Exhibit A - Contract Data Requirements List.pdf

PDF 6 MB Posted

Attached to
XM919 IAM - W15QKN23R0056 - Draft Request for Proposal Federal contract opportunity
Solicitation number
W15QKN23R0056
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188 OMB Approval Expires 20221130

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A048 title: Scientific and Technical Reports Summary sub: Correction factors in Quadrant Elevation (QE) auth: DI-MISC-80048 ref: SOW C.5.9.3 req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: As Required addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

Block 12: 180 Days after contract award.

The contractor shall provide a copy of the XM919 IAM and Tracer Ammunition Cartridge firing tables containing quadrant elevation in mils, maximum range of the round, deflection, time of flight in fifty (50) meter increments to five hundred (300) meters, velocity in fifty (50) meter increments to three hundred (200) meters, and maximum ordinate. Correction factors in Quadrant Elevation (QE) for temperature variance, crosswind, and altitude shall be provided

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-02-23T08:28:08-0500

MALONE.ADAM.WILLIAM.1028008917

prep_date: 5/15/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A016 title: Certification/Data Report sub: (Energetic) Material Certifications Report auth: DI-MISC-80678 ref: SOW C.5.3.13 req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: As Required addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

BLOCK 12: The Contractor shall submit Energetic /Material Certifications Report 30 days prior to FAT/LAT.

BLOCK 14: Energetic Description Data Sheets of the energetic materials shall be provided for each lot (DI-MISC-80678) Energetic materials used in components or end items shall have been manufactured within 5 years of the date of the delivery of XM919 systems to the Government, unless otherwise approved by the Government on a RFV in accordance with the provisions of the contract. Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

BLOCK 14: DISTRIBUTION - SEE ATTACHED CDRL DISTRIBUTION

POINT OF CONTACT LIST PROVIDED AS AN ATTACHMENT

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-02-22T11:01:34-0500

MALONE.ADAM.WILLIAM.1028008917

prep_date: 2/22/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A017 title: Critical Characteristics Control Plan (CCCP) sub:

auth: DI-MGMT-81986 ref: SOW C.5.3.14 & QA Addendum req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: See Blk 16 addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

Block 12 & 13: Submission for Government approval due NLT thirty (60) days prior to FAT.

If changes occur after initial approval, submit revisions for approval within ten (10) days of any revisions.

The Government will respond within thirty (30) days of receipt of first submittal and within ten (10) days of all revisions and subsequent submittals.

Contractor shall respond within ten (10) days of receipt of Government response

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

BLOCK 14: DISTRIBUTION - SEE ATTACHED CDRL DISTRIBUTION

POINT OF CONTACT LIST PROVIDED AS AN ATTACHMENT

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-02-22T11:02:09-0500

MALONE.ADAM.WILLIAM.1028008917

prep_date: 2/22/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A049 title: Scientific and Technical Reports Summary sub: Launch Tube Integrity auth: DI-MISC-80048 ref: SOW C.5.9.4 req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: As Required addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

Block 12: Included with Request for Proposal

The contractor shall provide a safety analysis CDRL that verifies acceptable factor of safety for the barrel material to withstand the pressure produced by the propulsion charge. Analysis should include value of pressure at each point along the tube vs yield strength value. Test data that verifies predictive modeling of the material strength characteristics. Propulsion charge performance data shall be provided on as many propellant lots available to document pressure variation within the barrel used with XM919 IAM projectile. Barrel material strength characteristics across the operating temperature range shall be provided.

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-05-17T12:51:31-0400

MALONE.ADAM.WILLIAM.1028008917

prep_date: 5/17/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A050 title: Scientific and Technical Reports Summary sub: Projectile Flight and Metal Parts Integrity auth: DI-MISC-80048 ref: SOW C.5.9.5 req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: As Required addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

Block 12: Included with Request for Proposal

The contractor shall provide a report verifying projectile metal parts security/integrity when launched at maximum operating pressure (at least 105% of permissible maximum pressure) fired at upper and lower operating temperature.

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-05-17T12:57:18-0400

MALONE.ADAM.WILLIAM.1028008917

prep_date: 5/17/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A018 title: Critical Characteristics Item, Characteristics and Critical Defect Report sub: CICC, Notification, Investigation, Segregated Material Use and Restart Request auth: DI-SAFT-80970A ref: SOW C.5.3.14 & QA Addendum req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: See Blk 16 addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLOCK 14: DISTRIBUTION - SEE ATTACHED CDRL DISTRIBUTION POINT OF CONTACT LIST PROVIDED AS AN ATTACHMENT 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

Critical Item Characteristics List (CICCL) ( DID paragraph 3.3)

BLK 12 and 13: If applicable, contractor shall submit when required.. Government will respond within 45 days of receipt of original and any required revisions. Unless otherwise stated, contractor shall submit revisions within 10 days of receipt of Government response.

Notification of a critical defect (DID paragraph 4.1)

BLK 12 and 13: Unless otherwise approved by the PCO, notification of the occurrence of any critical defects shall be made to government, see distribution list, within 24 hours of event, by the most expeditious means available.

Root Cause Investigation and Corrective Action (DID paragraph 4.2)

BLK 12 and 13: Contractor shall submit to the Government, see list, for approval.

Government will respond within 45 days of receipt of original and any required revisions.

Unless otherwise stated, contractor shall submit revisions within 10 days of receipt of Government response.

Segregated Suspect Material Use (DID paragraph 4.3)

BL12 and 13: Contractor shall submit to the Government, see list, for approval.

Government will respond within 45 days of receipt of original and any required revisions.

Unless otherwise stated, contractor shall submit revisions within 10 days of receipt of government response.

Request to Restart Operations (DID paragraph 4.3)

BLK 12 and 13: Contractor shall submit to Government, see list, for approval.

Government will respond within 10 days of receipt.

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

BLOCK 14: DISTRIBUTION - SEE ATTACHED CDRL DISTRIBUTION

POINT OF CONTACT LIST PROVIDED AS AN ATTACHMENT

All submissions shall be in English.

Page2:

Reset:

2023-02-23T08:48:58-0500

MALONE.ADAM.WILLIAM.1028008917

prep_date: 2/23/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A019 title: Critical Plan of Action (CPOA) sub:

auth: DI-MGMT-81996 ref: SOW C.5.3.14& QA Addendum req_ofc: FCDD-ACE-QMG dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: See Blk 16 addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

BLOCK 10: Contractor may voluntarily submit a CPOA for all critical characteristics as specified in the contract clause reference.

BLOCK 12: Contractor shall submit the CPOA for approval prior to use. Government will respond within 45 days of receipt of original and any required revisions.

Unless otherwise specified, contractor shall submit revisions within 10 days of receipt of Government response. Unless otherwise approved by the PCO, the CPOA is not authorized for use prior to Government approval.

BLOCK 13: Unless otherwise specified, if the CPOA changes after initial Government approval, Contractor shall resubmit revised plan for Government approval.

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

BLOCK 14: DISTRIBUTION - SEE ATTACHED CDRL DISTRIBUTION

POINT OF CONTACT LIST PROVIDED AS AN ATTACHMENT

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-02-22T11:03:17-0500

MALONE.ADAM.WILLIAM.1028008917

prep_date: 2/22/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A051 title: Operations Security (OPSEC) Plan sub:

auth: DI-MGMT-80943C ref: SOW C.5.10.1 req_ofc: FCDD-ACM-ML dd250: LT appcode:

dist: C freq: As Required asof: As Required firstsub: See Blk 16 subsub: As Required addressee1: ACC-NJ-CC draft1:

reg1: 1 repro1:

addressee2: SFAE-AMO-CCS draft2:

reg2: 1 repro2:

addressee3: FCDD-ACM-ML draft3:

reg3: 1 repro3:

addressee4: FCDD-ACE-QMG draft4:

reg4: 1 repro4:

addressee5: FCDD-ACE-QPB draft5:

reg5: 1 repro5:

addressee6: PM AMMO draft6:

reg6: 1 repro6:

addressee7: DCMA-QAR draft7:

reg7: 1 repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_reg: 7 total_repro: 0 remarks: BLK 9: DISTRIBUTION STATEMENT C: DISTRIBUTION

AUTHORIZED TO US GOV'T AGENCIES AND THEIR

CONTRACTORS; CRITICAL TECHNOLOGY; 11 MARCH 2013.

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED

TO ACC-NJ-CC PCO BLDG.10 PICATINNY ARSENAL, NJ 07806-

The contractor shall develop an OPSEC Standard Operating Procedure (SOP)/Plan within 90 calendar days of contract award

BLOCK 14: Electronic submission is suggested with electronic mail transfer as the preferred format. Should the volume of data to be submitted exceed the limits of electronic mail transfer, submission using compact disk with .PDF file format is acceptable. regardless of submission method selected, file format used must be compatible with Microsoft Office.

All submissions shall be in English.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: XM919 Individual Assault Munition (IAM) ctr_no:

contr:

remarksb:

Page2:

Reset:

2023-02-23T08:28:49-0500

MALONE.ADAM.WILLIAM.1028008917

prep_date: 5/15/2023 app_by:

app_date:

Page: 1 of_pages: 1 app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A052 title: Product Engineering Design Data and Associated Lists sub: Technical Data Package (TDP) auth: DI-SESS-81000F ref: SOW C.5.11 req_ofc: FCDD-ACM-ML dd250: LT appcode:

dist: C freq: E

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .