Exhibit A - Contract Date Requirements List (CDRL).pdf

PDF 880 KB Posted

Attached to
Wideband Enterprise Satellite Systems (WESS) Enterprise Digital Intermediate Frequency Multi-Carrier (EDIM) Modem
Solicitation number
W519TC-23-R-0031
Issued by

About this file

This is a Contract Data Requirements List (CDRL) for the Enterprise Digital Intermediate Frequency Multi-Carrier (EDIM) Modem contract. The CDRL outlines 16 data items the contractor must submit at various stages of the contract, including a Technical Data Package, Interface Control Document, Product Specification, Engineering Data for Provisioning, Maintenance Allocation Chart, and Electronic Technical Manual. Key deliverables include a Technical Data Package due 40 business days after completion of First Article Testing, an Interface Control Document due 20 business days after FAT, and drafts of the Electronic Technical Manual at 30%, 70%, and 100% completion. The Government will review deliverables and provide comments for incorporation. Final deliverables are due 10-30 business days after receipt of Government comments depending on the item. The CDRL also includes training, logistics, and cybersecurity documentation requirements.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Product Change Notice (PCN)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80711 PWS Para 2.3 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

SEE

BLOCK 16

Reg

Repro

16. REMARKS

The Contractor shall prepare and submit draft PCNs IAW PWS Paragraph 2.3, as required.

The Government requires 5 business days for review and comment.

The Contractor shall submit the final PCN NLT 5 business days after their receipt of Government comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

ELECTRONIC

SUBMITTAL

1 1 0

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

mailto:jessica.l.gregris.civ@mail.mil mailto:darren.l.hargis.ctr@mail.mil

A002

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Technical Data Package (TDP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80711A PWS Para 3.1 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft TDP IAW PWS Paragraph 3.1 NLT 40 business days after the completion of

FAT.

The Government requires 10 business days for review and comment.

The Contractor shall submit the final TDP NLT 10 business days after their receipt of Government comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A003

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Interface Control Document (ICD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80711A PWS Para 3.2 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft ICD IAW PWS Paragraph 3.2 NLT 20 business days after the completion of

FAT.

The Government requires 40 business days for review and comment.

The Contractor shall submit a revised ICD that addresses the Government comments INLT 10 business days after their receipt of the comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A004

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Product Specification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566 PWS Para 3.3 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft Product Specification IAW PWS Paragraph 3.3 NLT 60 business days after the completion of FAT.

The Government requires 10 business days for review and comment.

The Contractor shall submit a revised Product Specification that addresses the Government comments NLT 10 business days after their receipt of the comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A005

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 Preliminary Design Review (PDR) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80711A PWS Para 6.3 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft PDR Report IAW Paragraph 6.3 NLT 10 business days after PDR. At minimum, the report shall include all PDR presentations, a summary of the review, and an action items list with assigned organizations and due dates.

The Government requires 10 business days for review and comment.

The Contractor shall submit a revised (final) PDR report that addresses the Government comments NLT 10 business days after their receipt of the comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A006

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006 First Article Test (FAT) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566 PWS Para 4.1.1 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft FAT plan IAW PWS Paragraph 4.1.1 NLT 120 business days before the start of

FAT.

The Government requires 15 business days for review and comment.

The Contractor shall submit a revised FAT Plan that addresses the Government comments NLT 15 business days after their receipt of the comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A007

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 First Article Test (FAT) Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80603 PWS Para 4.1.2 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft FAT procedures IAW PWS Paragraph 4.1.2 NLT 80 business days before the start of FAT.

The Government requires 15 business days for review and comment.

The Contractor shall submit revised draft procedures (2nd draft) that address the Government comments NLT 10 business days after their receipt of the comments.

Tests shall be run using the approved draft document. All changes to the procedures that may be necessary during FAT must be agreed to by both Government and Contractor personnel. Changes shall be red-lined during tests and made part of the final submittal.

The Contractor shall submit the final FAT procedures concurrently with draft FAT Report.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A008

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008 First Article Test (FAT) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809B PWS Para 4.1.3 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft FAT Report IAW Paragraph 4.1.3 NLT 20 business days after the completion of FAT.

The Government requires 15 business days for review and comment.

The Contractor shall submit a revised (final) FAT Report that addresses the Government comments NLT 10 business days after their receipt of the comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A009

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009 Production Qualification Test (PQT) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566 PWS Para 4.2.1 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft PQT Plan IAW PWS Paragraph 4.2.1 NLT 60 business days prior to start of production.

The Government requires 10 business days for review and comment.

The Contractor shall submit a revised (final) PQT Plan that addresses the Government comments NLT 15 business days after their receipt of the comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A010

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010 Production Qualification Test (PQT) Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566 PWS Para 4.2.2 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft PQT Procedures IAW PWS Paragraph 4.2.2 NLT 40 business days prior to start of production.

The Government requires 10 business days for review and comment.

The Contractor shall submit a revised (final) PQT Procedures that address all the Government comments NLT 15 business days after their receipt of the comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A011

1CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011 Product Qualification Test (PQT) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809 PWS Para 4.2.3 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare the PQT Reports IAW PWS Paragraph 4.2.3, and submit them as attachments to the Monthly Status Report (MSR). Each MSR shall include the PQT Reports for all the production modems delivered during the MSR period of performance.

The Government requires 5 business days for review and comment.

The Contractor shall submit a revised (final) PQT Report that addresses all the Government comments NLT 10 business days after their receipt of the comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

A012

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012 Failure Reporting, Analysis and Corrective Action System (FRACAS) Report

DI-SEES-81315 PWS Para 4.2.4.1 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE BLOCK

SEE BLOCK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE BLOCK

SEE BLOCK 16

The Contractor shall prepare FRACAS Reports IAW PWS Paragraph 4.2.4.1., and shall submit them as attachments to the MSR. Each MSR will include the FRACAS Reports prepared during the MSR period of performance.

The Government requires 5 business days for review and comment.

The Contractor shall submit a revised (final) FRACAS report that addresses all the Government comments NLT 10 business days after their receipt of the comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

B001

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B001 Technical Study Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80711A PWS Para 8 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

As required, the Contractor shall prepare and submit technical study reports IAW PWS Paragraph 8.

The Government requires 15 business days for review and comment.

The Contractor shall submit a revised (final) technical study report that addresses the Government comments NLT 15 business days after their receipt of the comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

B002

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B002 Monthly Status Report (MSR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80711A PWS Para 11.2.1 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall submit the first MSR NLT 20 business days after the Post Award Conference. Subsequent MSRs shall be submitted on a monthly basis. The Contractor shall submit the subsequent MSRs no later than the 5th of each month, The Government requires 5 business days for review and comment.

The Contractor shall submit a revised MSR NLT 5 business days after their receipt of the Government comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

B003

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

B003 Integrated Master Schedule (IMS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566 PWS Para 11.2.2 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the draft IMS NLT 5 business days prior to the Post Award Conference. Subsequent IMS updates shall be included in the MSR submittal.

The Government requires 5 business days for review and comment.

The Contractor shall submit a revised IMS that addresses all the Government comments NLT 10 business days after their receipt of the comments.

The Government requires 5 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

D001

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block 16-Remarks..

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

D TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

D001 Hardware Logistical Analysis Data (HLAD)

DI-MISC-80711A 5.1.1

7. DD 250 REQ 9. DIST

STATEMENT

FREQUENCY

12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

DD REQUIRED Once See Block 16

D a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION Draf t

Final

A

See Block 16 Re g

Repr o

16. REMARKS jessica.l.gregris.civ @army.mil 1 1

PREPARATION INSTRUCTIONS: The Contractor shall prepare and submit the HLAD, in the Contractor’s format, IAW the cited Data Item Description (DID) and PWS Paragraph 5.1.1.

BLOCK 12 – DATE OF FIRST SUBMISSION: The Contractor shall submit the first HLAD NLT 20 business days after the Critical Design Review (CDR).

The Government requires 20 business days for review and comment.

The Contractor shall submit a revised HLAD NLT 20 business days after their receipt of the Government comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

BLOCK 13 – DATE OF SUBSEQUENT SUBMISSION: The Contractor shall submit updates to this CDRL, as required, darren.l.hargis.ctr@ar my.mil and/or if the Contractor makes changes to the Government approved submission.

The Government requires 20 business days for review and comment.

The Contractor shall submit a revised HLAD NLT 20 business days after their receipt of the Government comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

INFORMATION REQUIRED:

The Contractor shall identify all system components (e.g., end item, LRU, and SRU) with the Original Equipment Manufacturer (OEM) Part Number (PN) and Commercial and Government Entity (CAGE) Code. The Contractor shall provide a drawing tree structure diagram depicting the relationship of each subassembly, assembly, and subsystem to the end item system. Although not inclusive, the following list identifies the types of information that may be required for the end item and each system LRU/SRU:

• Unit Price (U/P)

• Mean Time Between Failure (MTBF) in hours

• Mean Time To Repair (MTTR) in hours

• Total number of the item within the Next Higher

Assembly (NHA)

• Packaged shipping weight

• Washout Rate (WR)

• False removal rate

• Diagnostic time contained within MTTR

• Average price of piece parts used in each repair action

• Test Program Set (TPS) software development cost

• Expected annual TPS maintenance cost

• Test equipment and facilities required for repair, including square footage, power generation, and security requirements

• Test equipment and facilities usage time to effect repair

• Type of technician required for repair

• Echelon of maintenance where technician is used

• Technician time to effect repair

• Training costs for special technician requirements

• Cost of technical repair documentation

• The following for each unique, special, and/or peculiar test equipment used in the repair process:

o One-time development cost o Expected life o Maintenance echelon(s) where equipment is used o Unit Price (U/P) o Expected annual ownership cost o Purpose (i.e., diagnostic testing only, repair only, or both diagnostic testing and repair) o One-time installation cost by maintenance echelon

SUBMISSION: The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

15. TOTAL 1 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block 16-Remarks.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

D002 Logistic Support Analysis Record (LSAR)

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT

REFERENCE

6. REQUIRING OFFICE

DI-ILSS-80391 PWS Para.

5.1.2.1

FREQUENCY

DD REQUIRED Once See Block 16

b. COPIES

8. APP CODE 11. AS OF

DATE

13. DATE OF

SUBSEQUENT

SUBMISSION Draft

Final

A

See Block 16 Reg Repro

16. REMARKS 1 1

PREPARATION INSTRUCTIONS: The Contractor shall prepare and submit the LSAR Pricing Plan, in the Contractor’s format, IAW the cited Data Item Description (DID) and PWS Paragraph 5.1.2.1.

BLOCK 12 – DATE OF FIRST SUBMISSION: The Contractor shall submit the first LSAR Pricing Plan NLT 40 business days after contract award.

The Government requires 20 business days for review and comment.

The Contractor shall submit a revised LSAR Pricing Plan NLT 20 business days following their receipt of the Government comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

jessica.l.gregris.civ@army.mil darren.l.hargis.ctr@army.mil

BLOCK 13 – DATE OF SUBSEQUENT

SUBMISSION: The Contractor shall submit updates to this CDRL, as required, and/or if the Contractor makes changes to the Government approved submission.

The Government requires 20 business days for review and comment.

The Contractor shall submit a revised LSAR Pricing Plan NLT 20 business days after their receipt of the Government comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

INFORMATION REQUIRED:

The Contractor shall identify all system components (e.g., end item, LRU, and SRU) with the Original Equipment Manufacturer (OEM) Part Number (PN) and Commercial and Government Entity (CAGE) Code. The Contractor shall provide a drawing tree structure diagram shall be provided depicting the relationship of each subassembly, assembly, and subsystem to the end item system.

SUBMISSION: The cover letter pertaining to the submission of this document shall be forwarded by E- Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

(1 Data Item)

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

D003 Level of Repair Analysis (LORA) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-PSSS-81872A PWS Para 5.3.2.2 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the LORA Report, in the Contractor’s format, IAW the cited Data Item Description (DID) and PWS Section 5.3.2.2

BLOCK 12- DATE OF FIRST SUBMISSION: The Contractor shall submit the first LORA Report NLT 20 business days after the CDR.

The Government requires 20 business days for review and comment.

The Contractor shall submit a revised LORA Report NLT 10 business days after their receipt of the Government comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

BLOCK 13- DATE OF SUBSEQUENT SUBMISSION: The Contractor shall submit updates to the CDRL, as required, and/or if the Contractor makes changes to the Government approved submission.

The Government requires 10 business days for review and comment.

The Contractor shall submit a revised LORA Report NLT 10 business days after their receipt of the Government comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

D004 Maintenance Allocation Chart (MAC)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566 PWS Para 5.3.3 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

SEE

BLOCK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE

BLOCK 16

The Contractor shall prepare and submit the MAC IAW PWS Paragraph 5.3.3.

The Contractor shall submit the completed MAC before EDIM ETM delivery per CDRL D008.

The Government requires 20 business days for review and comment.

The Contractor shall submit a revised MAC that incorporates any Government edits and addresses any Government comments NLT 20 business days after their receipt of the edits/comments.

The Government requires 10 business days to review the final submission to confirm the Government comments have been addressed and to accept/reject the CDRL.

The cover letter pertaining to the submission of this document shall be forwarded by E-Mail to the addressees listed in Block 14a. The document itself shall be submitted by posting it in the Data Repository, as described in PWS Paragraph 11.1.1.

SFAE-PST-WE

jessica.l.gregris.civ @army.mil darren.l.hargis.ctr@ army.mil

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

D TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

EDIM Modem

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

D005 Engineering Data for Provisioning (EDFP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81000E PWS Para 5.3.4 SFAE-PST-WE

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

DD SEE

BLOCK 16

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

A SEE

BLOCK 16

The Contractor shall prepare and submit…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .