIII COMP G, STEEL SURFACES: Hangar decks, flight decks, and vertical replenishment deck areas. Minimum 12 months service life 20,000 SF $0.00

C014AB TYPE VIII COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 20,000 SF $0.00

C014AC TYPE VIII COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

C014AD TYPE VIII COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C014 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C015TYPE VIII COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C015AA TYPE VIII COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

C015 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C016TYPE XI COMP PS: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

C016AA TYPE XI COMP PS, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C016AB TYPE XI COMP PS, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

C016AC TYPE XI COMP PS, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 1,000 SF $0.00

C016AD TYPE XI COMP PS, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 10,000 SF $0.00

C016 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C017CRANE AND RIGGING SERVICES. Provide labor, services, equipment, and materials for the crane and rigging services required in support of the application of the complete Non-Skid deck covering system in accordance with the statement of work.

C017AA CRANE AND RIGGING SERVICES 200 HR $0.00

C017 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
C018OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
C018AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.$200.00HR$0.00
C018ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate:________% to be applied to SubELIN C018AB.$ 10,000.00Dollars, U.S0.00%$10,000.00

C018 ITEM NUMBER TOTAL $10,000.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
C019ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items C001 through C018AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS C001 through C018 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN C019).

C001 - C018 ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION $10,000.00

ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): $2,000.00

ADDITIONAL PERCENT FEE PROPOSED: 20% LOT $400.00

C019 ITEM NUMBER TOTAL 1 LOT $400.00

ELIN SUMMARY - BASE YEAR THREE

C001TOTAL$0.00
C002 TOTAL$0.00FINAL TOTAL
BASE YEAR THREE$10,400.00
C003 TOTAL$0.00
C004 TOTAL$0.00
C005 TOTAL$0.00
C006 TOTAL$0.00
C007 TOTAL$0.00
C008 TOTAL$0.00
C009 TOTAL$0.00
C010 TOTAL$0.00
C011 TOTAL$0.00
C012 TOTAL$0.00
C013 TOTAL$0.00
C014 TOTAL$0.00
C015 TOTAL$0.00
C016 TOTAL$0.00
C017 TOTAL$0.00
C018 TOTAL$10,000.00
C019 TOTAL$400.00

Ordering Period 4

SECTION B: ELIN 0004
EXHIBIT D: Ordering Period Four
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D001REMOVE EXISTING DECK COVERING TO SUBSTRATE, SURFACE PREPARATION, AND PRIMER COATING APPLICATION. Provide labor, services, equipment, and materials for the cleaning prior to removal, the removal of the existing deck covering system to substrate, and the subsequent surface preparation, cleaning, and first primer coating application in accordance with the requirements of the statement of work.

D001AA STEEL SHOT OR STEEL GRIT OR STAINLESS STEEL ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

D001AB GARNET OR WALNUT SHELLS OR ALUMINUM OXIDE OR CRUSHED GLASS ABRASIVE BLAST MEDIA CLEANING: Centrifugal Blast cleaning to include the use of power tools and hand tools. 20,000 SF $0.00

D001AC HIGH PRESSURE OR ULTRAHIGH PRESSURE WATERJETTING (HP WJ OR UHP WJ) CLEANING: Hydroblast cleaning to include the use of power tools and hand tools. 10,000 SF $0.00

D001AD POWER TOOLS CLEANING AND HAND TOOLS CLEANING: 100,000 SF $0.00

D001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D002APPLICATION OF A SECOND COAT OF PRIMER: Provide labor, services, equipment, and materials for the application of the second coat primer coating in accordance with the requirements of the statement of work.

D002AA APPLICATION OF THE SECOND COAT OF PRIMER 100,000 SF $0.00

D002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D003PRESSURIZED WATER CLEANING. Provide labor, services, equipment, and materials for the Pressurized Water Cleaning (WC) in accordance with the requirements of the statement of work.

D003AA High-Pressure Water Cleaning (HP WC). Pressurized water cleaning. 5,000 SF $0.00

D003AB Low Pressure Water Cleaning (LP WC). Pressurized water cleaning. 2,000 SF $0.00

D003 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D004TYPE I COMP D: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

D004AA TYPE I COMP D: LHA, LHD, LPD, and LSD Flight Decks areas. Minimum 12 months service life 50,000 SF $0.00

D004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D005TYPE I COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

D005AA TYPE I COMP G, STEEL SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 25,000 SF $0.00

D005AB TYPE I COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 25,000 SF $0.00

D005AC TYPE I COMP G, ALUMINUM SURFACES: Hangar decks, flight decks, aircraft elevator platform decks, and vertical replenishment deck areas 10,000 SF $0.00

D005AD TYPE I COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 10,000 SF $0.00

D005AE TYPE I COMP G, GRP FIBERGLASS SURFACES: Exterior Walk Areas (All exterior deck areas) 500 SF $0.00

D005AF TYPE I COMP G, STEEL, ALUMINUM AND GRP FIBERGLASS SURFACES: All interior walk areas and interior compartment deck areas 25,000 SF $0.00

D005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D006TYPE I COMP L: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

D006AA TYPE I COMP L, STEEL SURFACES: CVN flight deck landing areas. Service Life minimum 10,000 landings. 10,000 SF $0.00

D006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
D007TYPE II COMP G: Provide labor, services, equipment, and materials for the application of a complete Non-Skid deck covering system in accordance with the requirements of the statement of work.

D007AA TYPE II COMP G, STEEL SURFACES: Exterior Walk Areas (All deck areas other than hangar deck, flight deck, and vertical replenishment deck areas) 1,000 SF $0.00

D007AB TYPE II COMP G, ALUMINUM SURFACES: Exterior Walk Areas (All deck areas other than…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .