Kenwood Park Erosion Stabilization Project Summary
This is a Construction Plan Set document for Kenwood Park Erosion Stabilization prepared by LJA Engineering for Fayette County Board of Commissioners in Fayetteville, Georgia. The project involves erosion stabilization work on a 169.19-acre recreational facility park with associated parking, located in Land Lot 249 of the 5 & 13 District in Fayette County. The scope of work includes site grading, installation of erosion control measures, slope stabilization using matting (Solmax Propex Pyramat 75), permanent seeding with hydraulic application, and installation of dust control devices. The total disturbed area is 0.95 acres across four identified areas, with specific attention to protecting existing trees, concrete infrastructure, track surfaces, and utility systems. Construction is organized in three phases: initial (installation of construction exits, silt fencing, tree protection, inlet sediment traps, and dust control), intermediate (slope stabilization and maintenance of initial controls), and final (permanent grassing and removal of temporary controls). The plans include detailed specifications for soil amendments, seed quality standards using pure live seed calculations, mulching techniques, and maintenance protocols. Bid submission deadline is 3:00 p.m. on Tuesday, July 28, 2026, to the Fayette County Purchasing Department at 140 Stonewall Avenue West, Suite 204, Fayetteville, Georgia 30214, with inquiries directed to Tamia Carnell at tcarnell@fayettecountyga.gov.
The construction plans specify compliance with Fayette County Standard Specifications and Regulations, the Manual for Erosion and Sediment Control in Georgia (latest edition), and OSHA directives for excavation and trenching. Key materials include green excelsior net matting or approved equivalents, erosion control blankets, and bonded fiber matrix for seeding applications. The contractor bears responsibility for topsoil provision if insufficient onsite material exists, coordination of all utility relocations and associated costs, removal of construction debris, repairs to any damaged existing infrastructure, and final inspections. The site receives stormwater discharge to Camp Creek and does not lie within a flood hazard area or impaired stream segment, with no state waters or wetlands located within 200 feet. All construction must maintain positive drainage, comply with stream buffer requirements measured from wrested vegetation points, and keep the disturbed area and exposure duration to a practical minimum. Maintenance of erosion control practices remains the property owner's responsibility at all times during and after construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 27001_B ITB.pdf | ||
| Exhibit B _ Technical Specifications.pdf | ||
| Exhibit C _ Propex Installation Guidelines.pdf | ||
| 27001_B Bid Price Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2026 Microsoft Corporation © 2026 TomTom
SITE
PRINT PRIMARY PERMITTEE NAME
SIGNATURE PRIMARY PERMITTEE NAME DATE
PRINT SECONDARY PERMITTEE NAME
SIGNATURE SECONDARY PERMITTEE NAME DATE
PRINT TERTIARY PERMITTEE NAME
SIGNATURE TERTIARY PERMITTEE NAME DATE
24 HOUR CONTACT NUMBER
24 HOUR CONTACT NUMBER
24 HOUR CONTACT NUMBER
EROSION STABILIZATION PLANS
FOR
PREPARED BY
LJA ENGINEERING
350 AIRPORT ROAD GRIFFIN, GA. 30224
PH. (770) 412-7700 FAX (770) 412-7744
LOCATED AT
GA-279
FAYETTEVILLE, GA 30214
APRIL 2026
KENWOOD PARK
EROSION STABILIZATION
24 HOUR CONTACT:
ANITA GODBEE
PH: 770-716-4321
140 STONEWALL AVE. W, SUITE 101
FAYETTEVILLE, GA 30214
AGODBEE@FAYETTECOUNTYGA.GOV
TOTAL SITE AREA = 169.19 ACRES
DISTURBED AREA = 0.95 ACRES
NOTE: DISTURBED AREAS FALL UNDER LANDSCAPING
EXEMPTION FOR ES&SP REQUIREMENTS.
COVER
ANITA GODBEE 770-716-4321
GAGR7591-26020
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
SHEET OF 13
FAYETTE
COUNTY B.O.C.
140 STONEWALL AVE. W,
SUITE 101
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
01000 1000 2000
4000500
Know what'sbelow.
Callbefore you dig.
Utilities Protection Center, Inc.
GEORGIA
LOCATION MAP
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
Sheet List Table Sheet Number Sheet Title
01 COVER
02 GENERAL NOTES
03 EX. CONDITIONS (1)
04 EX. CONDITIONS (2)
05 DEMO PLAN (1)
06 DEMO PLAN (2)
07 SITE GRADING PLAN (1)
08 SITE GRADING PLAN (2)
09 ESPC NOTES & DETAILS (1)
10 ESPC NOTES & DETAILS (2)
11 ESPC (1)
12 ESPC (2)
13 CONSTRUCTION DETAILS
SLOPES AND DISTURBED AREAS ARE NOT COVERED BY BUILDING OR PAVEMENT SHALL BE
GRADED SMOOTH AND RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR TO PROVIDE TOPSOIL
IF NOT AVAILABLE ON SITE. THE AREAS SHALL BE SEEDED AND COVERED WITH MATTING AS
DESIGNATED ON PLANS, FERTILIZED AND WATERED TO PROVIDE A HEARTY, MOWABLE
STAND OF GRASS. SMALL ROCKS MUST BE REMOVED, ANY AREAS DISTURBED FOR ANY
REASON PRIOR TO FINALLY ACCEPTANCE OF THE PROJECT SHALL BE CORRECTED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
DESCRIPTION OF
EROSION CONTROL MEASURES
INITIAL PHASE:
1. CONTRACTOR TO INSTALL A CONSTRUCTION EXIT PER THE DETAIL
WITHIN THIS DRAWING SET (SHEET 10).
2. INSTALL PERIMETER SILT FENCING.
3. CONTRACTOR TO INSTALL TREE PROTECTION AROUND ALL TREES
WITHIN DISTURBED AREA.
4. CONTRACTOR TO INSTALL INLET SEDIMENT TRAPS ON ALL EXISTING
STORM DRAIN INLETS.
5. DURING THE INITIAL PHASE OF CONSTRUCTION SHOULD ANY
AREAS BE LEFT DISTURBED FOR MORE THAN 14 DAYS THEY
SHOULD BE MULCHED AND TEMPORARILY GRASSED.
6. PROVIDE PERIODIC WETTING OF THE SITE DURING DRY MONTHS TO
PREVENT DUST FROM LEAVING THE SITE.
INTERMEDIATE PHASE:
7. CONTRACTOR TO INSTALL SLOPE STABILIZATION ON ALL SLOPES.
8. PERIMETER SILT FENCING AND TREE PROTECTION INSTALLED
DURING INITIAL PHASE IS TO BE MAINTAINED.
9. DURING THE INTERMEDIATE PHASE OF CONSTRUCTION SHOULD
ANY AREAS BE LEFT DISTURBED FOR MORE THAN 14 DAYS THEY
SHOULD BE MULCHED AND TEMPORARILY GRASSED.
10.PROVIDE PERIODIC WETTING OF THE SITE DURING DRY MONTHS TO
PREVENT DUST FROM LEAVING THE SITE.
FINAL PHASE:
1. CONTRACTOR TO MAINTAIN PERIMETER SILT FENCING.
2. CONTRACTOR SHALL PROVIDE PERMANENT GRASSING FOR FINAL
STABILIZATION OF ALL DISTURBED AREAS.
3. REMOVE SILT FENCE, TREE PROTECTION, AND CONSTRUCTION
ENTRANCE AFTER CONSTRUCTION IS COMPLETE AND ONCE FINAL
GRASSING IS ESTABLISHED.
4. AFTER CONSTRUCTION IS COMPLETE OWNER SHALL MAINTAIN
DETENTION POND PER THE OPERATION AND MAINTENANCE PLAN.
5. MAINTAIN PERMANENT GRASSING OVER ENTIRE SITE.
GENERAL NOTES
GAGR7591-26020
SHEET OF 13
1. BOUNDARY AND TOPOGRAPHICAL DATA TAKEN FROM INFORMATION PREPARED BY
LJA ENGINEERING, INC. 350 AIRPORT ROAD, GRIFFIN GA, GEORGIA 30224.
SURVEY DATE: MARCH 19, 2026.
2. PROPERTY LOCATED IN LAND LOT 249 OF THE 5 & 13 DISTRICT, FAYETTE, GEORGIA.
3. PROPERTY OWNER: FAYETTE COUNTY B.O.C.
CONTACT: 770-716-4321
SITE ZONED: E-1 EXEMPT
SITE USAGE: RECREATIONAL FACILITY PARK WITH ASSOCIATED PARKING
4. ADJACENT PROPERTIES ARE ZONED C-3 COMMERCIAL, C-4 COMMERCIAL, E-1 EXEMPT, E-4 EXEMPT, R-3 RESIDENTIAL, R-4 RESIDENTIAL, AND V-4 CONSERVATION
5. TOTAL AREA OF SITE = 169.19 ACRES
IMPERVIOUS SURFACE OF CURRENT SITE = N/A
PERCENTAGE OF IMPERVIOUS SURFACE = N/A
MAXIMUM IMPERVIOUS SURFACE ALLOWED = N/A
6. ALL CONSTRUCTION SHALL CONFORM TO FAYETTE COUNTY STANDARD SPECIFICATIONS AND
REGULATIONS.
7. PERSONS USING THIS DRAWING SHOULD CONTACT LOCAL UTILITY COMPANIES FOR EXACT
LOCATIONS OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
8. ALL DIMENSIONS ARE TO OUTSIDE FACE OF BUILDING (WHERE APPLICABLE) TO FACE OF CURB, OR AS OTHERWISE NOTED. SEE ARCH. DWGS. FOR BUILDING DIMENSIONS AND VERIFY WITH
SITE PLAN.
9. OWNER/DEVELOPER CONTACT: FAYETTE COUNTY B.O.C.
770-716-4321
140 STONEWALL AVE. W, SUITE 101
FAYETTEVILLE, GA 30214
10. ALL PROPOSED ELEVATIONS ARE FINISHED GRADE ELEVATIONS.
11. THESE DOCUMENTS ARE FOR CONSTRUCTION PURPOSES ONLY AND ARE NOT INTENDED TO BE
UTILIZE IN ANY WAY AS RECORD DOCUMENTS. AS-BUILT DRAWINGS REQUIRED BY
GOVERNMENT AGENCIES MUST BE PROVIDED FROM FIELD RUN DATA PER THE SPECIFICATIONS
OF THE GOVERNMENT AGENCY.
1. CONTRACTOR IS TO COMPLY WITH ALL LOCAL BUILDING CODES AND REGULATIONS WHICH ARE
PRESENTLY IN EFFECT.
2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED ABOUT THE LOCATION AND/OR ELEVATIONS OF
EXISTING UTILITIES SHOWN ON THIS DRAWING. THEY ARE BASED UPON RECORDS FROM
VARIOUS UTILITY COMPANIES, DEEDS AND PLATS OF RECORD, AND WHERE POSSIBLE, ACTUAL
FIELD MEASUREMENTS. THIS INFORMATION IS NOT TO BE TAKEN AS EXACT NOR COMPLETE.
THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 24 HOURS
PRIOR TO ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF RESPECTIVE UTILITIES. IT
SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION OF
EXISTING UTILITIES WHICH MAY CONFLICT WITH PROPOSED IMPROVEMENTS. UPC#
1-800-282-7411
3. CONTRACTOR TO COORDINATE WITH POWER COMPANY PROVIDING TEMPORARY SERVICE
DURING CONSTRUCTION IF REQUIRED.
4. CONTRACTOR SHALL ASSURE THAT ALL FINAL INSPECTIONS ARE MADE.
5. SIGNS SHALL BE PERMITTED THROUGH THE CITY/COUNTY AND ARE NOT PART OF THESE
DOCUMENTS
6. A COPY OF THE APPROVED CONSTRUCTION PLANS SHALL BE KEPT ON THE JOB SITE AT ALL
TIMES THAT CONSTRUCTION IS UNDER WAY.
7. IT IS THE DEVELOPER'S RESPONSIBILITY TO COMPLY WITH ALL STATE AND FEDERAL LAWS AND
REGULATIONS THAT APPLY TO THE PROJECT.
8. PRIOR TO ISSUANCE OF A CLEARING AND GRUBBING PERMIT, THE DEVELOPER IS REQUIRED TO
SCHEDULE A PRE-CONSTRUCTION CONFERENCE WITH THE FAYETTE COUNTY. THE PROJECT
DEVELOPER, DESIGN PROFESSIONAL, AND CONTRACTOR ARE REQUIRED TO ATTEND THE
PRE-CONSTRUCTION CONFERENCE.
9. IT IS THE RESPONSIBILITY OF THE DEVELOPER TO ACQUIRE ANY
OFFSITE EASEMENTS BEFORE CONSTRUCTION BEGINS. PERMIT ISSUANCE SHALL OCCUR
AFTER ALL OFF-SITE EASEMENTS ARE OBTAINED. ANY OFF-SITE EASEMENTS FOR PUBLIC AND
UTILITIES USE SHALL BE OBTAINED IN THE NAME OF THE FAYETTE COUNTY.
10. INFORMATION REGARDING UNDERGROUND UTILITIES ON THESE PLANS IS NOT GUARANTEED AS
TO ACCURACY OR COMPLETENESS. PRIOR TO BEGINNING WORK, THE CONTRACTOR SHALL
REQUEST A FIELD LOCATION THROUGH THE UTILITY PROTECTION CENTER AND ANY UTILITY
OWNERS THOUGHT TO HAVE FACILITIES IN THE AREA. THE CONTRACTOR SHALL PROMPTLY
COMPARE THESE FIELD-MARKED LOCATIONS WITH THE PROJECT PLANS AND THEN NOTIFY THE
DESIGN PROFESSIONAL AND, IF NECESSARY, FAYETTE COUNTY OF ANY ANTICIPATED
PROBLEMS OR NEED FOR CHANGES. IT IS THE CONTRACTOR'S RESPONSIBILITY TO EXCAVATE
OR CAUSE THE UTILITY OWNER TO EXCAVATE FOR THE PURPOSE OF DETERMINING EXACT
ELEVATIONS OR LOCATIONS AT UTILITY CROSSINGS AND OTHER CRITICAL LOCATIONS WELL IN
ADVANCE OF THE WORK.
11. IT IS THE RESPONSIBILITY OF THE DEVELOPER AND HIS CONTRACTOR(S) TO COMPLY WITH THE
FAYETTE COUNTY DEVELOPMENT REGULATIONS. ALL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH FAYETTE COUNTY SPECIFICATIONS.
12. IT IS THE DEVELOPER'S RESPONSIBILITY TO NOTIFY THE FAYETTE COUNTY OFFICIALS FOR ALL
REQUIRED INSPECTIONS. A 48 HOUR ADVANCE NOTIFICATION IS REQUIRED PRIOR TO
INSPECTION BY THE FAYETTE COUNTY.
13. GRADING SHALL BE DONE TO SUBGRADE ELEVATION. IT SHOULD BE NOTED THAT FINISH WITH
SURFACE GRADES ARE SHOWN ON THIS PLAN, AND THE CONTRACTOR SHALL MAKE
ALLOWANCES FOR PAVEMENT, STONE, AND SLAB THICKNESSES.
14. ALL FINISHED GRADING AND PAVING SHALL HAVE POSITIVE DRAINAGE.
15. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO OR CONCURRENT WITH LAND
DISTURBING ACTIVITIES.
16. EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES.
ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES AND PRACTICES WILL BE
INSTALLED IF DEEMED NECESSARY BY ONSITE INSPECTION.
17. THE DISTURBED AREA AND THE DURATION OF EXPOSURE TO EROSIVE ELEMENTS SHALL BE
KEPT TO A PRACTICABLE MINIMUM. TEMPORARY VEGETATION OR MULCHING SHALL BE
EMPLOYED TO PROTECT EXPOSED CRITICAL AREAS DURING CONSTRUCTION.
18. PERMANENT VEGETATION SHALL BE ESTABLISHED AS SOON AS PRACTICABLE.
19. CONSTRUCTION EQUIPMENT MUST CROSS FLOWING STREAMS BY MEANS OF BRIDGES OR
CULVERTS EXCEPT WHEN SUCH METHODS ARE NOT FEASIBLE. STREAM CROSSINGS ARE TO BE
KEPT TO A MINIMUM.
20. STREAM BUFFERS ARE MEASURED FROM THE POINT WHERE THE VEGETATION HAS BEEN
WRESTED BY THE NORMAL STREAM FLOW. THE BUFFER AREA SHALL REMAIN UNDISTURBED.
21. ALL CONSTRUCTION SHALL COMPLY WITH THE MANUAL FOR EROSION AND SEDIMENT CONTROL
IN GEORGIA, LATEST EDITION.
22. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION CONTROL PRACTICES, WHETHER
TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE PROPERTY
OWNER.
1. THE FAYETTE COUNTY STANDARD SPECIFICATIONS AND DETAILS SHALL GOVERN ALL WATER
AND SANITARY SEWER MAIN CONSTRUCTION.
2. CONTRACTOR SHALL COORDINATE ANY DISRUPTIONS TO EXISTING UTILITY SERVICES WITH
ADJACENT PROPERTY OWNERS AND IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY
EXISTING UTILITIES DURING CONSTRUCTION AT NO EXTRA COST TO THE OWNER.
3. CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST STANDARDS OR
OSHA DIRECTIVES OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND
TRENCHING PROCEDURES. THE CONTRACTOR SHALL PROVIDE SUPPORT SYSTEMS, SLOPING,
BENCHING, AND OTHER MEANS OF PROTECTION. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING. CONTRACTOR IS RESPONSIBLE
TO COMPLY WITH PERFORMANCE CRITERIA FOR OSHA.
4. THE TOP ELEVATION OF MANHOLES CONSTRUCTED IN PAVED AREAS SHALL MATCH FINISH
GRADE, AND SHALL HAVE TRAFFIC BEARING LIDS. THE TOP ELEVATION OF MANHOLES
CONSTRUCTED IN GRASSED AREAS MUST MATCH FINISHED GRADE (UNLESS OTHERWISE
NOTED). ALL EXISTING MANHOLES AND UTILITY BOXES SHALL BE ADJUSTED AS NECESSARY TO
MATCH PROPOSED GRADING.
5. EXISTING UTILITIES LOCATIONS ARE APPROXIMATE AND SHOULD BE VERIFIED FOR LOCATION
AND NUMBER BY THE CONTRACTOR.
6. ELECTRIC, TELEPHONE AND GAS LINES, INCLUDING SERVICE LINES, ARE TO BE CONSTRUCTED
IN ACCORDANCE WITH THE APPROPRIATE UTILITY COMPANIES SPECIFICATIONS.
7. CONTRACTOR TO COORDINATE INSTALLATION OF ALL UTILITIES BY OTHERS WITH HIS WORK.
8. PRIMARY ELECTRIC SERVICE IS PROVIDED BY THE POWER COMPANY. THIS INCLUDES THE
TRANSFORMER, TRENCHING, AND BACKFILL. TRANSFORMER PAD AND FINAL COMPACTION OF
THE TRENCH IS THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR IS RESPONSIBLE
FOR COORDINATION AND FEES ASSOCIATED WITH POWER SERVICE AS WELL AS SECONDARY
SERVICE.
9. GAS LINES ARE INDICATED FOR COORDINATION ONLY. CONTRACTOR IS RESPONSIBLE FOR
COORDINATION AND FEES ASSOCIATED WITH GAS SERVICE. EXACT LOCATION WILL BE FIELD
DETERMINED DURING CONSTRUCTION.
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
FAYETTE
COUNTY B.O.C.
140 STONEWALL AVE. W,
SUITE 101
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
STORM DRAINAGE NOTES
1. PIPE CONNECTIONS AT C.B.'S, J.B.'S, ETC. SHALL BE GROUTED ON THE OUTSIDE AND INSIDE OF
THE STRUCTURES.
2. TRENCH BACKFILL MATERIAL SHALL BE FREE OF ROOTS, STUMPS, OR OTHER DEBRIS AND SHALL
BE COMPACTED TO 95% STANDARD PROCTOR OR AS PER SPECIFICATIONS.
3. CATCH BASINS, DROP INLETS, AND JUNCTION BOXES SHALL HAVE PAVED INVERTS. MATCHING
LOWEST INVERT & SLOPING UP TO 1/4 PIPE DIA.
4. CONTRACTOR TO NOTIFY ENGINEER IF INVERTS ON OUTLET PIPES DO NOT MATCH EXISTING
ELEVATIONS AS INDICATED ON PLANS.
GRADING NOTES
1. SPOT ELEVATIONS ARE TOP OF PAVEMENT UNLESS OTHERWISE NOTED.
2. CONTOURS ON PAVEMENT ARE TOP OF PAVEMENT.
3. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITIES BEFORE CONSTRUCTION AND
VERIFYING LOCATION OF ALL UTILITIES SHOWN OR NOT SHOWN.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND COST OF THE RELOCATION OF ALL UTILITIES, ALONG THE RIGHT-OF-WAY AND ON SITE, ASSOCIATED WITH THE CONSTRUCTION
OF THIS PROJECT, SUCH AS, BUT NOT LIMITED TO, SIGNAL POLES, SIGNAL CONTROLS,
DRAINAGE STRUCTURES, TRAFFIC SIGNS, UTILITY POLES, GUY WIRES, ETC.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF ALL DEBRIS AS ACCEPTABLE TO THE
OWNER AND ENGINEER AND IN COMPLIANCE WITH ALL FEDERAL, STATE AND LOCAL LAWS.
6. CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING IMPROVEMENTS
DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT,
STRIPING, CURBS, ETC. REPAIRS SHALL BE EQUAL TO OR BETTER THAN EXISTING CONDITIONS.
7. SOIL FROM FOOTINGS IS THE SITE CONTRACTOR'S RESPONSIBILITY. CONTRACTOR IS TO USE
THE SOIL ON SITE OR REMOVE IT FROM SITE.
8. THE EARTHWORK FOR ALL BUILDING FOUNDATIONS AND SLABS SHALL BE IN ACCORDANCE WITH
ARCHITECTURAL PLANS AND SPECIFICATIONS.
9. CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDINGS.
10. SLOPES AND DISTURBED AREAS NOT COVERED BY BUILDING OR PAVEMENT SHALL BE GRADED
SMOOTH AND RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR TO PROVIDE TOPSOIL IF NOT
AVAILABLE ON SITE. THE AREAS SHALL BE SEEDED AND COVERED WITH MATTING AS
DESIGNATED ON PLANS, FERTILIZED AND WATERED TO PROVIDE A HEARTY, MOWABLE STAND
OF GRASS. SMALL ROCKS MUST BE REMOVED. ANY AREAS DISTURBED FOR ANY REASON
PRIOR TO FINAL ACCEPTANCE OF THE PROJECT SHALL BE CORRECTED BY THE CONTRACTOR
AT NO ADDITIONAL COST TO THE OWNER.
11. FILL USED TO INCREASE THE ELEVATION OF THE FLOOR SLAB OR ANY FILL TO BE USED AS BACKFILL SHALL BE CLEAN, GRANULAR MATERIAL. PRIOR TO THE USE OF ANY GRANULAR FILL
GRADATION, ANALYSIS SHALL BE PERFORMED ON REPRESENTATIVE SAMPLES OF THE FILL
MATERIAL TO DETERMINE WHETHER THE MATERIAL IS SUITABLE AS FILL. COMPACTED FILL
SHALL BE PLACED IN LAYERS OF NOT MORE THAN EIGHT INCHES IN THICKNESS, AT MOISTURE
CONTENTS WITHIN THREE PERCENT OPTIMUM, AND COMPACTED TO MINIMUM DENSITY OF 95
PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR
METHOD, ASTM D-1557.
12. EARTHWORK SHALL BE ON AN UNCLASSIFIED BASIS.
13. MAXIMUM SLOPES ON CUT OR FILL SECTIONS SHALL NOT EXCEED 2:1.
14. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT UNDISTURBED
STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST
ACQUIRING THE NECESSARY PERMITS.
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE EXISTING CONDITIONS
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
020 20 40
EXISTING CONDITIONS
(1)
GAGR7591-26020
SHEET OF 14
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
EXISTING 36' WIDE BLACK
RUBBER TOPPED TRACK
TOPOGRAPHIC SURVEY PROVIDED BY LJA ENGINEERING, INC. ON
MARCH 19, 2026.
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
TREE
TREE
TREE
TREE
TREE
TREE
TRACK AND VOLLEY BALL AREA
VOLLEY BALL COURT
PRACTICE FIELD
LEGEND
EXISTING CONCRETE
STEPS WITH RAILING
EXISTING 5' WIDE
CONCRETE SIDEWALK
EXISTING 'NO RUNNING HILLS' SIGN
EXISTING C.O.
EXISTING STADIUM LIGHTING
BENCHMARK
CORNER OF RACING STRIPING
N: 2213745.2849 E: 1279969.0191
ELEV.: 855.96
EXISTING CONCRETE
LANDINGS
EXISTING CONCRETE
SIDEWALK
EXISTING 10' WIDE
CONCRETE SIDEWALK
RESTROOM PAVILION
EXISTING TREELINE
EXISTING TREELINE
EXISTING SAND COURT
EXISTING BUILDING
EXISTING CONDITIONS
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
020 20 40
EXISTING CONDITIONS
(2)
GAGR7591-26020
SHEET OF 14
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
TOPOGRAPHIC SURVEY PROVIDED BY LJA ENGINEERING, INC. ON
MARCH 19, 2026.
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
EXISTING CONCRETE
SIDEWALK (VARIOUS WIDTHS)
EXISTING COURT LIGHTING
TREE
TREE
TREE
TREE
TREE
TREE
BENCHMARK
EXPANSION JOINT OF SIDEWALK
N: 2214169.6210 E: 1279513.7939
ELEV.: 853.51
EXISTING CONCRETE
SIDEWALK
TRACK AND BASKETBALL AREA
BASKETBALL COURT
PRACTICE FIELD
EXISTING 5' WIDE
CONCRETE SIDEWALK
BASKETBALL COURT
PLAYGROUND AREA
EXISTING COURT LIGHTING
TREE
TREE
TREE
EXISTING 5' CHAIN LINK FENCE
EXISTING 8' BLACK
CHAIN LINK FENCE
EXISTING CONCRETE FOOTING
EXISTING CONCRETE FOOTING
EXISTING 3' WIDE BLACK SINGLE
SWING CHAIN LINK GATE
EXISTING 8' BLACK
CHAIN LINK FENCE
EXISTING 3' WIDE BLACK SINGLE
SWING CHAIN LINK GATE
EXISTING
MODULAR WALL
TREE
TREE
EXISTING 36" ROUND INLET
TOP: 855.59
INVERT: 851.78
EXISTING 36" ROUND INLET
TOP: 861.62
INVERT: 857.89
EXISTING 36"
RECTANGULAR INLET
TOP: 854.95
INVERT: UNDETERMINED
RESTROOM
PAVILION
DRIVE TO
PARKING AREA
EXISTING 36' WIDE BLACK
RUBBER TOPPED TRACK
EXISTING CONCRETE
SIDEWALK (VARIOUS WIDTHS)
EXISTING CONCRETE
SIDEWALK (VARIOUS WIDTHS)
EXISTING
RAILROAD TIES
EXISTING PAVILION
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE
LEGEND
EXISTING TREELINE
EXISTING BUILDING
EXISTING TREELINE
EX
IS
TI
N
G T
R
EE
LI
N
E
EXISTING CONCRETE
SIDEWALK (VARIOUS WIDTHS)
DEMOLITION PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
020 20 40
DEMOLITION PLAN
(1)
GAGR7591-26020
SHEET OF 14
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
NOTES
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
1. ALL EXISTING DEBRIS AND DEBRIS CREATED BY CONSTRUCTION
ACTIVITIES TO BE REMOVE FROM THE SITE AND DISPOSED OF LEGALLY.
2. INSTALL ALL INITIAL BMP'S BEFORE ANY WORK IS PERFORMED ON SITE.
3. ALL EXISTING UTILITIES, LIGHTING, CONCRETE WORK AND TRACK
MATERIAL IS TO BE PROTECTED AND NOT TO BE DISTURBED OR
DAMAGED DURING PREPARATION AND REPAIRS TO THE SLOPES.
EROSION
ABNORMALITY
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
EROSION
ABNORMALITY
EROSION
ABNORMALITY
EROSION
ABNORMALITY
EROSION ABNORMALITY
AND SUMP
EROSION ABNORMALITY
AND SUMP
(3) DO NOT DISTURB TREE
ENCOMPASS WITH TREE PROTECTION
DO NOT DISTURB TREE
ENCOMPASS WITH TREE PROTECTION
(2) DO NOT DISTURB TREE
ENCOMPASS WITH TREE PROTECTION
TRACK AND VOLLEY BALL AREA
EXISTING TRACK
VOLLEYBALL COURT
PRACTICE FIELD
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE
LEGEND
EXISTING TREELINE
EXISTING SAND COURT
EXISTING BUILDING
EROSION ABNORMALITY
RESTROOM PAVILION
EXISTING TREELINE
DEMOLITION PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
020 20 40
DEMOLITION PLAN
(2)
GAGR7591-26020
SHEET OF 14
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
NOTES
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
1. ALL EXISTING DEBRIS AND DEBRIS CREATED BY CONSTRUCTION
ACTIVITIES TO BE REMOVE FROM THE SITE AND DISPOSED OF LEGALLY.
2. INSTALL ALL INITIAL BMP'S BEFORE ANY WORK IS PERFORMED ON SITE.
3. ALL EXISTING UTILITIES, LIGHTING, CONCRETE WORK AND TRACK
MATERIAL IS TO BE PROTECTED AND NOT TO BE DISTURBED OR
DAMAGED DURING PREPARATION AND REPAIRS TO THE SLOPES.
EROSION
ABNORMALITY
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
EROSION ABNORMALITY
AND SUMP
(3) DO NOT DISTURB TREES
ENCOMPASS WITH TREE PROTECTION
TRACK AND BASKETBALL AREA
EXISTING TRACK
(2) DO NOT DISTURB TREES
ENCOMPASS WITH TREE PROTECTION
EROSION
ABNORMALITY
EROSION
ABNORMALITY
EROSION
ABNORMALITY
EROSION
ABNORMALITY
(3) DO NOT DISTURB TREES
ENCOMPASS WITH TREE PROTECTION
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE
LEGEND
EXISTING TREELINE
EXISTING SAND COURT
EXISTING BUILDING
EROSION ABNORMALITY
BASKETBALL COURT
BASKETBALL COURT
PLAYGROUND AREA
RESTROOM
PAVILION
DRIVE TO
PARKING AREA
EXISTING TREELINE
EX
IS
TI
N
G T
R
EE
LI
N
E
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
SITE & GRADING PLAN
SITE & GRADING
PLAN
GAGR7591-26020
NOT FOR
CONSTRUCTION
PRINTED:
May 5, 2026
SHEET OF 13
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
TRACK AND VOLLEY BALL AREA
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
EXISTING CONCRETE STEPS
WITH RAILING
NOT TO BE DISTURBED
EXISTING SIDEWALK
NOT TO BE DISTURBED
EXISTING 'NO RUNNING HILLS' SIGN
NOT TO BE DISTURBED
EXISTING TRACK
NOT TO BE DISTURBED
EXISTING C.O.
NOT TO BE DISTURBED
BENCHMARK
CORNER OF RACING STRIPING
N: 2213745.2849 E: 1279969.0191
ELEV.: 855.96
VOLLEY BALL COURT
PRACTICE FIELD
(3) EXISTING TREES TO REMAIN
AND TO BE PROTECTED
(2) EXISTING TREES TO REMAIN
AND TO BE PROTECTED
BACKFILL SUMP AND
PROMOTE DRAINAGE
BACKFILL SUMP AND
PROMOTE DRAINAGE
EROSION STABILIZATION MATTING
PROPOSED CONTOURS MAJOR
PROPOSED CONTOURS MINOR
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE
LEGEND
EXISTING TREELINE
EXISTING SAND COURT
EXISTING BUILDING
EROSION STABILIZATION MATTING
(SEE SHEET 13 FOR MATTING SPECS)
RESTROOM PAVILION
EXISTING TREELINE
EROSION STABILIZATION MATTING
EROSION STABILIZATION MATTING
±450 S.F.
15' X 30'
±675 S.F.
15' X 45'
±675 S.F.
15' X 45'
±675 S.F.
15' X 45'
±675 S.F.
15' X 45'
±675 S.F.
15' X 45' ±615 S.F.
15' X 41' ±240 S.F.
15' X 16'
±375 S.F.
15' X 25' ±420 S.F.
15' X 28' ±480 S.F.
15' X 28'
±525 S.F.
15' X 35'
±645 S.F.
15' X 43'
±645 S.F.
15' X 43'
±296 S.F.15' X 42'
EXISTING TREE TO REMAIN
AND TO BE PROTECTED
±630 S.F.15' X 42' ±525 S.F.15' X 35'
±525 S.F.15' X 35' ±525 S.F.15' X 35' ±390 S.F.15' X 26' ±315 S.F.15' X 21' ±315 S.F.15' X 21'
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
SITE & GRADING PLAN
SITE & GRADING
PLAN (2)
GAGR7591-26020
NOT FOR
CONSTRUCTION
PRINTED:
May 5, 2026
SHEET OF 13
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
TRACK AND BASKETBALL AREA
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
EXISTING COURT LIGHTING
NOT TO BE DISTURBED
BASKETBALL COURT
PRACTICE FIELD
EXISTING CONCRETE SIDEWALK
NOT TO BE DISTURBED
BASKETBALL COURT
EXISTING 5' CHAIN LINK FENCE
NOT TO BE DISTURBED
EXISTING 36" ROUND INLET
TOP: 855.59
INVERT: 851.78
EXISTING 36"
RECTANGULAR INLET
TOP: 854.95
INVERT: UNDETERMINED
RESTROOM
PAVILION
DRIVE TO
PARKING AREA
EXISTING
RAILROAD TIES
EXISTING PAVILION
NOT TO BE DISTURBED
(3) EXISTING TREES TO
REMAIN AND BE PROTECTED (2) EXISTING TREES TO
REMAIN AND BE PROTECTED
(2) EXISTING TREES TO
REMAIN AND BE PROTECTED
BENCHMARK
EXPANSION JOINT OF SIDEWALK
N: 2214169.6210 E: 1279513.7939
ELEV.: 853.51
START 6" CONCRETE ROLLED
CURB
EXISTING 36" ROUND INLET
TOP: 861.62
INVERT: 857.89
END 6" CONCRETE ROLLED CURB
(3) EXISTING TREES TO
REMAIN AND BE PROTECTED
PLAYGROUND AREA
EROSION STABILIZATION MATTING
PROPOSED CONTOURS MAJOR
PROPOSED CONTOURS MINOR
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE
LEGEND
EXISTING TREELINE
EXISTING SAND COURT
EXISTING BUILDING
EROSION STABILIZATION MATTING
(SEE SHEET 13 FOR MATTING SPECS)
EXISTING TREELINE
EX
IS
TI
N
G T
R
EE
LI
N
E
EROSION STABILIZATION
MATTING
EROSION STABILIZATION
MATTING
±375 S.F.
15' X 25'
±375 S.F.
15' X 25'
±375 S.F.
15' X 25'
±375 S.F.
15' X 25'
±375 S.F.
15' X 25'
±375 S.F.
15' X 25'
±525 S.F.
15' X 35'
±375 S.F.
15' X 25'
±375 S.F.
15' X 25'
±330 S.F.
15' X 22'
±330 S.F.
15' X 22' ±360 S.F.15' X 24'
ES&PC DETAILS (1)
GAGR7591-26020
SHEET OF 13
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
TOTAL AREA OF SITE: 169.19 ACRES
TOTAL DISTURBED AREA: 0.95 ACRES
THE RECEIVING WATERS FOR THIS SITE IS CAMP CREEK. AS PER FLOOD INSURANCE RATE MAP NUMBERS 13113C 0039 E DATED SEPTEMBER 26, 2008 AND 13113C 0043 E DATED SEPTEMBER 26, 2008. THIS SITE DOES
NOT LIE WITHIN A FLOOD HAZARD AREA.
STORM WATER FROM THIS SITE DOES NOT DISCHARGE INTO AN IMPAIRED STREAM SEGMENT, OR WITHIN 1 LINEAR MILE UPSTREAM OF AND WITHIN THE SAME WATERSHED AS, ANY PORTION OF A BIOTA IMPAIRED
STREAM SEGMENT.
NO STATES WATERS OR WETLANDS ARE LOCATED WITHIN 200' OF THIS SITE.
LOCATED IN LANDLOT 249 OF THE 5 & 13 DISTRICT, FAYETTE COUNTY, GEORGIA
NOT FOR
CONSTRUCTION
PRINTED:
May 5, 2026
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
Ds1
SPECIES
MILLET, PEARL
ACRE
(PENNESETUM GLAUCUM)
PER
1000 SQ. FT.
PER
RATES 2/ - PLS 3/
BROADCAST
AREA
RESOURCE
N
OPTIMUM
PERMISSIBLE BUT MARGINAL
OSAJJMAMFJ D
M-L P C
REMARKS
AREA PLANTING DATES
PLANTING RATES BY RESOURCE
ALONE 50 LBS 1.1 LB
RYEGRESS, ANNUAL
(LOLIUM TEMULENTUM)
M-L P
CALONE 40 LBS 0.9 LB
SUDANGRASS
(SORGHUM SUDANESE)
M-L P
CALONE 60 LBS 1.4 LB
MILLET, BROWNTOP
(PANICUM FASCICULATUM)
M-L P
CIN MIXTURES 10 LBS 0.2 LB
ALONE 40 LBS 0.9 LB
* REVISED 7/01 PER 5TH EDITION OF MANUAL FOR EROSION & SEDIMENT CONTROL IN GEORGIA.
SPECIFICATIONS
A. GRADING AND SHAPING
1. EXCESSIVE WATER RUNOFF MUST BE CONTROLLED BY PLANNED AND INSTALLED EROSION CONTROL PRACTICES SUCH AS CLOSED DRAINS, DITCHES, DIKES, DIVERSIONS, SEDIMENT BASINS AND OTHERS.
B. SEEDBED PREPARATION
1. WHEN A HYDRAULIC SEEDER IS USED, SEEDBED PREPARATION IS NOT REQUIRED.
2. WHEN USING CONVENTIONAL OR HAND-SEEDING, SEEDBED PREPARATION IS NOT REQUIRED IF THE SOIL MATERIAL IS LOOSE AND NOT
SEALED BY RAINFALL.
3. WHEN SOIL HAS BEEN SEALED BY RAINFALL OR CONSISTS OF SMOOTH UNDISTURBED CUT SLOPES, THE SOIL SHALL BE PITTED, TRENCHED, OR OTHERWISE SCARIFIED TO PROVIDE A PLACE FOR SEED TO LODGE AND GERMINATE.
C. LIME AND FERTILIZER
1. AGRICULTURAL LIME IS REQUIRED UNLESS SOIL TESTS INDICATE OTHERWISE. ALL GRADED AREAS REQUIRE LIME APPLICATION.
2. ON REASONABLY FERTILE SOILS OR SOIL MATERIAL, FERTILIZER IS NOT REQUIRED IF VERIFIED BY SOIL ANALYSIS .
3. ON SOILS OF VERY LOW FERTILITY, USE 500 TO 700 POUNDS 10-10-10 FERTILIZER OR THE EQUIVALENT PER ACRE (12-16 LBS/1000 SQ. FT.).
IF THE SITE WILL PERMIT, APPLY BEFORE LAND PREPARATION AND DISK, RIP, OR CHISEL TO INCORPORATE.
D. SEEDING
1. SELECT A GRASS OR GRASS-LEGUME MIXTURE SUITABLE TO THE AREA AND SEASON OF THE YEAR.
2. APPLY SEED UNIFORMLY BY HAND, CYCLONE SEEDER, DRILL, CULTIPACKER-SEEDER, OR HYDRAULIC SEEDER (SLURRY INCLUDING SEED
AND FERTILIZER). DRILL OR CULTIPACKER-SEEDERS SHOULD NORMALLY PLACE SEED ONE-HALF TO ONE INCH DEEP.
E. MULCHING
1. TEMPORARY VEGETATION CAN, IN MOST CASES, BE ESTABLISHED WITHOUT THE USE OF MULCH. MULCH WITHOUT SEEDING SHOULD BE
CONSIDERED FOR SHORT TERM PROTECTION. SEE Ds1 - DISTURBED AREA STABILIZATION (WITH MULCHING ONLY).
F. IRRIGATION
1. IF WATER IS APPLIED, IT MUST BE AT A RATE NOT CAUSING RUNOFF AND EROSION. THOROUGHLY WET THE SOIL TO A DEPTH THAT WILL
INSURE GERMINATION OF THE SEED. SUBSEQUENT APPLICATIONS SHOULD BE MADE WHEN NEEDED.
Ds2 DISTURBED AREA STABILIZATION
(WITH TEMPORARY SEEDING)
88,000 SEED PER POUND.
QUICK DENSE COVER.
MAY REACH 5 FEET IN HEIGHT. NOT
RECOMMENDED FOR MIXTURES.
227,000 SEED PER POUND. DENSE
COVER.
VERY COMPETITIVE AND IS NOT TO
BE USED IN MIXTURES.
55,000 SEED PER POUND.
GOOD ON DROUGHTY SITES.
NOT RECOMMENDED FOR MIXTURES.
137,000 SEED PER POUND. QUICK
DENSE COVER. WILL PROVIDE TOO
MUCH COMPETITION IN MIXTURES IF
SEEDED AT HIGH RATES.
SPECIES
BERMUDA, COMMON
ACRE
(CYNODON DACTYLON)
PER
1000 SQ. FT.
PER
RATES 2/ - PLS 3/
BROADCAST
AREA
RESOURCE
N
OPTIMUM
PERMISSIBLE BUT MARGINAL
OSAJJMAMFJ D
REMARKS
AREA PLANTING DATES
PLANTING RATES BY RESOURCE
ALONE
HULLED SEED
WITH OTHER PERENNIALS
BERMUDA, COMMON
(CYNODON DACTYLON)
PLANT WITH WINTER ANNUALS.WITH TEMPORARY COVER
UNHULLED SEED
WITH OTHER PERENNIALS PLANT WITH TALL FESCUE.
CENTIPEDE
(EREMOCHLOA
OPHIUROIDES)
FESCUE, TALL
(FESTUCA ARUNDINACEA)
ALONE
WITH OTHER PERENNIALS
LESPEDEZA, SERICEA
(LESPEDEZA CUNEATA)
SCARIFIED
UNSCARIFIED
SEED-BEARING HAY
LOVEGRASS, WEEPING
(ERAGROSTIS CURVULA)
ALONE
WITH OTHER PERENNIALS
* REVISED 7/01 PER 5TH EDITION OF MANUAL FOR EROSION & SEDIMENT CONTROL IN GEORGIA.
Ds3 DISTURBED AREA STABILIZATION
(WITH PERMANENT SEEDING)
SPECIFICATIONS
A. GRADING AND SHAPING
1. GRADING AND SHAPING IS NOT NORMALLY REQUIRED WHERE HYDRAULIC SEEDING AND FERTILIZING EQUIPMENT IS TO BE USED. VERTICAL
BANKS SHALL BE SLOPED TO ENABLE PLANT ESTABLISHMENTS.
B. SEEDBED PREPARATION
1. SEEDBED PREPARATION MAY NOT BE REQUIRED WHERE HYDRAULIC SEEDING AND FERTILIZING EQUIPMENT IS TO BE USED.
2. WHEN CONVENTIONAL SEEDING IS TO BE USED, SEEDBED PREPARATION WILL BE DONE AS FOLLOWS:
A. BROADCAST PLANTING
1. TILLAGE AT A MINIMUM, SHALL ADEQUATELY LOOSEN THE SOIL TO A DEPTH OF 4 TO 6 INCHES; ALLEVIATE COMPACTION;
INCORPORATE LIME AND FERTILIZER; SMOOTH AND FIRM THE SOIL; ALLOW FOR THE PROPER PLACEMENT OF SEED SPRIGS, OR PLANTS; AND ALLOW FOR THE ANCHORING OF STRAW OR HAY MULCH IF A DISK IS TO BE USED.
C. LIME AND FERTILIZER -- RATES AND ANALYSIS
1. WHERE PERMANENT VEGETATION IS TO BE ESTABLISHED, AGRICULTURAL LIME SHALL BE APPLIED AS INDICATED BY SOIL TEST OR AT THE
RATE OF 1 TO 2 TONS PER ACRE. AGRICULTURAL LIME SHALL BE WITHIN THE SPECIFICATIONS OF THE GEORGIA DEPARTMENT OF
AGRICULTURE.
2. LIME SPREAD BY CONVENTIONAL EQUIPMENT WILL BE "GROUND LIMESTONE". GROUND LIMESTONE IS CALCITIC OR DOLOMITIC LIMESTONE GROUND SO THT 90 PERCENT OF THE MATERIAL WILL PASS THROUGH A 10-MESH SIEVE AND NOT LESS THAN 25 PERCENT WILL PASS
THROUGH A 100-MESH SIEVE.
3. AGRICULTURAL LIME SPREAD BY HYDRAULIC SEEDING EQUIPMENT WILL BE "FINELY GROUND LIMESTONE". FINELY GROUND LIMESTONE IS CALCITIC OR DOLOMITIC LIMESTONE GROUND SO THAT 98 PERCENT OF THE MATERIAL WILL PASS THROUGH A 20-MESH SIEVE AND NOT
LESS THAN 70 PERCENT WILL PASS THROUGH A 100-MESH SIEVE.
D. LIME FERTILIZER -- APPLICATION
1. WHEN HYDRAULIC SEEDING EQUIPMENT IS USED:
A. THE INITIAL FERTILIZER WILL BE MIXED WITH SEED, INOCULANT (IF NEEDED) AND WOOD CELLULOSE OR WOOD PULP FIBER MULCH AND APPLIED IN A SLURRY. THE SLURRY WILL BE AGITATED DURING APPLICATION TO KEEP THE INGREDIENTS THOROUGHLY MIXED. THE MIXTURE WILL BE SPREAD UNIFORMLY OVER THE AREA WITHIN ONE HOUR AFTER BEING PLACED IN THE HYDROSEEDER.
B. FINELY GROUND LIMESTONE WILL BE MIXED WITH WATER AND APPLIED IMMEDIATELY AFTER MULCHING IS COMPLETED OR IN
COMBINATION WITH THE TOP DRESSING.
2. WHEN CONVENTIONAL PLANTING IS TO BE DONE, LIME AND FERTILIZER WILL BE APPLIED UNIFORMLY IN ONE OF THE FOLLOWING WAYS:
A. APPLY BEFORE LAND PREPARATION SO THAT IT WILL BE MIXED WITH THE SOIL DURING SEEDBED PREPARATION; OR, B. MIX WITH THE SOIL USED TO FILL THE HOLES, DISTRIBUTE IN FURROWS; OR
C. BROADCAST AFTER STEEP SURFACES AND SCARIFIED, PITTED OR TRENCHED.
D. A FERTILIZER PELLET WILL BE PLACED AT ROOT DEPTH.
1,500,000 SEED PER POUND. QUICK
COVER. DROUGHT TOLERANT. GROWS
WELL WITH SERICEA LESPEDEZA ON
ROADBANKS.
CUT WHEN SEED IS MATURE. BUT
BEFORE IT SHATTERS. TALL FESCUE
OR WINTER ANNUALS.
MIX WITH TALL FESCUE OR WINTER
ANNUALS.
350,000 SEED PER POUND. WIDELY
ADAPTED. LOW MAINTENANCE. MIX
WITH WEEPING LOVEGRASS, COMMON
BERMUDA, BAHIA, OR TALL FESCUE.
TAKES 2 TO 3 YEARS TO BECOME FULLY
ESTABLISHED. EXCELLENT ON ROAD
BANKS. INOCULATE SEED WITH EL
INOCULANT.
227,000 SEED PER POUND. USE ALONE
ONLY ON BETTER SITES. NOT FOR
DROUGHTY SOILS. MIX WITH PERENNIAL
LESPEDEZAS OR CROWNVETCH. APPLY
TOPDRESSING IN SPRING FOLLOWING
FALL PLANTINGS. NOT FOR HEAVY USE
AREAS OR ATHLETIC FIELDS.
DROUGHT TOLERANT. FULL SUN OR
PARTIAL SHADE. EFFECTIVE ADJACENT
TO CONCRETE AND IN CONCENTRATED
FLOW AREAS. IRRIGATION AS NEEDED
UNTIL FULLY ESTABLISHED. DO NOT
PLANT NEAR PASTURES. WINTERHARDY
AS FAR NORTH AS ATHENS AND
ATLANTA.
1,787,000 SEED PER POUND. QUICK
COVER.
LOW GROWING AND SOD FORMING.
FULL SUN.
GOOD FOR ATHLETIC FIELDS.
MULCHING
ONE OR TWO TONS PER ACRE OR AS INDICATED BY SOIL TESTING.
AGRICULTURAL LIME RATES
60-90
60-90
60-90
60-90
60-90
60-90
36-48
SECOND
SERICEA LESPEDEZA SEED HAY
CLEAN COMBINE RUN
TALL FESCUEGRASS
UNHULLED COMMON BERMUDAGRASS
HULLED COMMON BERMUDAGRASS
AND
AND
FIRST
SECOND
FIRST
SECOND
FIRST
SECOND
SERICEA LESPEDEZA SEEDBEARING HAY
OVERSEEDED WEEPING LOVEGRASS
HULLED COMMON BERMUDAGRASS
WEEPING LOVEGRASS AND
AND
WITH
SPECIES
FIRST
SECOND
SECOND
FIRST
YEARS TO
APPLY
FERTILIZE
FIRST
70-1000 70-100
70-100
120-180
70-100
120-180
120-180
120-180
72-96
120-180
70-100
120-180
70-1000
72-96
IN SPRING
0-50
FERTILIZER RATES - POUNDS PER ACRE
120-180
70-100
70-100
120-180
120-180
120-180
70-100
70-100
120-180
120-180
N
N TOP-
DRESSING
10 LB OF 6-12-12 PER 100' OF ROW
3 LB OF 0-14-14 PER 100' OF ROW
SHRUB LESPEDEZA PLANTS FIRST
SECOND
60-90
36-48
60-90
36-48
36-48
60-90
60-90
60-90
36-48
WILMINGTON BAHIAGRASS
PENSACOLA BAHIAGRASS
TALL FESCUE GRASS
MIDLAND OR COMMON BERMUDAGRASS
COASTAL OR COMMON BERMUDAGRASS
SPRIGS OR SOD PLUGS
SPRIGS OR SOD PLUGS
(USE ON BETTER SITES) SECOND
FIRST
SECOND
FIRST
SECOND
SECOND
FIRST
FIRST
FIRST
SECOND
120-180
120-180
120-180
120-180
120-180
72-96
120-180
120-180
120-180
72-96
72-96
IN SPRING
72-96
72-96
72-96
120-180120-180
72-96 72-96
50-100
50-100
50-10014
50-10014
50-10014
50-10014
50-10014
50-10014
50-10014
DRY STRAW MULCH AT A RATE OF TWO TONS PER ACRE FOR PERMANENT
VEGETATION WITHIN 24 HOURS AFTER SEEDING.
K2OP205
VIRGATA OR SERICEA LESPEDEZA19 SCARIFIED
VIRGATA OR SERICEA LESPEDEZA19
UNHULLED COMMON BERMUDAGRASS18
VIRGATA OR SERICEA LESPEDEZA19
Du Du
Ds3 Ds3
Ds2 Ds2
Ds1 Ds1
Co Co
Sd1
Sd2
STRUCTURAL PRACTICES
CODE PRACTICE DETAIL DESCRIPTIONMAP
SYMBOL
CODE PRACTICE DETAIL DESCRIPTION MAP
SYMBOL
VEGETATIVE PRACTICES
Ss Ss
Tr
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
ACTIVITY SCHEDULE
THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL
MEASURES AND PRACTICES PRIOR TO LAND-DISTURBING ACTIVITIES.
EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION CONTROL PRACTICES, WHETHER TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE PROPERTY OWNER.
MONTH
INITIAL PERIMETER
AND SEDIMENT
STORAGE BMP's
MONTH 2MONTH 1 MONTH 3 MONTH 5MONTH 4 MONTH 6
CLEARING AND
GRUBBING
EROSION CONTROL
DEVICES
GRADING
TEMPORARY
VEGETATION
INFRASTRUCTURE
CONSTRUCTION
(INCL. UTILITIES)
FINE GRADING &
LANDSCAPING
PERMANENT
VEGETATION
REMOVE TEMP.
EROSION CONTROL
MAINTENANCE
OF BMP's
METHODS AND MATERIALS
A. TEMPORARY METHODS:
MULCHES:
SEE STANDARD Ds1 - DISTURBED AREA STABILIZATION (WITH MULCHING ONLY). SYNTHETIC RESINS MAY BE USED INSTEAD OF ASPHALT TO BIND MULCH MATERIAL. REFER TO SPECIFICATION Tac - TACKIFIERS. RESINS SHOULD BE USED ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
VEGETATIVE COVER:
SEE SPECIFICATION Ds2 - DISTURBED AREA STABILIZATION (WITH TEMPORARY SEEDING).
SPRAY-ON ADHESIVES:
THESE ARE USED ON MINERAL SOILS (NOT EFFECTIVE ON MUCK SOILS). KEEP TRAFFIC OFF THESE AREAS. REFER TO SPECIFICATION Tac - TACKIFIERS.
TILLAGE:
THIS PRACTICE IS DESIGNED TO ROUGHEN AND BRING CLODS TO THE SURFACE. IT IS AN
EMERGENCY MEASURE WHICH SHOULD BE USED BEFORE WIND EROSION STARTS. BEGIN
PLOWING ON WINDWARD SIDE OF SITE. CHISEL-TYPE PLOWS SPACED ABOUT 12-INCHES APART, SPRING-TOOTHED HARROWS, AND SIMILAR PLOWS ARE EXAMPLES OF EQUIPMENT WHICH MAY
PRODUCE THE DESIRED EFFECT.
IRRIGATION:
THIS IS GENERALLY DONE AS AN EMERGENCY TREATMENT. SITE IS SPRINKLED WITH WATER UNTIL
THE SURFACE IS WET. REPEAT AS NEEDED.
BARRIERS:
SOLID BOARD FENCES, SNOWFENCES, BURLAP FENCES, CRATE WALLS, BALES OF HAY AND
SIMILAR MATERIAL CAN BE USED TO CONTROL AIR CURRENTS AND SOIL BLOWING. BARRIERS
PLACED AT RIGHT ANGLES TO PREVAILING CURRENTS AT INTERVALS OF ABOUT 15-TIMES THEIR
HEIGHT ARE EFFECTIVE IN CONTROLLING WIND EROSION.
CALCIUM CHLORIDE:
APPLY AT RATE THAT WILL KEEP SURFACE MOIST. MAY NEED RETREATMENT.
B. PERMANENT METHODS:
PERMANENT VEGETATION:
SEE SPECIFICATION Ds3 - DISTURBED AREA STABILIZATION (WITH PERMANENT VEGETATION).
EXISTING TREES AND LARGE SHRUBS MAY AFFORD VALUABLE PROTECTION IF LEFT IN PLACE.
TOPSOILING:
THIS ENTAILS COVERING THE SURFACE WITH LESS EROSIVE SOIL MATERIAL. SEE SPECIFICATION Tp - TOPSOILING.
STONE:
COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. SEE SPECIFICATION Cr -
CONSTRUCTION ROAD STABILIZATION.
Du DUST CONTROL
ON DISTURBED AREAS
ES&PC DETAILS (2)
GAGR7591-26020
SHEET OF 28
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
NOT FOR
CONSTRUCTION
PRINTED:
May 5, 2026
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
CONCRETE WASHOUT DETAIL
N.T.S.
COVER WASH OUT AREA WITH PLASTIC
MATTING OVER ENTIRE WASHOUT. PLASTIC
TO BE MINIMUM OF 10 MIL THICKNESS
#3 BARS REINFORCING
THE BALES
12' X 12' CONCRETE
WASHOUT CONTAINMENT
AREA
HAYBALES
PROVIDE GRAVEL CONSTRUCTION EXIT
TO MAINTAIN APPROACH
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE
DRAINAGE.
3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE).
4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED
SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL
DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT.
10.MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP
DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
FLOW
FLOW
ENTRANCE ELEVATION
CULVERT UNDER
ENTRANCE (IF NEEDED)
DIVERSION RIDGE
(SEE NOTE 6)
N.S.A. R-2 (1.5" - 3.5")
COARSE AGGREGATE
GEOTEXTILE UNDERLINER
TIRE WASHRACK AREA/
TIRE WASHERS
SUPPLY WATER
TO WASH WHEELS
IF NECESSARY
ORIGINAL GRADE
6OZ / SY. GEOTEXTILE
NON-WOVEN UNDERLINER
N.S.A. R-2 (1.5" - 3.5")
COARSE AGGREGATE
HARD SURFACE PUBLIC ROAD
SEDIMENT TRAP
(SEE NOTE 8)
CONSTRUCTION EXIT DETAIL
SILT FENCE - TYPE NON-SENSITIVE
SIDE VIEW
FRONT VIEW
NON-SENSITIVE SEDIMENT BARRIER DETAIL
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
EXCAVATED INLET PROTECTION
CURB INLET PROTECTION
TYPE "C" SILT FENCE
WITH WIRE FENCE BACKING
48" STEEL FENCE POSTS
FINISHED GRADE
EXCAVATE AND RE-
COMPACT EARTH
CATCH BASIN TOP
GUTTER
8" CMU WRAPPED
IN FILTER FABRIC
CATCH BASIN TOP
CURBING
GUTTER
DROP INLET TOPSURFACE AT GRADE
DROP INLET PROTECTION
FILTER SOCK WITH
CONCRETE BLOCKING
INLET SEDIMENT TRAP
INLET SEDIMENT TRAP
8" CMU WRAPPED
IN FILTER FABRIC
TYPICAL INSTALLATION GUIDELINES FOR ROLLED
EROSION CONTROL PRODUCTS (RECP)
BLANKET AND MATTING CROSS-SECTIONS
UPSTREAM TERMINAL TRANSVERSE CHECK SLOT DOWNSTREAM TERMINAL
SEQUENTIAL ROLL RUN OUT IN CHANNELS PICTORAL VIEW OF TRANSVERSE SLOT
STEP 1: CUT TERMINAL SLOT.
STEP 2: SNUG MAT INTO SLOT.
STEP 3:
A. STAKE MAT INTO SLOT.
B. USE 1" X 3" PRESSURE TREATED BOARD
TO SPACE MAT AGAINST VERTICAL CUT.
C. BACKFILL AND COMPACT.
STEP 4:
A. REVERSE MAT ROLL DIRECTION TO
OVERLAY CHECK LOT.
B. STAKE MAT TO ANCHOR TERMINAL.
STEP 1: CUT
CHECK SLOT.
STEP 2: WORK UPSTREAM ACROSS CHECK
SLOT AND LAP BACK 15".
STEP 3: TUCK MAT LAP INTO SLOT AND
STAKE.
STEP 4:
A. BACKFILL AND PROGRESS UPSTREAM
B. PULL OUT TEMPORARY STAKES WHEN NO
LONGER NEEDED FOR TENSIONING.
STEP 1: CUT TERMINAL
SLOT.
STEP 2: STAKE MAT
INTO SLOT.
STEP 3:
BACKFILL TERMINAL
SLOT.
STEP 4:
A. ROLL MAT UP-
STREAM OVER REFILLED TERMINAL.
B. STAKE MAT DOWN TO ANCHOR
TERMINAL.
C. PROGRESS UPSTREAM WITH ROLL.
TEMPORARILY STAKE MAT UNDER
MODERATE TENSION.
NOTES:
1. MATTING TO BE GREEN EXCELSIOR NET MATTING OR APPROVED EQUIVALENT
STRAW/COCONUT MATTING.
2. START AT DOWNSTREAM TERMINAL AND PROGRESS UPSTREAM.
3. FIRST ROLL IS CENTERED LONGITUDINALLY IN MID-CHANNEL AND PINNED
WITH TEMPORARY STAKES TO MAINTAIN ALIGNMENT.
4. SUBSEQUENT ROLLS FOLLOW IN STAGGERED SEQUENCE BEHIND THE FIRST
ROLL. USE THE CENTER ROLL FOR ALIGNMENT TO THE CHANNEL CENTER.
5. WORK OUTWARDS FROM THE CHANNEL CENTER TO THE EDGE.
6. USE 3" OVERLAPS AND STAKE AT 5' INTERVALS ALONG THE SEAMS.
7. USE 3' OVERLAPS AND SHINGLE DOWNSTREAM TO CONNECT THE LINING AT
THE ROLL ENDS.
SLOPE STABILIZATION DETAIL
N.T.S.
CHAIN LINK FENCE DETAIL
Tr TREE PROTECTION
LOD
LOD
LOD
LO
D
LO
D
LODLODLOD
LO
D
LO
D
LO
D LOD LOD LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LO
D
EROSION, SEDIMENT & POLLUTION CONTROL PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
ES&PC PLAN (1)
GAGR7591-26020
SHEET OF 13
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
DESCRIPTION OF
EROSION CONTROL MEASURES
INITIAL PHASE:
1. CONTRACTOR TO INSTALL A CONSTRUCTION EXIT PER THE DETAIL
WITHIN THIS DRAWING SET (SHEET 10).
2. INSTALL PERIMETER SILT FENCING.
3. CONTRACTOR TO INSTALL TREE PROTECTION AROUND ALL TREES
WITHIN DISTURBED AREA.
4. DURING THE INITIAL PHASE OF CONSTRUCTION SHOULD ANY
AREAS BE LEFT DISTURBED FOR MORE THAN 14 DAYS THEY
SHOULD BE MULCHED AND TEMPORARILY GRASSED.
5. PROVIDE PERIODIC WETTING OF THE SITE DURING DRY MONTHS TO
PREVENT DUST FROM LEAVING THE SITE.
INTERMEDIATE PHASE:
6. CONTRACTOR TO INSTALL SLOPE STABILIZATION ON ALL SLOPES.
7. PERIMETER SILT FENCING AND TREE PROTECTION INSTALLED
DURING INITIAL PHASE IS TO BE MAINTAINED.
8. DURING THE INTERMEDIATE PHASE OF CONSTRUCTION SHOULD
ANY AREAS BE LEFT DISTURBED FOR MORE THAN 14 DAYS THEY
SHOULD BE MULCHED AND TEMPORARILY GRASSED.
9. PROVIDE PERIODIC WETTING OF THE SITE DURING DRY MONTHS TO
PREVENT DUST FROM LEAVING THE SITE.
FINAL PHASE:
1. CONTRACTOR TO MAINTAIN PERIMETER SILT FENCING.
2. CONTRACTOR SHALL PROVIDE PERMANENT GRASSING FOR FINAL
STABILIZATION OF ALL DISTURBED AREAS.
3. REMOVE SILT FENCE, TREE PROTECTION, AND CONSTRUCTION
ENTRANCE AFTER CONSTRUCTION IS COMPLETE AND ONCE FINAL
GRASSING IS ESTABLISHED.
4. AFTER CONSTRUCTION IS COMPLETE OWNER SHALL MAINTAIN
DETENTION POND PER THE OPERATION AND MAINTENANCE PLAN.
5. MAINTAIN PERMANENT GRASSING OVER ENTIRE SITE.
NOT FOR
CONSTRUCTION
PRINTED:
May 5, 2026
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
Ds3Ds2 DuDs1 1. REMOVE TREE PROTECTION ONCE
GRASSING IS ESTABLISHED.
2. REMOVE SILT FENCE WHEN GRASSING IS
ESTABLISHED.
3. REMOVE CONSTRUCTION EXIT ONCE
GRADING IS COMPLETE
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
TRACK AND VOLLEY BALL AREA
EXISTING TRACK
BENCHMARK
CORNER OF RACING STRIPING
N: 2213745.2849 E: 1279969.0191
ELEV.: 855.96
VOLLEYBALL COURT
PRACTICE FIELD
LIMITS OF DISTURBANCE
0.14 ACRES
LIMITS OF DISTURBANCE
0.34 ACRES
Ds3Ds2 DuDs1
Ds3Ds2 DuDs1
Ds3Ds2 DuDs1
Ss Ss Ss Ss
Ss
Ss
Tr Tr Tr
Tr Tr
Tr
TRACK AND VOLLEYBALL AREA
DISTURBED AREA A - 0.34 ACRES
DISTURBED AREA B - 0.14 ACRES
TRACK AND BASKETBALL AREA
DISTURBED AREA C - 0.22 ACRES
DISTURBED AREA D - 0.25 ACRES
TOTAL DISTURBED AREA
0.95 ACRES
LIMITS OF DISTURBANCELOD
SILT FENCE
SD1-NS
SD1-NS
SD1-NS
SD1-NS
EROSION STABILIZATION MATTING
PROPOSED CONTOURS MAJOR
PROPOSED CONTOURS MINOR
EXISTING CONTOURS MAJOR
EXISTING CONTOURS MINOR
EXISTING CONCRETE SIDEWALK
EXISTING BLACK TRACK
EXISTING FENCE
LEGEND
EXISTING TREELINE
EXISTING SAND COURT
EXISTING BUILDING
EROSION ABNORMALITY
EROSION STABILIZATION MATTING
(SEE SHEET 13 FOR MATTING SPECS)
RESTROOM PAVILION
EXISTING TREELINE
EROSION STABILIZATION MATTING
EROSION STABILIZATION MATTING
EROSION STABILIZATION MATTING
SOLMAX PROPEX PYRAMAT 75 FOR SLOPES
HYDROSEED
1. AFTER CONDUCTING A SITE SPECIFIC SOIL TEST, SELECT AND APPLY
RECOMMENDED SOIL AMENDMENTS TO THE SOIL SURFACE AND THE
LOOSEN/SCARIFY THE TOP 2 TO 3 IN (50 TO 75 MM) OF THE SOIL SURFACE.
2. SOW 25% - 35% OF THE TOTAL PERMANENT SEED MIXTURE TO PREPARED
SEEDBED. NOTE THIS SEED AMOUNT IS IN ADDITION TO THE 100% TOTAL SEED
MIXTURE BEING APPLIED IN STEP 5.
3. INSTALL THE PROPEX PYRAMAT.
4. SOIL-FILL THE PROPEX PYRAMAT WITH 1-2 IN (25-50 MM) OF AMENDED
TOPSOIL OR FILL WITH A BIOTIC SOIL MEDIA.
DO NOT PLACE EXCESSIVE SOIL ABOVE THE PROPEX PYRAMAT MATERIAL.
5. APPLY 100% OF THE TOTAL PERMANENT SEED MIXTURE ONTO THE
TOPSOIL/ BIOTIC MEDIA WITH A HYDROSEED MIXTURE THAT CONTAINS
THE SOIL AMENDMENTS AND A TACKIFIER OR WITH A BONDED FIBER MATRIX
MIXTURE PER MANUFACTURER’S RECOMMENDATIONS.
6. OPTIONAL STEP FOR ADDITIONAL PROTECTION: INSTALL SURFICIAL
PROTECTION WITH PROPEX LANDLOK S2 EROSION CONTROL BLANKET (ECB).
7. IRRIGATE AS NECESSARY TO ESTABLISH AND MAINTAIN VEGETATION UNTIL
THE DESIRED VEGETATED DENSITY HAS BEEN ACHIEVED. FREQUENT, LIGHT
IRRIGATION WILL NEED TO BE APPLIED TO SEEDED AREAS IF NATURAL RAIN
EVENTS HAVE NOT OCCURRED WITHIN TWO WEEKS OF SEEDING. WHEN
WATERING SEEDED AREAS, USE A FINE SPRAY TO PREVENT EROSION OF SEEDS
OR SOIL. DO NOT OVER IRRIGATE. PROPER IRRIGATION GUIDANCE IS PROVIDED
UNDER THE MAINTENANCE PORTION OF THIS DOCUMENT.
SOLMAX - PROPEX PYRAMAT FOR SLOPES - INSTALLATION GUIDE - 0225 (PG. 7)
SEED QUALITY
THE TERM "PURE LIVE SEED" IS USED TO EXPRESS THE QUALITY OF SEED AND IS
NOT SHOWN ON THE LABEL. PURE LIVE SEED, PLS, IS EXPRESSED AS A
PERCENT}AGE OF THE SEEDS THAT ARE PURE AND WILL GERMI}NATE.
INFORMATION ON PERCENT GERMINATION AND PURITY CAN BE FOUND ON SEED
TAGS. PLS IS DETER}MINED BY MULTIPLYING THE PERCENT OF PURE SEED WITH
THE PERCENT OF GERMINATION; I.E.,
(PLS = % GERMINATION X % PURITY)
EXAMPLE:
COMMON BERMUDA SEED
70% GERMINATION, 80% PURITY
PLS = 70% GERMINATION X 80% PURITY
PLS = 56%
THE PERCENT OF PLS HELPS YOU DETERMINE THE AMOUNT OF SEED YOU NEED.
IF THE SEEDING RATE IS 10 POUNDS PLS AND THE BULK SEED IS 56 % PLS, THE
BULK SEEDING RATE IS:
10 LBS. PLS/ACRE = 17.9 LBS/ACRE
56% PLS
YOU WOULD NEED TO PLANT 17.9 LBS/ACRE TO PROVIDE 10 LBS/ACRE OF PURE
LIVE SEED.
SEEDBED PREPARATION
SEEDBED PREPARATION MAY NOT BE REQUIRED WHERE HYDRAULIC SEEDING
AND FERTILIZING EQUIP}MENT IS TO BE USED (BUT IS STRONGLY RECOMMENDED
FOR ANY SEEDING PROCESS, WHEN POSSIBLE). WHEN CONVENTIONAL SEEDING
IS TO BE USED, SEEDBED PREPARATION WILL BE DONE AS FOLLOWS:
BROADCAST PLANTINGS
1. TILLAGE, AT A MINIMUM, SHALL ADEQUATELY 6-38
LOOSEN THE SOIL TO A DEPTH OF 4 TO 6 INCHES; ALLEVIATE COMPACTION;
INCORPORATE LIME AND FERTILIZER; SMOOTH AND FIRM THE SOIL; ALLOW
FOR THE PROPER PLACEMENT OF SEED, SPRIGS, OR PLANTS; AND ALLOW
FOR THE ANCHORING OF STRAW OR HAY MULCH IF A DISK IS TO BE USED.
2. TILLAGE MAY BE DONE WITH ANY SUITABLE EQUIPMENT.
3. TILLAGE SHOULD BE DONE ON THE CONTOUR WHERE FEASIBLE.
4. ON SLOPES TOO STEEP FOR THE SAFE OPERATION OF TILLAGE
EQUIPMENT, THE SOIL SURFACE SHALL BE PITTED OR TRENCHED ACROSS
THE SLOPE WITH APPROPRIATE HAND TOOLS TO PROVIDE TWO PLACES 6 TO
8 INCHES APART IN WHICH SEED MAY LODGE AND GERMINATE. HYDRAULIC
SEEDING MAY ALSO BE USED.
PLANTING - CONVENTIONAL SEEDING
SEEDING WILL BE DONE ON A FRESHLY PREPARED AND FIRMED SEEDBED. FOR
BROADCAST PLANTING, USE A CULTI-PACKER-SEEDER, DRILL ROTARY SEEDER,
OTHER MECHANICAL SEEDER, OR HAND SEEDING TO DISTRIBUTE THE SEED
UNIFORMLY OVER THE AREA TO BE TREATED. COVER THE SEED LIGHT WITH 1/8
TO 1/4 INCH OF SOIL FOR SMALL SEED AND 1/2 TO 1 INCH FOR LARGE SEED WHEN
USING A CULTIPACKER OR OTHER SUITABLE EQUIPMENT.
ANCHOR MULCHING
SYNTHETIC TACKIFIERS, BINDERS OR HYDRAULIC MULCH SPECIFICALLY
DESIGNED TO TACK STRAW, SHALL BE APPLIED IN CONJUNCTION WITH OR
IM}MEDIATELY AFTER THE MULCH IS SPREAD. SYN}THETIC TACKIFIERS SHALL BE
MIXED AND APPLIED ACCORDING TO MANUFACTURER'S SPECIFICATIONS. ALL
TACKIFIERS, BINDERS OR HYDRAULIC MULCH SPECIFICALLY DESIGNED TO TACK
STRAW SHOULD BE VERIFIED NONTOXIC THROUGH EPA 2021.0 TESTING. REFER
TO TACKIFIERS-TAC.
GSWCC - 2016 EDITION - MANUAL FOR EROSION AND SEDIMENT CONTROL IN GA.
LOD
LODLO
D
LO
D
LO
D
LOD LOD LOD
LOD LOD
LO
D
LO
DLOD
LOD LOD LOD LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LO
D
LO
D
LOD
LO
D
EROSION, SEDIMENT & POLLUTION CONTROL PLAN
INTERMEDIATE ES&PC
PLAN
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
GAGR7591-26020
SHEET OF 13
KE
N
W O
O D
P
AR
K
ER
O
SI
O N
S
TA
BI
LI
ZA
TI
O N
LO
C
AT
ED
IN
L
AN
D
LO
TS
O F
TH
E
D
IS
TR
IC
T, F
AY
ET
TE
C O
U N
TY
FAYETTE COUNTY
B.O.C.
140 STONEWALL AVE. W, SUITE
770-716-4321
ER
O
SI
O
N S
TA
BI
LI
ZA
TI
O
N P
LA
N
S
FO
R
Ss
Tr
Ds3Ds2 DuDs1
LIMITS OF DISTURBANCE
0.22 ACRES
BY
D
ES
C
R
IP
TI
O
N C
H K
AP
V
SHEET NUMBER
PROJECT NUMBER
LJA ENGINEERING
LICENSE NUMBER: PEF007932
350 AIRPORT ROAD
GRIFFIN, GA 30224
(770) 412-7700
SHEET NAME
D
AT
E N
O
/0 5/
R
EV
IS
IO
N S
KL
B
R
FK
W
TS
/0 6/
PL
AN
S U
BM
IT
TA
L
KL
B
R
FK
W
TS
TRACK AND BASKETBALL AREA
1. REMOVE TREE PROTECTION ONCE
GRASSING IS ESTABLISHED.
2. REMOVE SILT FENCE WHEN GRASSING IS
ESTABLISHED.
3. REMOVE INLET PROTECTION WHEN
GRASSING IS ESTABLISHED.
4. REMOVE CONSTRUCTION EXIT ONCE
GRADING IS COMPLETE
DESCRIPTION OF
EROSION CONTROL MEASURES
INITIAL PHASE:
1. CONTRACTOR TO INSTALL A CONSTRUCTION EXIT PER THE DETAIL
WITHIN THIS DRAWING SET (SHEET 10).
2. INSTALL PERIMETER SILT FENCING.
3. CONTRACTOR TO INSTALL TREE PROTECTION AROUND ALL TREES
WITHIN DISTURBED AREA.
4. CONTRACTOR TO INSTALL INLET SEDIMENT TRAPS ON ALL EXISTING
STO…