Exhibit A - CDRLs - W519TC-23-R-0046.pdf

PDF 2 MB Posted

Attached to
120mm Tank Training Ammunition M830A1 Recap
Solicitation number
W519TC-23-R-0046
Issued by

About this file

This solicitation requests proposals for 120mm M830A1 tank training ammunition recapitalization. The Army Materiel Command Contracting Command Rock Island Arsenal is seeking to award a firm-fixed price contract for refurbishment of 120mm M830A1 cartridge cases and projectiles to like-new condition. The closing date for proposals is February 17, 2023. The solicitation includes three attachments providing technical specifications and quality requirements for the refurbished ammunition. One exhibit outlines the data items required from the contractor during performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

D. SYSTEM/ITEM

CTG 120MM HEAT-MP-T M830A1

E. CONTRACT/ PR NO.

C791RCAP822

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

FCDD-ACE-SP

7. DD 250 REQ. 9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT * ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final Reg Repro

N/A N/A ASREQ

16. REMARKS: ACO 0 1 0

PCO 0 1 0

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION

STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS.

DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE

DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING,

THEN THE WHOLE SUBMITTAL WILL BE LABELED "D".

THE PREFERRED METHOD FOR SUBMITTAL IS DD FORM 1694 LOCATED

AT www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; COPY FURNISH

THIS SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

15. TOTAL 0 2 0

G. PREPARED BY

Steven Carpenter for SDMO, FCDD-ACE-SP

H. DATE

10/04/2022

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 4 Pages http://www.dtic.mil/whs/directives/infomgt/forms/

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

D. SYSTEM/ITEM

CTG 120MM HEAT-MP-T M830A1

E. CONTRACT / PR NO.

C791RCAP822

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80639D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

FCDD-ACE-SP

7. DD 250 REQ. 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

STATEMENT

LT REQUIRED ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF

SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft Final

Reg Repro

N/A N/A ASREQ

16. REMARKS: ACO 0 1 0

PCO 0 1 0

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION

STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS.

DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE

DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING, THEN

THE WHOLE SUBMITTAL WILL BE LABELED "D".THE PREFERRED METHOD

FOR SUBMITTAL IS DD FORM 1692 LOCATED AT https:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

15. TOTAL 0 2 0

G. PREPARED BY

Steven Carpenter for SDMO, FCDD-ACE-SP

H. DATE

10/04/2022

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 2 of 4 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

D. SYSTEM/ITEM

CTG 120MM HEAT-MP-T M830A1

E. CONTRACT / PR NO.

C791RCAP822

F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM

NOTICE OF REVISION (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80642D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

FCDD-ACE-SP

7. DD 250 REQ. 9. DIST 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

STATEMENT

REQUIRED

LT * ASREQ ASREQ b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF Final SUBSEQUENT a. ADDRESSEE Draft Reg Repro

SUBMISSION

N/A N/A ASREQ

16. REMARKS: ACO 0 1 0

PCO 0 1 0

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. DISTRIBUTION

STATEMENT SHOULD BE THE HIGHEST LEVEL OF THE DRAWINGS.

DISTRIBUTION STATEMENT A IS THE LOWEST. FOR EXAMPLE, IF THE

DOCUMENT HAS A DISTRIBUTION STATEMENT A AND D DRAWING, THEN

THE WHOLE SUBMITTAL WILL BE LABELED "D". THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1695 LOCATED AT https:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.devcom-ac.mbx.ecp-document@army.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

15. TOTAL 0 2 0

G. PREPARED BY

Steven Carpenter for SDMO, FCDD-ACE-SP

H. DATE

10/04/2022

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 4 Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory.

