Ordering Year 1

SECTION B: CLIN 0001
EXHIBIT A: ORDERING YEAR ONE
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A001EXTERIOR SPACES DECK PAINT COATING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A001AAALUMINUM SURFACES: EXTERIOR SPACES DECK AREAS1,000SF$0.00
A001ABSTEEL SURFACES: EXTERIOR SPACES DECK AREAS2,000SF$0.00
A001ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES DECK AREAS100SF$0.00
A001ADSECOND COAT OF PRIMER: EXTERIOR SPACES DECK AREAS500SF$0.00
A001ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A002EXTERIOR SPACES BULKHEAD COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior spaces bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A002AAALUMINUM SURFACES: EXTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
A002ABSTEEL SURFACES: EXTERIOR SPACES BULKHEAD AREAS2,000SF$0.00
A002ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES BULKHEAD AREAS100SF$0.00
A002ADSECOND COAT OF PRIMER: EXTERIOR SPACES BULKHEAD AREAS500SF$0.00
A002ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A003EXTERIOR SPACES OVERHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior spaces overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A003AAALUMINUM SURFACES: EXTERIOR SPACES OVERHEAD AREAS500SF$0.00
A003ABSTEEL SURFACES: EXTERIOR SPACES OVERHEAD AREAS1,000SF$0.00
A003ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES OVERHEAD AREAS100SF$0.00
A003ADSECOND COAT OF PRIMER: EXTERIOR SPACES OVERHEAD AREAS500SF$0.00
A003ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A004INTERIOR SPACES DECK PAINT COATING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A004AAALUMINUM SURFACES: INTERIOR SPACES DECK AREAS1,000SF$0.00
A004ABSTEEL SURFACES: INTERIOR SPACES DECK AREAS4,000SF$0.00
A004ACGRP FIBERGLASS SURFACES: INTERIOR SPACES DECK AREAS100SF$0.00
A004ADSECOND COAT OF PRIMER: INTERIOR SPACES DECK AREAS1,000SF$0.00
A004ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A005INTERIOR SPACES BULKHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICS. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A005AAALUMINUM SURFACES: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
A005ABSTEEL SURFACES: INTERIOR SPACES BULKHEAD AREAS4,000SF$0.00
A005ACGRP FIBERGLASS SURFACES: INTERIOR SPACES BULKHEAD AREAS100SF$0.00
A005ADINSULATION AND LAGGING: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
A005AESECOND COAT OF PRIMER: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
A005ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A006INTERIOR SPACES OVERHEAD PAINT COATING SYSTEM AINCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A006AAALUMINUM SURFACES: INTERIOR SPACES OVERHEAD AREAS500SF$0.00
A006ABSTEEL SURFACES: INTERIOR SPACES OVERHEAD AREAS2,000SF$0.00
A006ACGRP FIBERGLASS SURFACES: INTERIOR SPACES OVERHEAD AREAS100SF$0.00
A006ADINSULATION AND LAGGING: INTERIOR SPACES OVERHEAD AREAS500SF$0.00
A006AESECOND COAT OF PRIMER: INTERIOR SPACES OVERHEAD AREAS250SF$0.00
A006ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A007DECK PAINT COATING SYSTEM - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat, top coat and new deck covering system in accordance with the requirements of the statement of work.
A007AAALUMINUM SURFACES - DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS -250SF$0.00
A007ABSTEEL SURFACES - DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
A007ACALUMINUM SURFACES - DECK AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES ,AND TRUNKS250SF$0.00
A007ADSTEEL SURFACES - DECK AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS500SF$0.00
A007AESECOND COAT OF PRIMER: DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
A007ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A008BULKHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A008AAALUMINUM SURFACES - BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS250SF$0.00
A008ABSTEEL SURFACES - BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
A008ACALUMINUM SURFACES - BULKHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
A008ADSTEEL SURFACES - BULKHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS500SF$0.00
A008AEINSULATION AND LAGGING: BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
A008AFSECOND COAT OF PRIMER: BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
A008ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A009OVERHEAD AREAS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A009AAALUMINUM SURFACES- OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS250SF$0.00
A009ABSTEEL SURFACES - OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
A009ACALUMINUM SURFACES - OVERHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES AND TRUNKS250SF$0.00
A009ADSTEEL SURFACES - OVERHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES AND TRUNKS500SF$0.00
A009AEINSULATION AND LAGGING: OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
A009AFSECOND COAT OF PRIMER: OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
A009ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A010TRUNKS DECK, BULKHEAD, AND OVERHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing trunk deck, bulkhead, and overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A010AAALUMINUM SURFACES: ACCESS TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
A010ABSTEEL SURFACES: ACCESS TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
A010ACALUMINUM SURFACES: ESCAPE TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
A010ADSTEEL SURFACES: ESCAPE TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
A010AEALUMINUM SURFACES: ELEVATOR TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
A010AFSTEEL SURFACES: ELEVATOR TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
A010AGINSULATION AND LAGGING: ACCESS TRUNKS, ELEVATOR TRUNKDS ESCAPE TRUNKS - DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
A010AHSECOND COAT OF PRIMER: ACCESS TRUNKS, ELEVATOR TRUNKDS ESCAPE TRUNKS - DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
A010ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A011MAST AND/OR ANTENNA PLATFORMS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing mast and/or antenna platforms paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A011AADDG MAST AND ANTENNA PLATFORMS500SF$0.00
A011ABCG MAST AND ANTENNA PLATFORMS500SF$0.00
A011ACLPD AEM/S MAST COMPOSITE AND ANTENNA PLATFORMS500SF$0.00
A011ADLSD MAST AND ANTENNA PLATFORMS500SF$0.00
A011AELHA MAST AND ANTENNA PLATFORMS500SF$0.00
A011AFLHD MAST AND ANTENNA PLATFORMS500SF$0.00
A011AGLCS MAST AND ANTENNA PLATFORMS500SF$0.00
A011AHSECOND COAT OF PRIMER: MASTS AND ANTENNA PLATFORMS250SF$0.00
A011ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A012AFFF STATION PAINT COATING SYSTEM: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system tosubstrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A012AAALUMINUM SURFACES: AFFF STATION DECK AND COAMING TO INCLUDE EQUIPMENT FOUNDATION, TANK FOUNDATION, AND PIPING BRACKETS250SF$0.00
A012ABSTEEL SURFACES: AFFF STATION DECK AND COAMING TO INCLUDE EQUIPMENT FOUNDATION, TANK FOUNDATION, AND PIPING BRACKETS500SF$0.00
A012ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A013WET INTERIOR SPACES PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A013AAALUMINUM SURFACES: WET SPACES - WASH ROOMS, WATER CLOSETS, SHOWER STALLS, GALLEYS, SCULLERIES,250SF$0.00
A013ABSTEEL SURFACES: WET SPACES - WASH ROOMS, WATER CLOSETS, SHOWER STALLS, GALLEYS, SCULLERIES,500SF$0.00
A013ACSECOND COAT OF PRIMER: MASTS AND ANTENNA PLATFORMS250SF$0.00
A013ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A014FAN ROOMS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
A014AAALUMINUM SURFACES: FAN ROOMS DECK AREAS250SF$0.00
A014ABALUMINUM SURFACES: FAN ROOMS BULKHEAD AREAS250SF$0.00
A014ACALUMINUM SURFACES: FAN ROOMS OVERHEAD AREAS250SF$0.00
A014ADSTEEL SURFACES: FAN ROOMS DECK AREAS500SF$0.00
A014AESTEEL SURFACES: FAN ROOMS BULKHEAD AREAS500SF$0.00
A014AFSTEEL SURFACES: FAN ROOMS OVERHEAD AREAS500SF$0.00
A014AGINSULATION AND LAGGING: FAN ROOMS BULKHEAD AND OVERHEAD AREAS100SF$0.00
A014AHSECOND COAT OF PRIMER: FAN ROOMS DECKS, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
A014ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A015MOLD REMEDIATION. Provide labor services, equipment, materials, containment, and disposal for the accomplishment of the Mold Remediation requirements in accordance with the statement of work.
A015AAMOLD REMEDIATION100SF$0.00
A015AAMOLD REMEDIATION - PROCESSING, ROUTING, APPROVAL, AND COMPLETION OF PCP (PROCESS CONTROL PROCEDURE)10EA$0.00
A015ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A016POWDER COATING SYSTEM: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing powder coating system to substrate (if required), surface preparation, cleaning, and the application of the new powder coating system in accordance with the requirements of the statement of work.
