Exhibit A DRAFT CDRLS.pdf

PDF 1 MB Posted

Attached to
F-5N/F CLS and Aircraft Maintenance Program Federal contract opportunity
Solicitation number
N00421-22-R-0006
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

View the file

Other files for this federal contract opportunity

Other files attached to F-5N/F CLS and Aircraft Maintenance Program, newest first.
File Type Posted
Attachment 2-DRAFT QASP.pdf PDF
Attachment 1- DRAFT F-5 CLS Follow-on PWS 11.17.21.pdf PDF
Attachment 3- DRAFT BID DD254.pdf PDF
DRAFT N00421-22-R-0006 F-5 CLS RFP A-K 11-15-2021.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Daily Aircraft Readiness Status Report Daily Aircraft Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368A (SEE BLOCK 16) PWS PARA. 5.7 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF F RST SUBMISSION 14. DISTRIBUTION

ELECTRONICALLY

NO C (SEE

BLOCK 16)

DAILY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The first deliverable shall be submitted on the contract start date (after transition-in period) at 0830 hrs.

Block 13: The Contractor shall submit the report daily by 0830 hrs.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

PMA-226 1

SEE BLOCK 16

15. TOTAL 2

G. PREPARED BY H. DATE I. APPROVED BY : J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DRAFT

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Monthly Maintenance Plan Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

OT-19-20070 (SEE BLOCK 16) PWS PARA. 5.6 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (see Block 16)

N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 8: Each months plan will be approved by the COR via e-mail or letter.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall submit the deliverable five (5) CALENDAR days prior to the Transition In period completion and will include all sites.

Block 13: The Contractor shall submit the subsequent deliverable from each site on the 25th day of each month.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Web Based Information System Archived Data WIS Archived Data

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81946 (SEE BLOCK 16) PWS PARA. 6.7 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

1 TIME SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A 0 N/A Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall deliver with completion of the contract.

Block 14: Compile all data on CD-ROM(s) or DVDs and deliver to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Maintenance Data Collection Record (MDCR) 3-M System Data Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-82003 (SEE BLOCK 16) PWS PARA. 5.8.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY 45 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 13: The Contractor shall submit each subsequent report on the 15th of each month.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 Support Equipment Deficiency Report Status of Government Furnished Equipment (GFE) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80269 (SEE BLOCK 16) PWS PARA. 5.8.3 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY 45 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 13: The Contractor shall submit each subsequent report on the 15th of each month.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006 Contract Funds Status Report Contract Funds Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81468 (SEE BLOCK 16) PWS PARA. 4.1.1.1.2, 4.3, 5.11.3,

6.5, 7.3

PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (See Block 16)

SEE BLOCK 16 SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 8: The COR will provide comments if any within five (5) WORKING days of receipt. Revisions are due five (5) WORKING days after receipt of COR comments.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 13: The Contractor shall submit each subsequent deliverable on the 15th of each month.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 Government Property Inventory Report GOVERNMENT FURNISHED

PROPERTY (GFP) DATA UPDATE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80441D (SEE BLOCK 16) PWS PARA. 6.3.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

1 TIME 45 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (see block 16)

SEE BLOCK 16 SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file. Use of other electronic file formats will be rejected.

Block 8: The Government has thirty (30) working days to review and approve. The Contractor has thirty (30) working days to incorporate changes or comments and provide final deliverable. The COR will accept/approve via email.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019. Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 13: The Contractor shall deliver subsequent deliverables as updates to the GFP Inventory Report.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008 Government Furnished Property Inventory and Forecasting Report

Government Furnished Property Inventory and Forecasting Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81947B PWS PARA. 6.3.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

NO SEE BLOCK

SEE BLOCK 16 45 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (see block 16)

N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file. Use of other electronic file formats will be rejected.

Block 8: The Government will provide comments within ten (10) WORKING days of receipt of draft. Revisions are due five (5) WORKING days after receipt of government comments. The subsequent changes must be approved by the COR via Email.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019. Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 10: The Contractor shall submit the deliverable semi-annually (MARCH) and (SEPTEMBER) of each year for each site.

Block 12: The Contractor shall submit the report with forty-five (45) CALENDAR days of Contract Award. The Government has thirty (30) WORKING days to review and approve.

The contractor has thirty (30) WORKING days to incorporate and comments and provide the final deliverable.

Block 13: The Contractor shall submit the deliverable semi-annual (MARCH) and (SEPTEMBER) of each year or upon request.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009 Material Utilization and Forecasting Report GFM Inventory Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81947B (SEE BLOCK 16) PWS PARA. 6.3.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A (see block 16)

N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file. Use of other electronic file formats will be rejected.

Block 8: The COR will review and provide comments if any and accept/approve via email.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019. Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall submit the report within forty-five (45) CALENDAR days after Contract Award. The Contractor shall submit the final deliverable within thirty (30) WORKING days after receipt of any Government comments.

Block 13: The Contractor shall submit each subsequent deliverable within forty-five (45) CALENDAR days after each contract option year is exercised. The Contractor shall submit the final deliverable within thirty (30) WORKING days after receipt of any Government comments.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010 Government Furnished Property Inventory and Forecasting Report

Government Property Inventory Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80441D (SEE BLOCK 16) PWS PARA. 6.3.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

C (SEE

BLOCK 16)

ANNLY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final see block

N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file. Use of other electronic file formats will be rejected.

