This document is a Contract Data Requirements List (CDRL) Addendum for a federal contract opportunity. The CDRL outlines the deliverables and associated submission timelines for the TR-232C Transducer First Article and Production Assemblies contract, Solicitation Number N66604-24-R-0144.

The key deliverables include a top-level drawing package to be submitted 15 days prior to the Preliminary Design Review (PDR), a complete drawing package 20 days prior to the Critical Design Review (CDR), and the final complete drawing package 10 days prior to the First Article and Production Acceptance Review (FA-PCA) and First Article and Production Conformance Acceptance (FCA/PCA) events. The Government will review the deliverables within 5-10 days of submission. The contract is being solicited by the Department of the Navy Naval Sea Systems Command for the design, manufacturing, testing, packaging, and delivery of the TR-232C Transducer First Article and Production Assemblies.

View the file

Other files

File Type Posted
Amendment 0003.pdf PDF
N6660424R0144P0002.pdf PDF
N6660424R0144P0001.pdf PDF
N6660424R0144.pdf PDF
Attachment 5 Performance Based Payment Milestones.pdf PDF
Attachment 1 DD254 SCO Validated and Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 14

DD FORM 1423

CONTRACT DATA REQUIREMENTS LIST ADDENDUM

PR TBD

CDRL A005 BLOCK 16 ADDENDUM

EVENT TO DELIVER BLOCK 12

(Date of First Submission)

BLOCK 8

(Approval Code)

BLOCK 13

(Date of Subsequent

Submission)

PCR

TOP LEVEL DRAWING

(Native, .pdf, and hardcopy printed from .pdf)

15 DAYS PRIOR TO PCR

(If PCR and FCR combined, submit top level drawing for Government review prior to complete draft development and submittal)

GOVERNMENT WILL

REVIEW WITHIN 5 DAYS

10 DARC

FCR

DRAFT COPY OF COMPLETE

DRAWING PACKAGE

(Native, .pdf, hardcopy, and indentured and numerical lists (in

.xlsx only))

20 DAYS PRIOR TO FCR

GOVERNMENT WILL

REVIEW WITHIN 10 DAYS

10 DARC

FA-PCA

COMPLETE DRAWING

PACKAGE

(.pdf and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO FA-

PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FA-PCA

20 DARC

FCA/PCA

COMPLETE DRAWING

PACKAGE

(Native, .pdf, and indentured and numerical lists (in .xlsx only))

10 DAYS PRIOR TO

FCA/PCA

GOVERNMENT TO

PROVIDE COMMENTS AT

FCA/PCA

20 DARC

(after all discrepancies resolved, Govt. will provide revision block information)