Exhibit A.docx

DOCX document 15 KB Posted

Attached to
CHILLER AND VENTILATION MAINTENANCE
Solicitation number
ARFQ 0512 WSH2700000006 2
Issued by
Kanawha County, West Virginia

About this file

This is a Mandatory Exhibit A document outlining bi-annual inspection and maintenance schedules for HVAC and ventilation equipment in West Virginia. The document specifies detailed maintenance requirements for four primary systems: cooling towers, air-cooled chillers, water-cooled chillers, and exhaust fans. The cooling tower maintenance includes ten tasks ranging from cleaning pan strainers and flushing pans to checking water quality for biological contamination and lubricating bearings. Air-cooled chiller maintenance comprises three primary tasks focusing on condenser coil cleaning, fan blade inspection, and unit operational verification including compressor amperage and refrigerant charge assessment. Water-cooled chiller maintenance is the most comprehensive, requiring eight tasks including water strainer cleaning, lubrication of various components, rupture disk inspection, condenser tube fouling assessment, oil sample collection and laboratory testing, and compressor motor winding resistance measurement, with oil changes mandated every 1,000 hours of operation per the Trane Oil Analysis Program. Exhaust fan maintenance includes four tasks encompassing belt replacement, lubrication where feasible, fan inspection for damage and vibration, and operational verification.

No specific contract term, response dates, due dates, bidder meetings, award dates, pricing structure, set-asides, incumbent information, or funding sources are provided in this exhibit document. The file serves exclusively as a technical specification attachment defining the scope and frequency of required maintenance services.

View the file

Other files

File Type Posted
BondLaborMat.pdf PDF
WV43.pdf PDF
Final_ARFQ_0512_WSH2700000006_1_WV_ARFQ_FORM.PDF PDF
BondPerform.pdf PDF
Bid Bond Form.pdf PDF
Addendum #1.pdf PDF
Final_ARFQ_0512_WSH2700000006_2_WV_ARFQ_FORM.PDF PDF
WV75 - Construction Bid Submission Review.pdf PDF
Exhibit C.xlsx XLSX spreadsheet
OSAFederalFundsContractClauseAddendum.pdf PDF
WV36.pdf PDF
TCA.pdf PDF
Bid Bond Instructions.pdf PDF
Purchasing Affidavit.pdf PDF
WV72 Drug Free Coversheet.pdf PDF
Exhibit B.xlsx XLSX spreadsheet
WV73 Drug Free Affidavit.pdf PDF
RFQ Specifications.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANDATORY

Exhibit A Bi-Annual Inspection and Maintenance Schedule Cooling Tower Bi-Annual

1. Clean Pan Strainer

2. Clean and Flush Pan

3. Check and Adjust Float Valve

4. Check Vibration Switch

5. Check Water Distribution System for Proper Spray

6. Check Fan Blades for Cracks and Proper Balance

7. Lubricate all Bearings

8. Replace Belt (Spring) and Ensure Proper Tension / Operation

9. Clean Louvers and Fan Screens

10. Check Water Quality for Biological Contamination Air Cooled Chiller Bi-Annual

1. Clean Condenser Coils with coil cleaner and water

2. Inspect Fan Blades for Cracks, Vibration and Proper Operation

3. Check Unit for Proper Operation Compressor Amp Draw / Refrigerant Charge Water-Cooled Chiller Bi-Annual

1. Clean all water strainers in system

2. Lubricate the vane control linkage, bearings, and ball-joints

3. Lubricate the vane operator tang O-rings

4. Drain contents of rupture disk and purge discharge vent line drip leg

5. Inspect the condenser tubes for fouling and clean

6. Collect oil sample and submit to qualified lab for testing

7. Measure compressor motor windings resistance to ground

8. Change oil every 1000 hours of operation per Trane Oil Analysis Program Exhaust Fan Maintenance

1. Replace belt

2. Lube if possible

3. Inspect fan for cracks, vibrations and clean

4. Inspect proper operation of unit

File details come from the government source that posted it. Updated .