Block 8: The Government will provide comments within ten (10) WORKING days of receipt of draft. Revisions are due five (5) WORKING days after receipt of government comments. The subsequent changes must be approved by the COR via Email.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 10: The Contractor shall submit the deliverable ANNUALLY (SEPTEMBER) of each year.

Block 12: The Contractor shall submit the report within forty-five (45) CALENDAR days of contract award. The Government has thirty (30) WORKING days to review and approve. The contractor has thirty (30) WORKING days to incorporate and comments and provide the final deliverable.

Block 13: The Contractor shall submit the deliverable ANNUALLY (SEPTEMBER) of each year.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011 PSE Calibration and Maintenance Report Government Furnished Equipment Repair Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ILSS-80620 (SEE BLOCK 16) PWS PARA. 5.8.6 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall submit the first deliverable forty-five (45) CALENDAR days after the completion of the Phase-In Transition period.

Block 13: Subsequent submissions shall be delivered on the 15th of each month.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012 Accident/Incident Report Safety Related Events Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SAFT-81563 (SEE BLOCK 16) PWS PARA. 5.8.7 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY (SEE

BLOCK 16)

SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 10: Deliverables shall be submitted within 24 hours of occurrence for accidents and incidents via email.

Block 12: Deliverables shall be submitted within 24 hours of occurrence for accidents and incidents via email.

Block 13: Deliverables shall be submitted monthly upon occurrence for accidents and incidents.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD) and the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013 System Safety Program Plan Safety Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SAFT-81626 (SEE BLOCK 16) PWS PARA. 6.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

1 TIME 30 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (SEE

BLOCK

16)

N/A N/A Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 8: The Government will provide comments if required and approve. The Government has thirty (30) WORKING days to review and approve. The Contractor shall have thirty (30) WORKING days to incorporate any comments and provide final deliverable for Government approval.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014 Direct Parts and Material Monthly Status Report Contract Government Furnished Material (GFM) Monthly Requisition and Inventory Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-82128A (SEE BLOCK 16) PWS PARA. 4.1.1.1.2 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

MTHLY 45 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 13: The Contractor shall deliver subsequent deliverables on the 15th of every month.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A015 Phase Out Transition Plan Phase Out Transition Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81945 (SEE BLOCK 16) PWS PARA. 5.1.5.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

1 TIME 15 DACA SEE BLOCK

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (SEE

BLK 16)

N/A N/A Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 8: The Government has fifteen (15) WORKING days to review and accept/approve via email. The Contractor has fifteen (15) WORKING days to incorporate changes or comments and provide the final deliverable.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall submit the deliverable within fifteen (15) CALENDAR days from PCO notification.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A016

Engine Daily Status Report Engine Daily Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80368A PWS PARA. 5.2.3.f PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

DAILY SEE BLOCK 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The first deliverable shall be submitted on the contract start date (after transition-in period) at 0830 hrs.

Block 13: The Contractor shall submit the report daily by 0830 hrs.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A017 Phase-In Transition Plan Phase-In Transition Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-82299 (SEE BLOCK 16) PWS PARA. 5.1.1 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

1 TIME 15 DACA b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

A (See Block 16)

N/A SEE BLOCK 16 Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file.

Use of other electronic file formats will be rejected.

Block 8: The COR and the PMA-226 IPTL will review and provide comments if any via Email. The Contractor has five (5) working days to incorporate changes or comments and provide final deliverable.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors administrative or operational use; 29 April 2019.

Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall submit the deliverable within fifteen (15) days of contract award.

Block 13: During the phase-in transition period, the Contractor shall conduct a weekly status review during weekly telephone conference calls (day of week to be directed by the COR) with the Program Office until discontinuance directed by the COR.

Block 14: Distribution shall be via Email. Email notification shall be delivered to the COR (TBD), the PMA-226 IPT Leads (TBD).

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0X21 A TDP _______ TM ________ OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

F-5N/F CLS N00421-22-R-0006 TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A018 Phase-In Inventory Report Government Furnished Property Inventory and Forecasting Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81947B (SEE BLOCK 16) PWS PARA. 5.1.1.4 PMA-226

7. DD 250 REQ 9. DIST STATEMENT

BLOCK 16)

1 TIME 45 DACA SEE BLOCK

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Final

N/A (see block 16)

N/A N/A Draft Reg. Repro

16. REMARKS COR 1

Block 4: Deliverable shall be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government. Forms, letters, and signed documents shall be in fully searchable Portable Document Format (.pdf) file. Use of other electronic file formats will be rejected.

Block 8: The COR will review and provide comments if any and accept/approve via email.

Block 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their Contractor’s administrative or operational use; 29 April 2019. Other requests for this document shall be referred to the Specialized And Proven Aircraft Program Office, PMA-226, Building 298 Second Floor East Wing, E Street, Cherry Point, NC 28533. Data deliverables are not proprietary and shall not be marked proprietary.

Block 12: The Contractor shall submit the report within forty-five (45) CALENDAR days after Contract Award.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .