View the file

Other files for this federal contract opportunity

Other files attached to F-35 Wind Tunnel (WT) Model Finite Element Modeling (FEM) and Technical Support, newest first.
File Type Posted
Eglin CSO (FA2487-22-S-C035) (V5).pdf PDF
Eglin CSO (FA2487-22-S-C035) (V4).pdf PDF
Eglin CSO (FA2487-22-S-C035) (V3).pdf PDF
Eglin CSO (FA2487-22-S-C035) (V2).pdf PDF
Eglin CSO (FA2487-22-S-C035) (V1).pdf PDF
Attch 3 - SOW Prep Instructions.pdf PDF
Attch 2 - Section K.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A001 Conference Agenda N/A

DI-ADMN-81249B SOW Para 3.5.7 & 3.6 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE BLK 16

SEE BLK 16

96 SK/SKPS 1

0 1 0

BLK 4. TAILORING IF REQUIRED, SHALL BE SPECIFIED FOR EACH INDIVIDUAL

TASK ORDER.

BLKS 10, 12 & 13 DELIVER NLT 1 WEEK PRIOR TO EACH REVIEW, AUDIT,

DEMONSTRATION, TEST OR MEETING.

BLK 15. DELIVERY ORDER DEPENDENT.

1 7 Adobe Professional 8.0

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A002 Conference Minutes N/A

DI-ADMN-81250B SOW Para 3.5.7 & 3.6 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE BLK 16

SEE BLK 16

96 SK/SKPS 1

0 1 0

BLKS 8, 10, 12 & 13 DELIVER NLT 10 DAYS AFTER EACH REVIEW.

GOVERNMENT COMMENTS WILL BE PROVIDEDWITHIN 20 DAYS AFTER

RECEIPT OF DRAFT. DELIVER FINAL NLT 15 DAYS AFTER RECEIPT OF

GOVERNMENT COMMENTS AND APPROVAL. DELIVER ELECTRONICALLY IN

MICROSOFT OR ADOBE COMPATIBLE FORMAT.

BLK 15. DELIVERY ORDER DEPENDENT.

2 7

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A003 Presentation Materials N/A

DI-ADMN-81373 SOW Para 3.5.7 & 3.6 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE 16

SEE 16

96 SK/SKPS 1

0 1 0

BLKS 8, 10, 12 & 13. DELIVER 1 WEEK PRIOR TO SCHEDULED REVIEW OR

MEETING ELECTRONIC FORMAT IS ACCEPTABLE AND MUST BE MICROSOFT

OR ADOBE COMPATIBLE.

BLK 15. DELIVERY ORDER DEPENDENT.

3 7

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A004 Status Report N/A

DI-MGMT-80368A SOW Para 3.6 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE 16

SEE 16

96 SK/SKPS 1

0 1 0

BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1.

BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS

SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.

BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED

MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE

DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.

4 7

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A005 Technical Report - Study/Services Interim Structural Analysis

DI-MISC-80508B SOW Para 3.0 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE 16

SEE 16

96 SK/SKPS 1

0 1 0

BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1.

BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS

SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.

BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED

MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE

DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.

5 7

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A006 Technical Data Report SUB-COMPONENTS DESIGN

RECOMMENDATIONS

DI-MGT-82165 SOW Para 3.0 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE 16

SEE 16

96 SK/SKPS 1

0 1 0

BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1.

BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS

SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.

BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED

MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE

DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.

6 7

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

0002 A X

F-35 Wind Tunnel Model TBD TBD

A007 Technical Data Report Final Structural Substantiation report

DI-MGT-82165 SOW Para 3.0 96 SK/SKPS

LT

A D

ASREQ

N/A

SEE 16

SEE 16

96 SK/SKPS 1

0 1 0

BLK 4. DOCUMENT SHALL BE DELIVERED IAW DD FORM 1423-1. DELIVER

ONE (1) MONTH PRIOR TO CONTRACT CONCLUSION TO ALLOW TIME TO

ADDRESS GOVERNMENT QUESTIONS OR FEEDBACK.

BLKS 8, 10, 12 & 13. DELIVERY TIMES AND FREQUENCY SHALL BE AS

SPECIFIED IN EACH INDIVIDUAL DELIVERY ORDER.

BLKS 14 & 15. DELIVER ONE (1) ELECTRONIC COPY TO THE DESIGNATED

MICROSOFT TEAMS CHANNEL (PREFERRED) OR VIA DOD SAFE TO THE

DESIGNATED AFSEO POC TO BE PROVIDED UPON CONTRACT AWARD.

7 7

CDRL A001 UL
CDRL A002 UL
CDRL A003 UL
CDRL A004 UL
CDRL A005_v2 UL
CDRL A006_v2 UL
CDRL A007_v2 UL

File details come from the government source that posted it. Updated .