A016AAPOWDER COATING - STEEL SURFACES500SF$0.00
A016ABPOWDER COATING - ALUMINUM SURFACES250SF$0.00
A016ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A017NON-SKID DECK COVERING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing Non-Skid deck covering system to substrate (if required), surface preparation, cleaning, and the application of primer coating and the new Non-Skid deck covering system in accordance with the requirements of the statement of work.
A017AATYPE I OR TYPE II OR TYPE III OR TYPE V COMP G, STEEL SURFACES: Interior and Exterior Walk Areas500SF$0.00
A017ABTYPE I OR TYPE II OR TYPE III OR TYPE V COMP G, ALUMINUM SURFACES: Interior and Exterior Walk Areas100SF$0.00
A017ACTYPE XI COMP PS, STEEL SURFACES: Interior and Exterior Walk Areas500SF$0.00
A017ADTYPE XI COMP PS, ALUMINUM SURFACES: Interior and Exterior Walk Areas100SF$0.00
A017ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A018OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
A018AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.200HR$0.00
A018ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate: ______% to be applied to SubELIN A018AB.10,000Dollars, U.S.0.00%$10,000.00
A018ITEM NUMBER TOTAL$10,000.00
ITEM NOSUPPLIES/SERVICES% PROPOSEDUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
A019ACCELERATED DELIVERY: It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A018AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A018 = $_________ (multiplied by) 10 percent = ________ (multiplied by percentage proposed for this ELIN) of ________% = _______ (total amount in the Item Number Total space provided for ELIN A019).
A001 - A018ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION$10,000.00
ANTICIPATED ACCELERATED DELIVERY TOTAL (10%):$1,000.00
ADDITIONAL PERCENT FEE PROPOSED:LOT$0.00
A019ITEM NUMBER TOTAL1LOT$0.00

ELIN SUMMARY - ORDERING YEAR ONE

A001TOTAL$0.00
A002 TOTAL$0.00FINAL TOTAL
ORDERING YEAR ONE$10,000.00
A003 TOTAL$0.00
A004 TOTAL$0.00
A005 TOTAL$0.00
A006 TOTAL$0.00
A007 TOTAL$0.00
A008 TOTAL$0.00
A009 TOTAL$0.00
A010 TOTAL$0.00
A011 TOTAL$0.00
A012 TOTAL$0.00
A013 TOTAL$0.00
A014 TOTAL$0.00
A015 TOTAL$0.00
A016 TOTAL$0.00
A017 TOTAL$0.00
A018 TOTAL$10,000.00
A019 TOTAL$0.00

&P of &N

Ordering Year 2

SECTION B: CLIN 0002
EXHIBIT B: ORDERING YEAR TWO
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B001EXTERIOR SPACES DECK PAINT COATING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B001AAALUMINUM SURFACES: EXTERIOR SPACES DECK AREAS1,000SF$0.00
B001ABSTEEL SURFACES: EXTERIOR SPACES DECK AREAS2,000SF$0.00
B001ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES DECK AREAS100SF$0.00
B001ADSECOND COAT OF PRIMER: EXTERIOR SPACES DECK AREAS500SF$0.00
B001ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B002EXTERIOR SPACES BULKHEAD COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior spaces bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B002AAALUMINUM SURFACES: EXTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
B002ABSTEEL SURFACES: EXTERIOR SPACES BULKHEAD AREAS2,000SF$0.00
B002ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES BULKHEAD AREAS100SF$0.00
B002ADSECOND COAT OF PRIMER: EXTERIOR SPACES BULKHEAD AREAS500SF$0.00
B002ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B003EXTERIOR SPACES OVERHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior spaces overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B003AAALUMINUM SURFACES: EXTERIOR SPACES OVERHEAD AREAS500SF$0.00
B003ABSTEEL SURFACES: EXTERIOR SPACES OVERHEAD AREAS1,000SF$0.00
B003ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES OVERHEAD AREAS100SF$0.00
B003ADSECOND COAT OF PRIMER: EXTERIOR SPACES OVERHEAD AREAS500SF$0.00
B003ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B004INTERIOR SPACES DECK PAINT COATING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B004AAALUMINUM SURFACES: INTERIOR SPACES DECK AREAS1,000SF$0.00
B004ABSTEEL SURFACES: INTERIOR SPACES DECK AREAS4,000SF$0.00
B004ACGRP FIBERGLASS SURFACES: INTERIOR SPACES DECK AREAS100SF$0.00
B004ADSECOND COAT OF PRIMER: INTERIOR SPACES DECK AREAS1,000SF$0.00
B004ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B005INTERIOR SPACES BULKHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICS. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B005AAALUMINUM SURFACES: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
