Exhibit A DD 1423 A001-A022_Redacted.pdf
PDF 515 KB Posted
- Attached to
- Aerial Target Flight Services (ATFS-4)
- Solicitation number
- W900KK21R0002
About this file
This document is a draft solicitation for aerial target flight services to support training, testing, and evaluation programs for the U.S. Army and other agencies. The requirement is for aerial target flight operations and maintenance services at Fort Bliss, Texas and White Sands Missile Range, New Mexico, and potentially other locations in the continental U.S. and outside the continental U.S. The services include target assembly and installation, preflight checks, site preparation, launch, flight, control, recovery, refurbishment, maintenance, and logbook upkeep. Government-furnished equipment and materials will be provided, such as targets, support equipment, tracking systems, and spare parts. The contractor must also provide environmental protection, quality assurance, logistics, data entry, and reporting. The NAICS code is 541990. Interested parties were asked to submit any questions, comments, or inputs on the draft solicitation by October 16, 2020 to help inform the final solicitation planned for the first quarter of fiscal year 2021.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Aerial Target Flight Services
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Contract Funds Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468
5. CONTRACT REFERENCE
PWS Para 3.2.38
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Monthly
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government review/approval will be 30 days. Contractor will resubmit within 15 days, if required. It is required to be delivered via electronic data interchange via email to
. Email address:
SFAE-STRI-CT2-S 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Invoicing and Payment Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81651
5. CONTRACT REFERENCE
PWS Para 3.2.38
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Monthly
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government review/approval will be 30 days. Contractor will resubmit within 15 days, if required. It is required to be delivered via electronic data interchange via email to
Email address:
SFAE-STRI-CT2-S 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Contract Work Breakdown Structure
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
PWS Para 2.5.1
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government review/approval will be 30 days. Contractor will resubmit within 15 days, if required. It is required to be delivered via electronic data interchange via email to
Email address:
SFAE-STRI-CT2-S 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Performance and Cost Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-80912
5. CONTRACT REFERENCE
PWS Para 2.5.1
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Monthly
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Subsequent submissions are due NLT 15 days after end of month. It is required to be delivered via electronic data interchange via email to Email address:
15. TOTAL 0 0 0
G. PREPARED BY H. DATE
05/19/2020
I. APPROVED BY J. DATE
05/19/2020
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page of Pages
Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK), AUG 96
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Aerial Target Flight Services
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Phase Out Transition Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81945
5. CONTRACT REFERENCE
PWS Para 2.5.6
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government comments 30 days after contractor submission. Resubmittals within 15 days, if required. It is required that information be delivered via email to Email address is:
SFAE-STRI-CT2-S 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
System Safety Program Plan (SSPP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81626
5. CONTRACT REFERENCE
PWS Para 2.8.2
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government comments 30 days after contractor submission. Resubmittals within 15 days, if required. Updates required if document is modified. It is required that information be delivered via email to Email address is:
SFAE-STRI-CT2-S 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
System Safety Program Progress Report (SSPPR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80105
5. CONTRACT REFERENCE
PWS Para 2.8.3, 2.8.18
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report due 45 days after contract award. Subsequent submissions are due NLT 15 days after end of month. It is required that information be delivered via email to
Email address is:
SFAE-STRI-CT2-S 0 1 1
15. TOTAL 0 1 1
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Safety Assessment Report (SAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80102
5. CONTRACT REFERENCE
PWS Para 2.8.4, 2.8.18
6. REQUIRING OFFICE
SFAE-STRI-CT2-S
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report due 45 days after contract award. Subsequent submissions are due NLT 15 days after end of month. It is required that information be delivered via email to
Email address is:
SFAE-STRI-CT2-S 0 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE
05/19/2020
I. APPROVED BY J. DATE
05/19/2020
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page of Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Aerial Target Flight Services
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
System Safety Hazard Analysis Report (SSHAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80101
5. CONTRACT REFERENCE
PWS Para 2.8.5
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government comments 30 days after submission, resubmit within 15 days, if required.
Update required if document is modified. It is required that information be delivered via electronic interchange to at
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Health Hazard Assessment Report (HHAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80106
5. CONTRACT REFERENCE
PWS Para 2.8.6, 2.8.18
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government comments 30 days after submission, resubmit within 15 days, if required.
Update required if document is modified. It is required that information be delivered via electronic interchange to at
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Accident/Incident Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81563
5. CONTRACT REFERENCE
PWS Para 2.8.18, 2.9
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report is due immediately after any serious accident/incident occurs. Report is to be updated to include new information whenever obtained. It is required that information be delivered via electronic interchange to at
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Technical Report-Study/Services
3. SUBTITLE
IA/Cyber Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
5. CONTRACT REFERENCE
PWS Para 2.10.3, 2.10.4,2.10.7
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report is due as specified in task order. Subsequent submissions as required. It is required that information be delivered via electronic interchange in Microsoft Office to at
SFAE-STRI-CT2 0 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE
05/19/2020
I. APPROVED BY J. DATE
05/19/2020
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page of Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Aerial Target Flight Servives
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Operations Security (OPSEC) Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80934C
5. CONTRACT REFERENCE
PWS Para 2.11.2, 2.11.5
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government review period will be 30 days. Contractor resubmit within 15 days, if required.
Contractor may submit revisions to existing documents in lieu of developing new documents. Information to be delivered to Email:
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Quality System Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCI-81379
5. CONTRACT REFERENCE
PWS Para 2.13.1, 2.13.2
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government review period will be 30 days. Contractor resubmit within 15 days, if required.
Information to be delivered via electronic data interchange (EDI) in Microsoft Office to
Email address is:
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Technical Report-Study Services
3. SUBTITLE
Quality Reports
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508
5. CONTRACT REFERENCE
PWS Para 2.13.2
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Rqd
12. DATE OF FIRST SUBMISSION
Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial submission as specified by task order. Government comments furnished within 45 days of receipt. Contractor resubmit 15 days, if required. Information to be delivered via email in Microsoft Office to Email address:
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368
5. CONTRACT REFERENCE
PWS Para 3.2.28, 3.2.31
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Mthly
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Government review period will be 30 days. Contractor resubmit within 15 days, if required.
Information to be delivered via electronic data interchange (EDI) in Microsoft Office to
Email address is:
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE
05/19/2020
I. APPROVED BY J. DATE
05/19/2020
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page of Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Aerial Target Flight Services
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
Progress Reports
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80555
5. CONTRACT REFERENCE
PWS Para 3.2.31, 3.10.4.1
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
Mthly
12. DATE OF FIRST SUBMISSION
Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report is due 45 days after contract award and monthly thereafter. Government comments furnished within 45 days of receipt. It is required that reports be delivered via email in Microsoft Office to Email address is:
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A018
2. TITLE OF DATA ITEM
Reproductions
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-EDRS-80940
5. CONTRACT REFERENCE
PWS Para 3.2.37
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Req
12. DATE OF FIRST SUBMISSION
Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Contractor shall deliver requested documentation within 1 day of request. It is required that documentation be delivered via electronic data interchange (EDI) media in Microsoft Office to Email address is:
SFAE-STRI-CT2 0 1 1
15. TOTAL 0 1 1
1. DATA ITEM NO.
A019
2. TITLE OF DATA ITEM
Status of Government Furnished Equipment Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80269
5. CONTRACT REFERENCE
PWS Para 3.8.2.10, 3.8.2.11
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Req
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report is due 45 days after contract award and monthly thereafter. Government comments furnished within 45 days of receipt. It is required that reports be delivered via email in Microsoft Office to Todd Barks. Email address is: Todd.D.Barks.civ@mail.mil
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO.
A020
2. TITLE OF DATA ITEM
Hazardous Materials Management Program Plan HMMP
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81398
5. CONTRACT REFERENCE
PWS Para 3.9.1
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Req
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial plan is due 45 days after contract award and monthly thereafter. Government comments furnished within 45 days of receipt. It is required that reports be delivered via email in Microsoft Office to Todd Barks. Email address is: Todd.D.Barks.civ@mai
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
G. PREPARED BY H. DATE
05/19/2020
I. APPROVED BY J. DATE
05/19/2020
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Reset Page of Pages Adobe Professional 8.0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM
Aerial Target Flight Services
E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO.
A021
2. TITLE OF DATA ITEM
Hazardous Materials Management Program Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81397B
5. CONTRACT REFERENCE
PWS Para 3.9.1
6. REQUIRING OFFICE
SFAE-STRI-CT2
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
As Req
12. DATE OF FIRST SUBMISSION
45 DACA
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Blk 16 Draft
Final
Reg Repro
16. REMARKS
Initial report is due 45 days after contract award. Government review period will be 45 days after receipt. Contractor resubmit within 45 days, if required. Update reports during contract period. Report to be delivered to Todd Barks at Todd.D.Barks.civ@mail mil
SFAE-STRI-CT2 1 1 1
15. TOTAL 1 1 1
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
15. TOTAL 0 0 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
15. TOTAL 0 0 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
15. TOTAL 0 0 0
G. PREPARED BY H. DATE
05/19/2020
I. APPROVED BY J. DATE
05/19/2020
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page of Pages Adobe Professional 8 0
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
Reset
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .