Exhibit A.docx
DOCX document 15 KB Posted
- Attached to
- CHILLER AND VENTILATION MAINTENANCE
- Solicitation number
- ARFQ 0512 WSH2700000006 2
- Issued by
- Kanawha County, West Virginia
About this file
This is a Mandatory Exhibit A document outlining bi-annual inspection and maintenance schedules for HVAC and ventilation equipment in West Virginia. The document specifies detailed maintenance requirements for four primary systems: cooling towers, air-cooled chillers, water-cooled chillers, and exhaust fans. The cooling tower maintenance includes ten tasks ranging from cleaning pan strainers and flushing pans to checking water quality for biological contamination and lubricating bearings. Air-cooled chiller maintenance comprises three primary tasks focusing on condenser coil cleaning, fan blade inspection, and unit operational verification including compressor amperage and refrigerant charge assessment. Water-cooled chiller maintenance is the most comprehensive, requiring eight tasks including water strainer cleaning, lubrication of various components, rupture disk inspection, condenser tube fouling assessment, oil sample collection and laboratory testing, and compressor motor winding resistance measurement, with oil changes mandated every 1,000 hours of operation per the Trane Oil Analysis Program. Exhaust fan maintenance includes four tasks encompassing belt replacement, lubrication where feasible, fan inspection for damage and vibration, and operational verification.
No specific contract term, response dates, due dates, bidder meetings, award dates, pricing structure, set-asides, incumbent information, or funding sources are provided in this exhibit document. The file serves exclusively as a technical specification attachment defining the scope and frequency of required maintenance services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BondLaborMat.pdf | ||
| WV43.pdf | ||
| Final_ARFQ_0512_WSH2700000006_1_WV_ARFQ_FORM.PDF | ||
| BondPerform.pdf | ||
| Bid Bond Form.pdf | ||
| Addendum #1.pdf | ||
| Final_ARFQ_0512_WSH2700000006_2_WV_ARFQ_FORM.PDF | ||
| WV75 - Construction Bid Submission Review.pdf | ||
| Exhibit C.xlsx | XLSX spreadsheet | |
| OSAFederalFundsContractClauseAddendum.pdf | ||
| WV36.pdf | ||
| TCA.pdf | ||
| Bid Bond Instructions.pdf | ||
| Purchasing Affidavit.pdf | ||
| WV72 Drug Free Coversheet.pdf | ||
| Exhibit B.xlsx | XLSX spreadsheet | |
| WV73 Drug Free Affidavit.pdf | ||
| RFQ Specifications.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MANDATORY
Exhibit A Bi-Annual Inspection and Maintenance Schedule Cooling Tower Bi-Annual
1. Clean Pan Strainer
2. Clean and Flush Pan
3. Check and Adjust Float Valve
4. Check Vibration Switch
5. Check Water Distribution System for Proper Spray
6. Check Fan Blades for Cracks and Proper Balance
7. Lubricate all Bearings
8. Replace Belt (Spring) and Ensure Proper Tension / Operation
9. Clean Louvers and Fan Screens
10. Check Water Quality for Biological Contamination Air Cooled Chiller Bi-Annual
1. Clean Condenser Coils with coil cleaner and water
2. Inspect Fan Blades for Cracks, Vibration and Proper Operation
3. Check Unit for Proper Operation Compressor Amp Draw / Refrigerant Charge Water-Cooled Chiller Bi-Annual
1. Clean all water strainers in system
2. Lubricate the vane control linkage, bearings, and ball-joints
3. Lubricate the vane operator tang O-rings
4. Drain contents of rupture disk and purge discharge vent line drip leg
5. Inspect the condenser tubes for fouling and clean
6. Collect oil sample and submit to qualified lab for testing
7. Measure compressor motor windings resistance to ground
8. Change oil every 1000 hours of operation per Trane Oil Analysis Program Exhaust Fan Maintenance
1. Replace belt
2. Lube if possible
3. Inspect fan for cracks, vibrations and clean
4. Inspect proper operation of unit
File details come from the government source that posted it. Updated .