B005ABSTEEL SURFACES: INTERIOR SPACES BULKHEAD AREAS4,000SF$0.00
B005ACGRP FIBERGLASS SURFACES: INTERIOR SPACES BULKHEAD AREAS100SF$0.00
B005ADINSULATION AND LAGGING: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
B005AESECOND COAT OF PRIMER: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
B005ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B006INTERIOR SPACES OVERHEAD PAINT COATING SYSTEM AINCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B006AAALUMINUM SURFACES: INTERIOR SPACES OVERHEAD AREAS500SF$0.00
B006ABSTEEL SURFACES: INTERIOR SPACES OVERHEAD AREAS2,000SF$0.00
B006ACGRP FIBERGLASS SURFACES: INTERIOR SPACES OVERHEAD AREAS100SF$0.00
B006ADINSULATION AND LAGGING: INTERIOR SPACES OVERHEAD AREAS500SF$0.00
B006AESECOND COAT OF PRIMER: INTERIOR SPACES OVERHEAD AREAS250SF$0.00
B006ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B007DECK PAINT COATING SYSTEM - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat, top coat and new deck covering system in accordance with the requirements of the statement of work.
B007AAALUMINUM SURFACES - DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS -250SF$0.00
B007ABSTEEL SURFACES - DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
B007ACALUMINUM SURFACES - DECK AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES ,AND TRUNKS250SF$0.00
B007ADSTEEL SURFACES - DECK AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS500SF$0.00
B007AESECOND COAT OF PRIMER: DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
B007ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B008BULKHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B008AAALUMINUM SURFACES - BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS250SF$0.00
B008ABSTEEL SURFACES - BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
B008ACALUMINUM SURFACES - BULKHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
B008ADSTEEL SURFACES - BULKHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS500SF$0.00
B008AEINSULATION AND LAGGING: BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
B008AFSECOND COAT OF PRIMER: BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
B008ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B009OVERHEAD AREAS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B009AAALUMINUM SURFACES- OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS250SF$0.00
B009ABSTEEL SURFACES - OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
B009ACALUMINUM SURFACES - OVERHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES AND TRUNKS250SF$0.00
B009ADSTEEL SURFACES - OVERHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES AND TRUNKS500SF$0.00
B009AEINSULATION AND LAGGING: OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
B009AFSECOND COAT OF PRIMER: OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
B009ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B010TRUNKS DECK, BULKHEAD, AND OVERHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing trunk deck, bulkhead, and overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B010AAALUMINUM SURFACES: ACCESS TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
B010ABSTEEL SURFACES: ACCESS TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
B010ACALUMINUM SURFACES: ESCAPE TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
B010ADSTEEL SURFACES: ESCAPE TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
B010AEALUMINUM SURFACES: ELEVATOR TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
B010AFSTEEL SURFACES: ELEVATOR TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
B010AGINSULATION AND LAGGING: ACCESS TRUNKS, ELEVATOR TRUNKDS ESCAPE TRUNKS - DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
B010AHSECOND COAT OF PRIMER: ACCESS TRUNKS, ELEVATOR TRUNKDS ESCAPE TRUNKS - DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
B010ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B011MAST AND/OR ANTENNA PLATFORMS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing mast and/or antenna platforms paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B011AADDG MAST AND ANTENNA PLATFORMS500SF$0.00
B011ABCG MAST AND ANTENNA PLATFORMS500SF$0.00
B011ACLPD AEM/S MAST COMPOSITE AND ANTENNA PLATFORMS500SF$0.00
