Exhibit A.pdf

PDF 197 KB Posted

Attached to
Level 1 Welding Rod
Solicitation number
SPMYM325Q5055
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) for a welding rod contract with the Portsmouth Naval Shipyard. The CDRL contains three data items (A001, A002, A003) related to inspection and test plans, certification data for special emphasis materials, and certification/data reporting. Each data item requires the vendor to submit documentation to the Portsmouth Naval Shipyard for review and acceptance prior to material shipment, with specific modifications to standard documentation requirements for weld materials. The documents specify that certification data must be submitted under separate shipment numbers, and no material can be shipped before receiving acceptance. The contract line item number is 0002, the system/item is welding rod, and the documents were prepared by Jason Laflamme and approved by Matthew Gendreau on 06/09/2025 and 06/11/2025 respectively.

View the file

Other files

File Type Posted
SPMYM325Q5055.pdf PDF
TDP LL-LA1-0992 VER 03 (06-09-25).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

WELDING ROD

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

INSPECTION AND TEST PLAN

3. SUBTITLE

INSPECTION SYSTEM PROCEDURES

4. AUTHORITY (Data Acqisition Document No.)

DI-QCIC-81110 (SE)

5. CONTRACT REFERENCE

TDP: PARA 3.8.3

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

E

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Paragraph 10.4 of DI-QCIC-81110 does not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material. Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

Code 136.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE

006/09/2025

I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 1 of 3 Page(s)

S/N 0102-LF-010-5600

Matthew Gendreau 06/11/2025

A0002

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

WELDING ROD

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

CERT DATA FOR SPECIAL EMPHASIS MATL

3. SUBTITLE

CHEMICAL AND MECHANICAL

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-81020 (DD)

5. CONTRACT REFERENCE

TDP: PARA 3.14

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 2 of 3 Page(s)

S/N 0102-LF-010-5600

The following paragraphs of DI-MISC-81020 shall be modified as shown below:

10.1.1 - Add: Material marking for spooled wire shall be as identified within the applicable commodity specification.

10.1.2 - Add: For Weld Materials, the weld material manufacturer is considered the original mill.

10.2 - Replace the entire paragraph with: For Weld Materials, Certification is required for each test performed under Quality Conformance listed in the applicable paragraph of the military specification. (or Table 5 of AWS specifications)

06/09/2025 Matthew Gendreau 06/11/2025

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP

D. SYSTEM/ITEM

WELDING ROD

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

CERTIFICATION/DATA REPORT

3. SUBTITLE

SPECIAL EMPHASIS C OF C

4. AUTHORITY (Data Acqisition Document No.)

DI-MISC-80678 (CCDD)

5. CONTRACT REFERENCE

TDP: PARA 3.19

6. REQUIRING OFFICE

CODE 245

7. DD 250 REQ

SD

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

N/A

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft Final

Reg Repro

16. REMARKS

Block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, and 10.4 of DI-MISC-80678 do not apply.

For payment & submission of data refer to clauses 252.232-7006 and 252.232-7003 or 52.232-36. Certification data shall be submitted to Portsmouth Naval Shipyard for review and acceptance prior to each shipment of material.

Each data item submitted by vendor must be submitted under separate shipment number. No material is to be shipped prior to the receipt of Acceptance.

133.2 0 1 0

15. Total 0 1 0

G. PREPARED BY

Jason Laflamme

H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, JUN 90 Page 3 of 3 Page(s)

S/N 0102-LF-010-5600

06/09/2025 Matthew Gendreau 06/11/2025

File details come from the government source that posted it. Updated .