Item B. Self-explanatory. Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support. a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of

CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority. Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry). b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered. c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government. Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK)

TDP:
TM:
17:
18:
Draft15 TOTAL: 0
Repro15 TOTAL: 0
A DATE:
number:
NAME: Michael Mounts
DATE: 20 Sept 2022
ITEM: Cartridge, 120mm HEAT-MP-T
PRON: C791RCAP822
F CONTRACTOR:
A0(CDRL#):
Exhibit:
11 ADC AS OF DATE: N/A
QPP(CDRL#):
QPP Exhibit:
QPP OTHER: MISC
QPP DID:
QPP TITLE OF DATA ITEM: Quality Program Plan (QPP)
QPP SUBTITLE: N/A
QPP Authority: DI-QCIC-81722 (Current Revision)
QPP CONTRACT REFERENCE: Section: E
QPP REQUIRING OFFICE: AMJM-QA
QPP DD 250: LT
QPP 9 DIST STATEMENT REQUIRED: B
QPP FREQUENCY: ONE/R
QPP DATE OF FIRST SUBMISSION: 150DAC
QPP App Code: A
11 QPP AS OF DATE: N/A
QPP DATE OF SUBSEQUENT SUBMISSION: ASREQ
QPP Addressee 1: PCO
QPP DraftRow1: 0
QPP RegRow1: 1
QPP ReproRow1: 0
QPP Addressee 2: PQM
QPP DraftRow2: 0
QPP RegRow2: 1
QPP Remarks: BLK 12: Quality Program Plan (QPP) shall be submitted no later than 150 calendar days after contract award. The Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. Approval is required prior to first article test (FAT), if FAT is required, or prior to initiation of production. Disposition will be provided by the Procuring Contracting Officer (PCO).

BLK 13: Submit updates/revisions for review and approval prior to implementation.

BLK 14: Submit via email or SAFE https://safe.apps.mil/

When sending by email, the email subject line shall include the Data Item No., Title of Data Item and Subtitle. This information is found in Blocks 1, 2 and 3 of the CDRL.

Specific email addresses for the distribution list will be provided after contract award.

QPP ReproRow2: 0
QPP Addressee 3: AQE
QPP DraftRow3: 0
QPP RegRow3: 1
QPP ReproRow3: 0
QPP Addressee 4:
QPP DraftRow4:
QPP RegRow4:
QPP ReproRow4:
QPP Addressee 5:
QPP DraftRow5:
QPP RegRow5:
QPP ReproRow5:
QPP Addressee 6:
QPP DraftRow6:
QPP RegRow6:
QPP ReproRow6:
QPP Addressee 7:
QPP DraftRow7:
QPP RegRow7:
QPP ReproRow7:
QPP Addressee 8:
QPP DraftRow8:
QPP RegRow8:
QPP ReproRow8:
QPP Reg15 TOTAL: 3
QPP number:
CCCP Exhibit:
A CCCP 0(CDRL#):
CCCP OTHER: MGMT
F CCCP CONTRACTOR:
CCCP CDRL #:
CCCP Authority: DI-MGMT-81986 (Current Revision)
CCCP TITLE OF DATA ITEM: Critical Characteristics Control Plan (CCCP)
CCCP SUBTITLE: N/A
CCCP CONTRACT REFERENCE: Section: E
6 CCCP REQUIRING OFFICE: AMJM-QA
CCCP DD 250: LT
9 CCCP DIST STATEMENT REQUIRED: B
CCCP FREQUENCY: ANNLY
CCCP DATE OF FIRST SUBMISSION: 120DAC
CCCP App Code: A
11 CCCP AS OF DATE: N/A
CCCP DATE OF SUBSEQUENT SUBMISSION: ASREQ
CCCP Addressee 1: PCO
CCCP DraftRow1: 0
CCCPRegRow1: 1
CCCP ReproRow1: 0
CCCP Addressee 2: PQM
CCCP DraftRow2: 0
CCCPRegRow2: 1
CCCP ReproRow2: 0
CCCP Remarks: BLK 12: Critical Characteristics Control Plan (CCCP) shall be submitted no later than 120 calendar days after contract award. Government shall provide response within 45 calendar days of initial submission. Disposition of the CCCP will be provided by the procuring contracting officer (PCO). If further revisions are necessary, the contractor shall have 15 calendar days to provide revisions and the Government shall provide a response within 15 calendar days. The CCCP shall be approved prior to first article test (FAT), if FAT is required, or the initiation of production.

BLK 13: Submit updates/revisions for review and approval prior to implementation. Government shall provide a response within 15 calendar days of receipt and contractor shall response to any comments within 15 calendar days.

BLK 14: Submit via email or SAFE https://safe.apps.mil/

When sending by email, the email subject line shall include the Data Item No., Title of Data Item and Subtitle. This information is found in Blocks 1, 2 and 3 of the CDRL.

Specific email addresses for the distribution list will be provided after contract award.

A CCCP Review Guide is available to assist Contractors on the Public Website (https://ac.ccdc.army.mil/organizations/QESA/) in the application of the CCCP requirement. The CCCP Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the CCCP Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the CCCP requirement itself nor into the terms and conditions of any underlying contract which contains the CCCP requirement.

CCCP Addressee 3: AQE
CCCP DraftRow3: 0
CCCPRegRow3: 1
CCCP ReproRow3: 0
CCCP Addressee 4:
CCCP DraftRow4:
CCCPRegRow4:
CCCP ReproRow4:
CCCP Addressee 5:
CCCP DraftRow5:
CCCPRegRow5:
CCCP ReproRow5:
CCCP Addressee 6:
CCCP DraftRow6:
CCCPRegRow6:
CCCP ReproRow6:
CCCP Addressee 7:
CCCP DraftRow7:
CCCPRegRow7:
CCCP ReproRow7:
CCCP Addressee 8:
CCCP DraftRow8:
CCCPRegRow8:
CCCP ReproRow8:
CCCP Reg15 TOTAL: 3
CCCP number:
A CPOA 0(CDRL#):
CPOA Exhibit:
CPOA OTHER: MGMT
F CPOA CONTRACTOR:
CPOA CDRL #:
CPOA TITLE OF DATA ITEM: Critical Plan Of Action (CPOA)
CPOA 3 SUBTITLE: N/A
CPOA Authority: DI-MGMT-81996 (Current Revision)
CPOA 5 CONTRACT REFERENCE: ANNLY
6 CPOA REQUIRING OFFICE: AMJM-QA
CPOA DD 250: LT
9 CPOA DIST STATEMENT REQUIRED: B
CPOA 10 FREQUENCY: ASREQ
CPOA 12 DATE OF FIRST SUBMISSION: ASREQ
CPOA App Code: A
11 CPOA AS OF DATE: N/A
CPOA 13 DATE OF SUBSEQUENT SUBMISSION: ASREQ
CPOA Addressee 1: PCO
CPOA DraftRow1: 0
CPOA RegRow1: 1
CPOA ReproRow1: 0
CPOA Addressee 2: PQM
CPOA DraftRow2: 0
CPOA RegRow2: 1
CPOA Remarks: BLK 10: Contractor may voluntarily submit a CPOA for all critical characteristics as specified in the critical characteristic requirement. If contractor chooses to utilize the CPOA, it shall be updated and resubmitted on an annual basis from the date that the CPOA is approved.

BLK 12: Contractor shall submit the CPOA for approval prior to use. The Government requires 45 calendar days for review. Disposition of the CPOA will be provided through the procuring contracting officer (PCO). CPOA shall be approved prior to implementation. If further revisions are necessary, the contractor shall provide revision within 15 calendar days and the Government will provide disposition within 15 calendar days of receipt.

BLK 14: Submit via email or SAFE https://safe.apps.mil/

When sending by email, the email subject line shall include the Data Item No., Title of Data Item and Subtitle. This information is found in Blocks 1, 2 and 3 of the CDRL.

Specific email addresses for the distribution list will be provided after contract award.

A CPOA Review Guide is available to assist Contractors on the ARDEC Public Website (https://ac.ccdc.army.mil/organizations/QESA/) in the application of the CPOA requirement. The CPOA Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the CPOA Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the CPOA requirement itself nor into the terms and conditions of any underlying contract which contains the CPOA requirement.

CPOA ReproRow2: 0
CPOA Addressee 3: AQE
CPOA DraftRow3: 0
CPOA RegRow3: 1
CPOA ReproRow3: 0
CPOA Addressee 4:
CPOA DraftRow4:
CPOA RegRow4:
CPOA ReproRow4:
CPOA Addressee 5:
CPOA DraftRow5:
CPOA RegRow5:
CPOA ReproRow5:
CPOA Addressee 6:
CPOA DraftRow6:
CPOA RegRow6:
CPOA ReproRow6:
CPOA Addressee 7:
CPOA DraftRow7:
CPOA RegRow7:
CPOA ReproRow7:
CPOA RegRow8:
CPOA Addressee 8:
CPOA DraftRow8:
CPOA ReproRow8:
CPOA Reg15 TOTAL: 3
CPOA number:
Notification A0(CDRL#):
Notification Exhibit:
CICL 2 OTHER: SAFT
F CICL 2CONTRACTOR:
CICL 2 CDRL #:
CICL 2 Authority: DI-SAFT-81985 (Current Revision)
CICL 2 TITLE OF DATA ITEM: Notification of Critical Non-Conformance Report
CICL 2 SUBTITLE: N/A
CICL 2 5 CONTRACT REFERENCE: Section: E
CICL 2REQUIRING OFFICE: AMJM-QA
CICL 2 DD 250: LT
CICL 2 12 DATE OF FIRST SUBMISSION: SEE BLK 16
CICL 2 STATEMENT REQUIRED: N/A
CICL 2 10 FREQUENCY: ONE/R
CICL 2 App Code: A
11 CICL 2 AS OF DATE: N/A
CICL 2 DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16
CICL 2 Addressee 1: PCO
CICL 2 DraftRow1: 0
CICL 2 RegRow1: 1
CICL 2 ReproRow1: 0
CICL 2 Addressee 2: PQM
CICL 2 DraftRow2: 0
CICL 2 RegRow2: 1
CICL 2 Remarks: BLK 10: Whenever a Critical Defect occurs.

BLKS 8, 12 & 13:

Unless otherwise approved by the PCO, Notification of the occurrence of any critical defects shall be made to the Government within 24 hours of the event.

BLK 14: Submit via email or SAFE https://safe.apps.mil/

When sending by email, the email subject line shall include the Data Item No., Title of Data Item and Subtitle. This information is found in Blocks 1, 2 and 3 of the CDRL.

Specific email addresses for the distribution list will be provided after contract award.

CICL 2 ReproRow2: 0
CICL 2 Addressee 3: AQE
CICL 2 DraftRow3: 0
CICL 2 RegRow3: 1
CICL 2 ReproRow3: 0
CICL 2 Addressee 4:
CICL 2 DraftRow4:
CICL 2 RegRow4:
CICL 2 ReproRow4:
CICL 2 Addressee 5:
CICL 2 DraftRow5:
CICL 2 RegRow5:
CICL 2 ReproRow5:
CICL 2 Addressee 6:
CICL 2 DraftRow6:
CICL 2 RegRow6:
CICL 2 ReproRow6:
CICL 2 Addressee 7:
CICL 2 DraftRow7:
CICL 2 RegRow7:
CICL 2 Addressee 8:
CICL 2 DraftRow8:
CICL 2 RegRow8:
CICL 2 ReproRow7:
CICL 2 ReproRow8:
CICL 2 Reg15 TOTAL: 3
CICL 2 number:
CICL 5 A0(CDRL#):
CICL 5 Exhibit:
CICL5 OTHER: MGMT
F CICL 5 CONTRACTOR:
CICL 5 CDRL #:
CICL5 Authority: DI-MGMT-81989 (Current Revision)
CICL5 TITLE OF DATA ITEM: Critical Defect Investigation Report
CICL5 SUBTITLE: N/A
CICL5 CONTRACT REFERENCE: Section: E
CICL5 REQUIRING OFFICE: AMJM-QA
CICL5 DD 250: LT
CICL5 DIST STATEMENT REQUIRED: B
CICL5 FREQUENCY: ASREQ
CICL5 DATE OF FIRST SUBMISSION: SEE BLK 16
CICL5 App Code: A
CICL5 AS OF DATE: N/A
13 CICL 5 DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16
CICL 4 Addressee 1: PCO
CICL 4 DraftRow1: 0
CICL 4 RegRow1: 1
CICL 4 ReproRow1: 0
CICL 4 Addressee 2: PQM
CICL 4 Addressee 4:
CICL 4 DraftRow2: 0
CICL 4 RegRow2: 1
CICL 4 ReproRow2: 0
CICL 5 Remarks: BLK 10: Whenever a Critical Defect occurs.

BLKS 8, 12 & 13:

Root Cause Investigation and Segregated Suspect Material Use:

Contractor shall submit to Government for approval and will receive response within 3 business days of receipt of original and any required revisions. Unless otherwise stated, the Contractor shall submit revisions within 10 days of receipt of Government response.

BLK 14: Submit via email or SAFE https://safe.apps.mil/

When sending by email, the email subject line shall include the Data Item No., Title of Data Item and Subtitle. This information is found in Blocks 1, 2 and 3 of the CDRL.

Specific email addresses for the distribution list will be provided after contract award.

CICL 4 Addressee 3: AQE
CICL 4 DraftRow3: 0
CICL 4 RegRow3: 1
CICL 4 ReproRow3: 0
CICL 4 DraftRow4:
CICL 4 RegRow4:
CICL 4 ReproRow4:
CICL 4 Addressee 5:
CICL 4 DraftRow5:
CICL 4 RegRow5:
CICL 4 ReproRow5:
CICL 4 Addressee 6:
CICL 4 DraftRow6:
CICL 4 RegRow6:
CICL 4 ReproRow6:
CICL 4 Addressee 7:
CICL 4 DraftRow7:
CICL 4 RegRow7:
CICL 4 ReproRow7:
CICL 4 Addressee 8:
CICL 4 DraftRow8:
CICL 4 RegRow8:
CICL 4 ReproRow8:
CICL 4 Reg15 TOTAL: 3
CICL 5 number:
Restart OTHER: MISC
Restart CDRL #:
Restart Title: Critical Defect Investigation Report
Restart Subtitle: Restart Request
Restart DID: DI-MGMT-81989
Restart Contract Reference: Section: E
6 Restart REQUIRING OFFICE: AMJM-QA
Restart DD250: LT
9 Restart DIST STATEMENT REQUIRED:
Restart Freq: ASREQ
Restart Submission: SEE BLK 16
Restart App Code: A
Restart second Sub: SEE BLK 16
Restart Add 1: PCO
Restart DraftRow1: 0
Restart RegRow1: 1
Restart ReproRow1: 0
Restart Add 2: PQM
Restart DraftRow2: 0
Restart RegRow2: 1
Restart ReproRow2: 0
Restart Remarks: BLK 10: Whenever a request to restart manufacturing is required

BLK 8, 12 & 13: After an investigation is conducted to determine the root cause of the non-conformance and the required corrective actions, the Contractor shall submit request to restart to the Government for approval. Government will respond within 3 business days of receipt.

BLK 14: Submit via email or SAFE https://safe.apps.mil/

Specific email addresses for the distribution list will be provided after contract award.

Restart Add 3: AQE
Restart DraftRow3: 0
Restart RegRow3: 1
Restart ReproRow3: 0
Restart Add 4:
Restart DraftRow4:
Restart RegRow4:
Restart ReproRow4:
Restart Add 5:
Restart DraftRow5:
Restart RegRow5:
Restart ReproRow5:
Restart Add 6:
Restart DraftRow6:
Restart RegRow6:
Restart ReproRow6:
Restart Add 7:
Restart DraftRow7:
Restart RegRow7:
Restart ReproRow7:
Restart Add 8:
Restart DraftRow8:
Restart RegRow8:
Restart ReproRow8:
Restart Reg15 TOTAL: 5
Restart number:
A MSE 0(CDRL#):
MSE Exhibit:
MSE OTHER: QCIC
F MSE CONTRACTOR:
MSE CDRL #:
MSE TITLE OF DATA ITEM: Measurement System Evaluation (MSE) – Measurement and Inspection Equipment System Design Documentation for Acce
MSE SUBTITLE: Measurement System Evaluation/Acceptance Inspection Equipment (MSE/AIE)
MSE Authority: DI-QCIC-81960 (Current Revision)
MSE CONTRACT REFERENCE: Section: E
6 MSE REQUIRING OFFICE: AMJM-QA
MSE DD 250: DD
9 MSE DIST STATEMENT REQUIRED: B
MSE FREQUENCY: ONE/R
MSE DATE OF FIRST SUBMISSION: 120DAC
MSE App Code: A
11 MSE AS OF DATE: N/A
MSE DATE OF SUBSEQUENT SUBMISSION: ASREQ
MSE Remarks: BLK 12: The Contractor shall submit a completed AIE package no later than (120) calendar days after contract award. The AIE shall be approved prior to First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract. The PCO will provide disposition within (45) calendar days of final AIE package receipt.

BLK 13: If further revisions are necessary, the Contractor shall have (30) calendar days to generate them and the Government shall have (30) calendar days to review and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .