EXHIBIT A.pdf
PDF 294 KB Posted
- Attached to
- WSQ-9 GROMMETS Federal contract opportunity
- Solicitation number
- SPMYM4-25-Q-0749
About this file
This document is a technical specification for a procedure for molding a grommet insert into a grommet, specifically referencing MIL-S-24235/4. The procedure details a 12-step manufacturing process for creating a grommet using Neoprene Rubber (MIL-R-15624, Class 1, Grade 40-45). Key steps include sandblasting the grommet insert with #50 angular steel grit, applying Scotch-Grip 847 adhesive, suspending the insert 0.25" from the grommet surface, heating the mold to 300-305°F, compressing the mold for 30 minutes, cooling for 10-15 minutes, and trimming excess rubber. The accompanying technical drawings provide precise dimensional specifications for the grommet insert, which is to be made from aluminum bronze per ASTM B150-ENGL 1998, with specific threading, diameter, and positioning requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S1. SPMYM4-25-Q-0749.pdf | ||
| EXHIBIT C.pdf | ||
| EXHIBIT B.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P2. JML Attachment - 5147E850 - WSQ-9 GROMMETS - Procedure.pdf P2. JML Attachment - 5147E850 - WSQ-9 GROMMETS - Drawing.pdf
File details come from the government source that posted it. Updated .