Exhibit A.pdf
PDF 2 MB Posted
- Attached to
- F-35 Wind Tunnel (WT) Model Finite Element Modeling (FEM) and Technical Support Federal contract opportunity
- Solicitation number
- FA2487-22-S-C035
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Eglin CSO (FA2487-22-S-C035) (V5).pdf | ||
| Eglin CSO (FA2487-22-S-C035) (V4).pdf | ||
| Eglin CSO (FA2487-22-S-C035) (V3).pdf | ||
| Eglin CSO (FA2487-22-S-C035) (V2).pdf | ||
| Eglin CSO (FA2487-22-S-C035) (V1).pdf | ||
| Attch 3 - SOW Prep Instructions.pdf | ||
| Attch 2 - Section K.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A001 Conference Agenda N/A
DI-ADMN-81249B SOW Para 3.5.7 & 3.6 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE BLK 16
SEE BLK 16
96 SK/SKPS 1
0 1 0
BLK 4. TAILORING IF REQUIRED, SHALL BE SPECIFIED FOR EACH INDIVIDUAL
TASK ORDER.
BLKS 10, 12 & 13 DELIVER NLT 1 WEEK PRIOR TO EACH REVIEW, AUDIT,
DEMONSTRATION, TEST OR MEETING.
BLK 15. DELIVERY ORDER DEPENDENT.
1 7 Adobe Professional 8.0
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A002 Conference Minutes N/A
DI-ADMN-81250B SOW Para 3.5.7 & 3.6 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE BLK 16
SEE BLK 16
96 SK/SKPS 1
0 1 0
BLKS 8, 10, 12 & 13 DELIVER NLT 10 DAYS AFTER EACH REVIEW.
GOVERNMENT COMMENTS WILL BE PROVIDEDWITHIN 20 DAYS AFTER
RECEIPT OF DRAFT. DELIVER FINAL NLT 15 DAYS AFTER RECEIPT OF
GOVERNMENT COMMENTS AND APPROVAL. DELIVER ELECTRONICALLY IN
MICROSOFT OR ADOBE COMPATIBLE FORMAT.
BLK 15. DELIVERY ORDER DEPENDENT.
2 7
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A003 Presentation Materials N/A
DI-ADMN-81373 SOW Para 3.5.7 & 3.6 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE 16
SEE 16
96 SK/SKPS 1
0 1 0
BLKS 8, 10, 12 & 13. DELIVER 1 WEEK PRIOR TO SCHEDULED REVIEW OR
MEETING ELECTRONIC FORMAT IS ACCEPTABLE AND MUST BE MICROSOFT
OR ADOBE COMPATIBLE.
BLK 15. DELIVERY ORDER DEPENDENT.
3 7
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A004 Status Report N/A
DI-MGMT-80368A SOW Para 3.6 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE 16
SEE 16
96 SK/SKPS 1
0 1 0
BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1.
BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS
SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.
BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED
MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE
DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.
4 7
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A005 Technical Report - Study/Services Interim Structural Analysis
DI-MISC-80508B SOW Para 3.0 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE 16
SEE 16
96 SK/SKPS 1
0 1 0
BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1.
BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS
SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.
BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED
MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE
DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.
5 7
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A006 Technical Data Report SUB-COMPONENTS DESIGN
RECOMMENDATIONS
DI-MGT-82165 SOW Para 3.0 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE 16
SEE 16
96 SK/SKPS 1
0 1 0
BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1.
BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS
SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.
BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED
MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE
DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.
6 7
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0002 A X
F-35 Wind Tunnel Model TBD TBD
A007 Technical Data Report Final Structural Substantiation report
DI-MGT-82165 SOW Para 3.0 96 SK/SKPS
LT
A D
ASREQ
N/A
SEE 16
SEE 16
96 SK/SKPS 1
0 1 0
BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1. DELIVER
ONE (1) MONTH PRIOR TO CONTRACT CONCLUSION TO ALLOW TIME TO
ADDRESS GOVERNMENT QUESTIONS OR FEEDBACK.
BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS
SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.
BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED
MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE
DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.
7 7
| CDRL A001 UL |
| CDRL A002 UL |
| CDRL A003 UL |
| CDRL A004 UL |
| CDRL A005_v2 UL |
| CDRL A006_v2 UL |
| CDRL A007_v2 UL |
File details come from the government source that posted it. Updated .