B011ADLSD MAST AND ANTENNA PLATFORMS500SF$0.00
B011AELHA MAST AND ANTENNA PLATFORMS500SF$0.00
B011AFLHD MAST AND ANTENNA PLATFORMS500SF$0.00
B011AGLCS MAST AND ANTENNA PLATFORMS500SF$0.00
B011AHSECOND COAT OF PRIMER: MASTS AND ANTENNA PLATFORMS250SF$0.00
B011ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B012AFFF STATION PAINT COATING SYSTEM: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system tosubstrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B012AAALUMINUM SURFACES: AFFF STATION DECK AND COAMING TO INCLUDE EQUIPMENT FOUNDATION, TANK FOUNDATION, AND PIPING BRACKETS250SF$0.00
B012ABSTEEL SURFACES: AFFF STATION DECK AND COAMING TO INCLUDE EQUIPMENT FOUNDATION, TANK FOUNDATION, AND PIPING BRACKETS500SF$0.00
B012ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B013WET INTERIOR SPACES PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B013AAALUMINUM SURFACES: WET SPACES - WASH ROOMS, WATER CLOSETS, SHOWER STALLS, GALLEYS, SCULLERIES,250SF$0.00
B013ABSTEEL SURFACES: WET SPACES - WASH ROOMS, WATER CLOSETS, SHOWER STALLS, GALLEYS, SCULLERIES,500SF$0.00
B013ACSECOND COAT OF PRIMER: MASTS AND ANTENNA PLATFORMS250SF$0.00
B013ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B014FAN ROOMS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
B014AAALUMINUM SURFACES: FAN ROOMS DECK AREAS250SF$0.00
B014ABALUMINUM SURFACES: FAN ROOMS BULKHEAD AREAS250SF$0.00
B014ACALUMINUM SURFACES: FAN ROOMS OVERHEAD AREAS250SF$0.00
B014ADSTEEL SURFACES: FAN ROOMS DECK AREAS500SF$0.00
B014AESTEEL SURFACES: FAN ROOMS BULKHEAD AREAS500SF$0.00
B014AFSTEEL SURFACES: FAN ROOMS OVERHEAD AREAS500SF$0.00
B014AGINSULATION AND LAGGING: FAN ROOMS BULKHEAD AND OVERHEAD AREAS100SF$0.00
B014AHSECOND COAT OF PRIMER: FAN ROOMS DECKS, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
B014ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B015MOLD REMEDIATION. Provide labor services, equipment, materials, containment, and disposal for the accomplishment of the Mold Remediation requirements in accordance with the statement of work.
B015AAMOLD REMEDIATION100SF$0.00
B015AAMOLD REMEDIATION - PROCESSING, ROUTING, APPROVAL, AND COMPLETION OF PCP (PROCESS CONTROL PROCEDURE)10EA$0.00
B015ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B016POWDER COATING SYSTEM: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing powder coating system to substrate (if required), surface preparation, cleaning, and the application of the new powder coating system in accordance with the requirements of the statement of work.
B016AAPOWDER COATING - STEEL SURFACES500SF$0.00
B016ABPOWDER COATING - ALUMINUM SURFACES250SF$0.00
B016ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B017NON-SKID DECK COVERING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing Non-Skid deck covering system to substrate (if required), surface preparation, cleaning, and the application of primer coating and the new Non-Skid deck covering system in accordance with the requirements of the statement of work.
B017AATYPE I OR TYPE II OR TYPE III OR TYPE V COMP G, STEEL SURFACES: Interior and Exterior Walk Areas500SF$0.00
B017ABTYPE I OR TYPE II OR TYPE III OR TYPE V COMP G, ALUMINUM SURFACES: Interior and Exterior Walk Areas100SF$0.00
B017ACTYPE XI COMP PS, STEEL SURFACES: Interior and Exterior Walk Areas500SF$0.00
B017ADTYPE XI COMP PS, ALUMINUM SURFACES: Interior and Exterior Walk Areas100SF$0.00
B017ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B018OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the Delivery Order or the modification to an issued Delivery Order.
B018AAADDITIONAL WORK - LABOR
NOTE: The offeror’s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.200HR$0.00
B018ABADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. Offeror shall propose a material handling burdened rate: ______% to be applied to SubELIN B018AB..10,000Dollars, U.S.0.00%$10,000.00
B018ITEM NUMBER TOTAL$10,000.00
ITEM NOSUPPLIES/SERVICES% PROPOSEDUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
B019ACCELERATED DELIVERY: It is anticipated that 10 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B018AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B018 = $_____________ (multiplied by) 10 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN B019).
B001 - B018ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION$10,000.00
ANTICIPATED ACCELERATED DELIVERY TOTAL (10%):$1,000.00
ADDITIONAL PERCENT FEE PROPOSED:LOT$0.00
B019ITEM NUMBER TOTAL1LOT$0.00

ELIN SUMMARY - ORDERING YEAR TWO

B001TOTAL$0.00
B002 TOTAL$0.00FINAL TOTAL
ORDERING YEAR TWO$10,000.00
B003 TOTAL$0.00
B004 TOTAL$0.00
B005 TOTAL$0.00
B006 TOTAL$0.00
B007 TOTAL$0.00
B008 TOTAL$0.00
B009 TOTAL$0.00
B010 TOTAL$0.00
B011 TOTAL$0.00
B012 TOTAL$0.00
B013 TOTAL$0.00
B014 TOTAL$0.00
B015 TOTAL$0.00
B016 TOTAL$0.00
B017 TOTAL$0.00
B018 TOTAL$10,000.00
B019 TOTAL$0.00

Ordering Year 3

SECTION B: CLIN 0003
EXHIBIT C: ORDERING YEAR THREE
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C001EXTERIOR SPACES DECK PAINT COATING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C001AAALUMINUM SURFACES: EXTERIOR SPACES DECK AREAS1,000SF$0.00
C001ABSTEEL SURFACES: EXTERIOR SPACES DECK AREAS2,000SF$0.00
C001ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES DECK AREAS100SF$0.00
C001ADSECOND COAT OF PRIMER: EXTERIOR SPACES DECK AREAS500SF$0.00
C001ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C002EXTERIOR SPACES BULKHEAD COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior spaces bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C002AAALUMINUM SURFACES: EXTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
C002ABSTEEL SURFACES: EXTERIOR SPACES BULKHEAD AREAS2,000SF$0.00
C002ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES BULKHEAD AREAS100SF$0.00
C002ADSECOND COAT OF PRIMER: EXTERIOR SPACES BULKHEAD AREAS500SF$0.00
C002ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C003EXTERIOR SPACES OVERHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing exterior spaces overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C003AAALUMINUM SURFACES: EXTERIOR SPACES OVERHEAD AREAS500SF$0.00
C003ABSTEEL SURFACES: EXTERIOR SPACES OVERHEAD AREAS1,000SF$0.00
C003ACGRP FIBERGLASS SURFACES: EXTERIOR SPACES OVERHEAD AREAS100SF$0.00
C003ADSECOND COAT OF PRIMER: EXTERIOR SPACES OVERHEAD AREAS500SF$0.00
C003ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C004INTERIOR SPACES DECK PAINT COATING SYSTEM. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C004AAALUMINUM SURFACES: INTERIOR SPACES DECK AREAS1,000SF$0.00
C004ABSTEEL SURFACES: INTERIOR SPACES DECK AREAS4,000SF$0.00
C004ACGRP FIBERGLASS SURFACES: INTERIOR SPACES DECK AREAS100SF$0.00
C004ADSECOND COAT OF PRIMER: INTERIOR SPACES DECK AREAS1,000SF$0.00
C004ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C005INTERIOR SPACES BULKHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICS. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C005AAALUMINUM SURFACES: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
C005ABSTEEL SURFACES: INTERIOR SPACES BULKHEAD AREAS4,000SF$0.00
C005ACGRP FIBERGLASS SURFACES: INTERIOR SPACES BULKHEAD AREAS100SF$0.00
C005ADINSULATION AND LAGGING: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
C005AESECOND COAT OF PRIMER: INTERIOR SPACES BULKHEAD AREAS1,000SF$0.00
C005ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C006INTERIOR SPACES OVERHEAD PAINT COATING SYSTEM AINCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C006AAALUMINUM SURFACES: INTERIOR SPACES OVERHEAD AREAS500SF$0.00
C006ABSTEEL SURFACES: INTERIOR SPACES OVERHEAD AREAS2,000SF$0.00
C006ACGRP FIBERGLASS SURFACES: INTERIOR SPACES OVERHEAD AREAS100SF$0.00
C006ADINSULATION AND LAGGING: INTERIOR SPACES OVERHEAD AREAS500SF$0.00
C006AESECOND COAT OF PRIMER: INTERIOR SPACES OVERHEAD AREAS250SF$0.00
C006ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C007DECK PAINT COATING SYSTEM - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing deck paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat, top coat and new deck covering system in accordance with the requirements of the statement of work.
C007AAALUMINUM SURFACES - DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS -250SF$0.00
C007ABSTEEL SURFACES - DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
C007ACALUMINUM SURFACES - DECK AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES ,AND TRUNKS250SF$0.00
C007ADSTEEL SURFACES - DECK AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS500SF$0.00
C007AESECOND COAT OF PRIMER: DECK AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
C007ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C008BULKHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing bulkhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C008AAALUMINUM SURFACES - BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS250SF$0.00
C008ABSTEEL SURFACES - BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
C008ACALUMINUM SURFACES - BULKHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
C008ADSTEEL SURFACES - BULKHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS500SF$0.00
C008AEINSULATION AND LAGGING: BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
C008AFSECOND COAT OF PRIMER: BULKHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
C008ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C009OVERHEAD AREAS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES - CRITICAL COATED AREAS: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C009AAALUMINUM SURFACES- OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS250SF$0.00
C009ABSTEEL SURFACES - OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES/EXHAUST TRUNKS500SF$0.00
C009ACALUMINUM SURFACES - OVERHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES AND TRUNKS250SF$0.00
C009ADSTEEL SURFACES - OVERHEAD AREAS: MIXING ROOMS, EXHAUST UPTAKE SPACES AND TRUNKS500SF$0.00
C009AEINSULATION AND LAGGING: OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
C009AFSECOND COAT OF PRIMER: OVERHEAD AREAS: DIRTY SIDE OF COMBUSTION AIR INTAKES TRUNKS, MIXING ROOMS, EXHAUST UPTAKE SPACES, AND TRUNKS250SF$0.00
C009ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C010TRUNKS DECK, BULKHEAD, AND OVERHEAD PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing trunk deck, bulkhead, and overhead paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C010AAALUMINUM SURFACES: ACCESS TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
C010ABSTEEL SURFACES: ACCESS TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
C010ACALUMINUM SURFACES: ESCAPE TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
C010ADSTEEL SURFACES: ESCAPE TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
C010AEALUMINUM SURFACES: ELEVATOR TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
C010AFSTEEL SURFACES: ELEVATOR TRUNKS DECK, BULKHEAD, AND OVERHEAD AREAS500SF$0.00
C010AGINSULATION AND LAGGING: ACCESS TRUNKS, ELEVATOR TRUNKDS ESCAPE TRUNKS - DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
C010AHSECOND COAT OF PRIMER: ACCESS TRUNKS, ELEVATOR TRUNKDS ESCAPE TRUNKS - DECK, BULKHEAD, AND OVERHEAD AREAS250SF$0.00
C010ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C011MAST AND/OR ANTENNA PLATFORMS PAINT COATING SYSTEM INCLUDING SCAFFOLDING SERVICES. Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing mast and/or antenna platforms paint coating system to substrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.
C011AADDG MAST AND ANTENNA PLATFORMS500SF$0.00
C011ABCG MAST AND ANTENNA PLATFORMS500SF$0.00
C011ACLPD AEM/S MAST COMPOSITE AND ANTENNA PLATFORMS500SF$0.00
C011ADLSD MAST AND ANTENNA PLATFORMS500SF$0.00
C011AELHA MAST AND ANTENNA PLATFORMS500SF$0.00
C011AFLHD MAST AND ANTENNA PLATFORMS500SF$0.00
C011AGLCS MAST AND ANTENNA PLATFORMS500SF$0.00
C011AHSECOND COAT OF PRIMER: MASTS AND ANTENNA PLATFORMS250SF$0.00
C011ITEM NUMBER TOTAL$0.00
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNIT OF ISSUE (U/I)ESTIMATED PRICE PER U/IAMOUNT
C012AFFF STATION PAINT COATING SYSTEM: Provide labor, services, containment, equipment, and materials for the cleaning prior to removal, the removal of the existing paint coating system tosubstrate (if required), surface preparation, cleaning, and the application of the primer coat and top coat in accordance with the requirements of the statement of work.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .