File Summary
This is a comprehensive bid document set for the Koch Park Soccer Field Installation project in Florissant, Missouri, involving the City of Florissant and the Metropolitan St. Louis Sewer District (MSD). The project encompasses construction of two new natural grass soccer fields (Fields A and B) at Koch Park, located at the intersection of Howdershell Road and Charbonier Road. The scope of work includes site grading and preparation across 6.85 acres (298,304 square feet), installation of a fully automated underground irrigation system with zone control, construction of ADA-compliant concrete sidewalks and ramps, installation of 6-foot PVC-coated chain link perimeter fencing (approximately 1,410 linear feet total), stormwater management infrastructure including bio-basins and amended soil areas, and turf establishment with specified grass varieties. The estimated earthwork involves 400 cubic yards of cut and 2,691 cubic yards of fill (with 2,291 cubic yards requiring import), with an anticipated construction schedule from August 1, 2026, through December 31, 2026. The document references specific technical specifications for materials, compaction requirements, drainage calculations, and Best Management Practices (BMPs) for stormwater pollution prevention.
The project requires compliance with Metropolitan St. Louis Sewer District standard construction specifications, Missouri Department of Natural Resources regulations, and local City of Florissant engineering standards. Bidders must provide certificates of insurance indicating commercial general liability and comprehensive auto liability coverage prior to obtaining construction permits. The irrigation system must be capable of 100 percent automatic operation with minimum water pressure of 45 PSI and must provide total coverage delivering a minimum of one inch of water per week for turf areas. All siltation control measures, including approximately 900 linear feet of siltation fence along the Charbonier Road frontage and 417 linear feet of temporary fence, must be installed and maintained throughout construction until site stabilization is complete. The project includes three alternative water quality treatment options (field irrigation systems, sand base under sod, or field underdrain systems), with bidders responsible for selecting the most appropriate BMP based on site conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project # Approval Date Comments
Add. Imp. Area
(Acres)
Diff. Runoff
(CFS)
Qp
Provided
(Y/N)
Dist. Area (Acres)
Treated
Area / BMP
(Acres)
WQv
Provided
(Y/N)
CPv
Provided
(Y/N)
BMP Provided
20MSD-00234 8/25/20 New Splash Pad/Playground
0.27 0.49 N 0.66 N N
Y N
Y N
N
N
Project # New Swimming Pool
T.B.D. New Walkways
23MSD-00265
26MSD-00157
0.00 Not Required *
1.53 3.631.59 2.16 Bio-Basins **
0.25 1.110.00 Amended Soils0.56
Site Area:
Cumulative Increase in Runoff Since 2006:
Cumulative Disturbance Since Since 2006:
Cumulative Area Treated Since 2006:
Notes:
* Total cumulative site disturbance was below 1 acre, therefore water quality not required.
** BMP's account for previous project disturbances.
Stormwater Management Tracking Table
1.98
5.40
2.72
6. SCHOOL DISTRICT:
7. FIRE DISTRICT:
ATT
MISSOURI-AMERICAN WATER CO.
1. SEWER DISTRICT:
2. ELECTRIC:
3. GAS:
4. PHONE:
5. WATER:
M.S.D.
AMEREN
SPIRE
FERGUSON-FLORISSANT
FLORISSANT VALLEY
8. WATER SHED: COLDWATER CREEK
FEMA MAP # 29189C0061 K, EFFECTIVE DATE FEBRUARY 4. 2015
SUBJECT PROPERTY NOT WITHIN ANY FLOOD ZONES
SITE LOCATION: CITY OF FLORISSANT - KOCH PARK
INTERSECTION OF HOWDERSHELL ROAD AND CHARBONIER ROAD
PROJECT AREA: 298,304 S.F. 6.85 ACRES
PROJECT DRAINAGE AREA: 298,304 S.F. 6.85 ACRES
SOIL TYPES: 100% C
STORMWATER MANAGEMENT FUTURE NOTE:
PROJECT DISTURBANCE: 48,342 S.F. 1.11 ACRES
PROJECT RUNOFF DIFFERENTIAL = 0.00 CFS
ANY FUTURE LAND DISTURBANCE AND/OR INCREASE IN IMPERVIOUS AREA ON
THIS SITE MAY REQUIRE ADDITIONAL STORM WATER MANAGEMENT PER MSD
REGULATIONS IN PLACE AT THAT TIME (INCLUDING TOTAL LAND DISTURBANCE
AND/OR IMPERVIOUSNESS ADDED ON THIS PLAN.)
PROPOSED:
PROPOSED IMPERVIOUS AREAS:
PROJECT AREA PAVEMENT: 11,100 SF = 0.25 AC.
PROPOSED IMPERVIOUS: 0.25 AC. X 3.54 = 0.89 CFS
PROPOSED PERVIOUS: 0.86 AC. X 1.70 = 1.46 CFS
TOTAL: 2.35 CFS
EX. = 2.35 CFS
PROP. = 2.35 CFS
2.35 CFS - 2.35 CFS = 0.00 CFS (NO INCREASE IN RUNOFF)
TOTAL DIFFERENTIAL RUNOFF (1.98 CFS), LESS THAN 2.0 CFS
THEREFORE NO DETENTION REQUIRED
TOTAL DISTURBANCE (5.40 AC.) IS GREATER THAN 1 ACRE
THEREFORE WATER QUALITY TREATMENT IS REQUIRED
DIFFERENTIAL RUNOFF CALCS:
PER APPROVED THIS PLAN
EXISTING:
EXISTING IMPERVIOUS AREAS:
PAVEMENT 10,787 SF = 0.25 AC.
EXISTING IMPERVIOUS: 0.25 AC. X 3.54 = 0.89 CFS
EXISTING PERVIOUS: 0.86 AC. X 1.70 = 1.46 CFS
TOTAL: 2.35 CFS
ELEVATIONS BASED ON NAVD88 (SLC2011a) ELEV.=577.03 FTUS STANDARD
DNR ALUMINUM DISK STAMPED SL-119 SITUATED IN A GRASSY AREA WEST
OF THE SIDEWALK NEAR THE NORTHERN END OF THE RIGHT TURN LANE
FROM SOUTHEAST BOUND CHARBONIER ROAD ONTO SOUTHWEST BOUND
HOWDERSHELL ROAD AND IN THE FAR EASTERN PART OF THE CITY OF
FLORISSANT ATHLETIC FIELDS ADDRESSED AS #2300 CHARBONIER ROAD,
ROUGHLY 28 FEET SOUTHEAST OF A UTILITY POLE, 6 FEET WEST OF THE
BACK OF CURB OF THE RIGHT TURN LANE, AND 11 FEET NORTH OF A
MANHOLE COVER. <NGS PID="AA8638".DESIGNATION="SL 119">
TOLL FREE
1-800-344-7483
MISSOURI ONE-CALL SYSTEM INC.
Call Before you DIG
NORTH
CONTRACTOR'S INSURANCE (OFFSITE):
Prior to obtaining a construction permit from the Metropolitan St. Louis Sewer District, the contractor shall be required to provide the District with a copy of an executed Certificate of Insurance indicating that the permittee has obtained and will continue to carry commercial general liability and comprehensive auto liability insurance. The requirements and limits shall be as stated in the Rules and Regulations and Engineering Design Requirements for Sanitary and Stormwater Drainage Facilities, February
2006, Section 10.090.
terraspec
Hawkinson Associates, LLC 323 Fox Briar Lane Ballwin, MO 63021
C2
SITE GRADING / SWPP PLAN
C1 EXISTING CONDITIONS
SITE LAYOUT PLAN
C0 COVER SHEET
C4-6 SWPP DETAILS
DA1 EXISTING/PROPOSED
D1 SITE DETAILS
S1-S3 TECHNICAL SPECIFICATIONS
DRAINAGE AREA MAP
Koch Park
C3
UNDERDRAIN SYSTEM / IRRIGATION PLANC8
ST. LOUIS CO. LOCATOR NO: O7L620217
WUNNENBURG'S: Q6-8
ADDRESS: 2302 Charbonier Road
Charbonier Rd @ Howdershell Rd
LOCATION MAP
(NOT TO SCALE)
SUBJECT
SITE
C
H
A
R
B
O
N
I
E
R
R
O
A
D
H
O
W
D
E
R
S
H
E
L
L
R
O
A
D
S
H
A
C
K
E
L
F
O
R
D
C7 WATER QUALITY PLAN
ALT. #1 - Field Irrigation Systems
ALT. #2 - 2" Sand Base under Sod
ALT. #3 - Field Underdrain Systems
C1A DEMOLITION PLAN
GENERAL NOTES:
UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE
INFORMATION AND THEREFORE, THEIR LOCATIONS MUST BE CONSIDERED
APPROXIMATE ONLY. THE VERIFICATION OF THE LOCATION OF UNDERGROUND
UTILITIES, EITHER SHOWN OR NOT SHOWN ON THESE PLANS, SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE LOCATED PRIOR TO
ANY GRADING OR CONSTRUCTION OF IMPROVEMENTS.
CONSTRUCTION AND MATERIALS USED SHALL CONFORM TO MOST CURRENT
METROPOLITAN ST. LOUIS SEWER DISTRICT "STANDARD CONSTRUCTION
SPECIFICATIONS FOR SEWER AND DRAINAGE FACILITIES" AND LOCAL
GOVERNING AUTHORITIES.
ALL CONSTRUCTION SHALL BE PER MOST CURRENT DETAILS LOCATED IN THE
ST. LOUIS COUNTY DESIGN CRITERIA MANUAL AND/OR THE SEDIMENT AND
EROSION CONTROL MANUAL.
SIDEWALKS AND CURB RAMPS SHALL BE CONSTRUCTED TO ADA STANDARDS
AND SPECIFICATIONS.
ALL STORM WATER SHALL BE DISCHARGED AT AN ADEQUATE NATURAL
DISCHARGE POINT. SINKHOLES ARE NOT ADEQUATE NATURAL DISCHARGE
POINTS.
EXISTING ABOVE & BELOW GROUND UTILITIES TO BE PROTECTED AND USED IN
PLACE, UNLESS OTHERWISE SPECIFIED.
MANHOLES AND INLET TOPS BUILT WITHOUT ELEVATIONS FURNISHED BY THE
DESIGNER WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
EXISTING UTILITIES AND/OR STRUCTURES AFFECTED BY CONSTRUCTION,
EITHER SHOWN OR NOT SHOWN ON THE PLANS, SHALL BE ADJUSTED TO
GRADE
STORM SEWERS SHALL BE R.C.P. (REINFORCED CONCRETE PIPE) A.S.T.M. C-76,
CLASS III MINIMUM, UNLESS OTHERWISE SPECIFIED.
ALL P.V.C. SEWER PIPE SHALL BE A.S.T.M. D-3034, S.D.R.-35.
TRENCH SUPPORT TO BE TO APPLICABLE SPECIFICATIONS IN ORDER FOR
SAFE PLACEMENT OF PIPES. IT IS THE SEWER CONTRACTOR'S
RESPONSIBILITY TO INSURE SAFETY OF THE SEWER CONSTRUCTION ON THE
PROJECT.
CONTRACTOR TO INSTALL STORM SEWERS, SANITARY SEWERS, WATER LINES,
METERS, METER BOXES, AND VALVES AS REQUIRED AND IN ACCORDANCE
WITH THE LOCAL UTILITIES AND GOVERNING AUTHORITIES.
LOCATION AND ELEVATION OF EXISTING INLETS, MANHOLES AND PIPES TO BE
VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.
ALL FILLS PLACED UNDER PROPOSED STORM SEWER LINES, SANITARY SEWER
LINES, BUILDINGS AND PAVED AREAS, INCLUDING TRENCH BACKFILLS WITHIN
AND OFF ROAD RIGHT-OF-WAY, SHALL BE COMPACTED TO 90% OF MAXIMUM
DENSITY AS DETERMINED BY THE "MODIFIED AASHTO T-180 COMPACTION
TEST" (ASTM D-1557) FOR THE ENTIRE DEPTH OF THE FILL. COMPACTED
GRANULAR BACKFILL IS REQUIRED IN ALL TRENCH EXCAVATION WITHIN THE
STREET RIGHT-OF-WAY AND UNDER ALL PAVED AREAS. ALL TESTS SHALL BE
PERFORMED UNDER THE DIRECTION OF AND VERIFIED BY A SOILS ENGINEER
CONCURRENT WITH GRADING AND BACKFILLING OPERATIONS.
NEW CONTOURS ARE SHOWN TO FINISHED TOPSOIL AND FINISHED PAVEMENT
GRADES. CONTRACTOR SHALL GRADE PAVEMENT AND BUILDING PAD AREAS
TO SUBGRADE.
NEW GRADES SHALL BE WITHIN 0.1 FEET, MORE OR LESS, OF THOSE SHOWN
ON THE GRADING PLAN.
ALL EXCAVATIONS, GRADING OR FILLING SHALL HAVE A FINISHED GRADE NOT
TO EXCEED A 3:1 SLOPE (33%), UNLESS SUPPORTED BY A GEOTECHNICAL
REPORT THAT HAS BEEN ACCEPTED AND APPROVED.
CONTRACTOR SHALL GRADE AND CONSTRUCT IMPROVEMENTS TO PROVIDE
POSITIVE DRAINAGE TO STORM STRUCTURES, SWALES OR OFF SITE.
PONDING OF STORM WATER WILL NOT BE PERMITTED DURING OR AFTER
CONSTRUCTION.
THE CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONAL IMMEDIATELY
CONCERNING ANY DISCREPANCIES IN THE PLANS.
ALL TRASH AND DEBRIS ON SITE, EITHER EXISTING OR FROM CONSTRUCTION,
MUST BE REMOVED AND PROPERLY DISPOSED OF OFF SITE.
DEBRIS AND FOUNDATION MATERIAL FROM ANY EXISTING ON SITE BUILDING
OR STRUCTURE WHICH IS SCHEDULED TO BE RAZED FOR THIS DEVELOPMENT
MUST BE PROPERLY BE DISPOSED OF OFF SITE.
A LEVEL AREA OF 60" X 60" (FRONT APPROACH) OR 48" X 60" (SIDE APPROACH)
IS REQUIRED OUTSIDE OF THE ENTRANCE DOORS FOR WHEELCHAIR
MANEUVERABILITY. (IF APPLICABLE)
INTERIM STORM WATER DRAINAGE CONTROL IN THE FORM OF SILTATION
CONTROL MEASURES ARE REQUIRED.
THE CONTRACTOR IS REQUIRED TO PROVIDE ADEQUATE STORM WATER
SYSTEMS IN ACCORDANCE WITH ALL GOVERNING AUTHORITIES, AND/OR M.S.D.
STANDARDS.
ANY DISTURBED OFFSITE PROPERTY (IE. BUSHES, FENCES, MAILBOXES, ETC.)
SHALL BE REPLACED, IN KIND, AT THE CONTRACTOR'S EXPENSE.
ALL SEDIMENT SHALL BE WASHED FROM ALL VEHICLES AT WASHDOWN
STATION PRIOR TO LEAVING SITE. NO TRACKING OF SEDIMENT ONTO ANY
ROADS SHALL BE ALLOWED.
SILTATION CONTROL NOTES:
IF CUT & FILL OPERATIONS OCCUR DURING A SEASON NOT FAVORABLE FOR
IMMEDIATE ESTABLISHMENT OF A PERMANENT GROUND COVER, A
FAST-GERMINATING ANNUAL SUCH AS RYE GRASSES OR SUDAN GRASSES
SHALL BE UTILIZED TO RETARD EROSION.
EROSION AND SILTATION CONTROL SHALL BE INSTALLED PRIOR TO ANY
GRADING AND BE MAINTAINED THROUGHOUT THE PROJECT UNTIL
ACCEPTANCE OF THE WORK BY THE OWNER AND/OR CONTROLLING
REGULATORY AGENCY AND ADEQUATE VEGETATIVE GROWTH INSURES NO
FURTHER EROSION OF THE SOIL.
TEMPORARY SILTATION CONTROL MEASURES (STRUCTURAL) SHALL BE
MAINTAINED UNTIL VEGETATIVE COVER IS ESTABLISHED AT A SUFFICIENT
DENSITY TO PROVIDE EROSION CONTROL ON THE SITE.
WHERE NATURAL VEGETATION IS REMOVED DURING GRADING, VEGETATION
SHALL BE REESTABLISHED IN SUCH A DENSITY AS TO PREVENT EROSION.
WHEN CLEARING AND/OR GRADING OPERATIONS ARE COMPLETED OR
SUSPENDED FOR MORE THAN 30 DAYS, ALL NECESSARY PRECAUTIONS SHALL
BE TAKEN TO RETAIN SOIL MATERIALS ON SITE. PROTECTIVE MEASURES MAY
BE REQUIRED BY THE DIRECTOR OF PUBLIC WORKS / CITY ENGINEER SUCH AS
PERMANENT SEEDING, PERIODIC WETTING, MULCHING, OR OTHER SUITABLE
MEANS.
STORM WATER PIPES, OUTLETS AND CHANNELS SHALL BE PROTECTED BY
SILT BARRIERS AND KEPT FREE OF WASTE AND SILT AT ALL TIMES PRIOR TO
FINAL SURFACE STABILIZATION AND/OR PAVING.
SILTATION FENCES SHALL BE INSPECTED PERIODICALLY FOR DAMAGE AND
FOR THE AMOUNT OF SEDIMENT WHICH HAS ACCUMULATED. REMOVAL OF
SEDIMENT WILL BE REQUIRED WHEN IT REACHES 1/2 THE HEIGHT OF THE
SILTATION FENCE.
NO EXCAVATION SHALL BE MADE SO CLOSE TO THE PROPERTY LINE AS TO
ENDANGER ANY ADJOINING PROPERTY OF ANY PUBLIC OR PRIVATE STREET
WITHOUT SUPPORTING AND PROTECTING SUCH PUBLIC OR PRIVATE STREET
OR PROPERTY FROM SETTLING, CRACKING OR OTHER DAMAGE.
PROVIDE ADEQUATE OFF-STREET PARKING FOR CONSTRUCTION EMPLOYEES.
PARKING ON NON-SURFACED AREAS SHALL BE PROHIBITED IN ORDER TO
ELIMINATE THE CONDITION WHEREBY MUD FROM CONSTRUCTION AND
EMPLOYEE VEHICLES IS TRACKED ONTO THE PAVEMENT CAUSING
HAZARDOUS ROADWAY AND DRIVING CONDITIONS.
THE STREETS SURROUNDING THIS DEVELOPMENT AND ANY STREET USED
FOR CONSTRUCTION ACCESS THERETO SHALL BE CLEANED THROUGHOUT
THE DAY.
SOFT SOILS IN THE BOTTOM OF BANKS OF ANY EXISTING OR FORMER POND
SITES OR TRIBUTARIES OR ANY SEDIMENT BASINS OR TRAPS SHOULD BE
REMOVED, SPREAD OUT AND PERMITTED TO DRY SUFFICIENTLY TO BE USED
AS FILL. NONE OF THIS MATERIAL SHOULD BE PLACED IN PROPOSED PUBLIC
RIGHT-OF-WAY LOCATIONS OR IN ANY STORM SEWER LOCATION.
ESTIMATE OF EARTHWORK:
CUT FILL
400 C.Y. 2691 C.Y. (W/ 1.15 ASSUMED SHRINKAGE FACTOR)
2291 C.Y. TO BE IMPORTED TO THE SITE (PRIMARILY TOPSOIL)
14 C.Y. PER TRUCK = 163 TRUCKS
15 TRUCKS PER DAY = 11 DAYS
TRUCKS SHALL NOT EXCEED POSTED WEIGHT LIMITS FOR ALL BRIDGES
DURING HAUL OPERATIONS.
ANY SOFT SOIL REMOVAL WILL ALTER THESE NUMBERS
ANY MATERIAL REMOVAL FROM SITE INCLUDING TOP SOILS WILL ALTER THESE
NUMBERS.
THE ESTIMATED EARTHWORK QUALITIES ARE CALCULATED FOR PERMIT AND
INSPECTION. THESE QUANTITIES ARE NOT INTENDED TO BE USED FOR BID.
THE ABOVE QUANTITIES OF EARTHWORK ARE BE REGARDED AS AN ESTIMATE
OF THE BULK MOVEMENT OR REDISTRIBUTION OF SOILS ON THIS PROJECT.
AS AN ESTIMATE, THESE QUANTITIES ARE INTENDED FOR GENERAL USE, AND
THE DESIGN PROFESSIONAL ASSUMES NO LIABILITY FOR COST OVERRUNS
DUE TO EXCAVATED MATERIALS OR SHORTAGES OF FILL.
THE QUANTITIES ESTIMATED ARE BASED UPON THE HORIZONTAL AND
VERTICAL LOCATION OF THE IMPROVEMENTS AS PROPOSED ON THE SITE
IMPROVEMENT PLANS PREPARED BY TERRASPEC.
EARTHWORK THAT MAY BE NECESSARY FOR COMPLETION OF THE PROJECT
INCLUDE, BUT ARE NOT LIMITED TO, MISCELLANEOUS UNDERGROUND
CONDUITS INCLUDING SEWER LINES AND WATER MAINS; STANDARD
MANHOLES, PROCESS OR TRANSFER PIPING, ELECTRICAL OR TELEPHONE
CONDUITS, BASES FOR LIGHT STANDARDS, BUILDINGS FOOTINGS AND
FOUNDATIONS, ETC.
THE DESIGN PROFESSIONAL ASSUMES NO RESPONSIBILITY FOR THE ACTUAL
SIZE OF THE FIELD EXCAVATIONS MADE FOR THE INSTALLATION OF
UNDERGROUND STRUCTURES, AND AS SUCH, THE ACTUAL QUANTITIES OF
EARTHWORK FROM SUCH ITEMS MAY VARY FROM THE ESTIMATE SHOWN
ABOVE.
M.S.D. STANDARD CONSTRUTION:
ALL STORM AND SANITARY SEWER STRUCTURES AND APPURTENANCES TO BE
DEDICATED TO MSD, OR TO BE PRIVATE UNDER MSD INSPECTION, SHALL
CONFORM TO THE METROPOLITAN ST. LOUIS SEWER DISTRICT, STANDARD
CONSTRUCTION SPECIFICATIONS FOR SEWERS AND DRAINAGE FACILITIES,
LATEST ADDITION. THAT WILL INCLUDE STANDARD CONSTRUCTION DETAILS
SHOWN THEREIN, AND SHALL INCLUDE ALL SUBSEQUENT CHANGES MADE
THERETO.
SOME RECENT CHANGES CONCERN PLASTIC PIPE MATERIAL AND PIPE FIELD
TESTING AND PERFORMANCE, AND INCLUDE THE FOLLOWING:
PART 2 - MATERIALS OF CONSTRUCTION
HIGH DENSITY POLYETHYLENE (HDPE) PIPE IS NOT ALLOWED FOR GRAVITY
SEWERS FOR STORM, COMBINED, OR SANITARY SEWERS THAT ARE "PUBLIC"
OR "PRIVATE UNDER MSD INSPECTION".
POLYPROPYLENE (PP) PIPE IS ALLOWED AS FOLLOWS FOR GRAVITY SEWERS
THAT ARE "PUBLIC" OR "PRIVATE UNDER MSD INSPECTION:
FOR USE IN SANITARY AND COMBINED SEWERS 12 TO 60 INCHES IN DIAMETER
IT SHALL CONFORM TO THE REQUIREMENTS OF ASTM F2764 "STANDARD
SPECIFICATION FOR 6 TO 60 IN. POLYPROPYLENE (PP) CORRUGATED DOUBLE
AND TRIPLE WALL PIPE AND FITTINGS FOR NON- PRESSURE SANITARY SEWER
APPLICATIONS."
FOR USE IN STORM SEWERS 12 TO 24 INCHES IN DIAMETER IT SHALL
CONFORM TO THE REQUIREMENTS OF ASTM F2881 "STANDARD SPECIFICATION
FOR 12 TO 60 IN. POLYPROPYLENE (PP) DUAL WALL PIPE AND FITTINGS FOR
NON-PRESSURE STORM SEWER APPLICATIONS;" OR
FOR USE IN STORM SEWERS 12 TO 60 INCHES IN DIAMETER IT SHALL
CONFORM TO THE REQUIREMENTS OF ASTM F2764 "STANDARD SPECIFICATION
FOR 6 TO 60 IN. POLYPROPYLENE (PP) CORRUGATED DOUBLE AND TRIPLE
WALL PIPE AND FITTINGS FOR NON- PRESSURE SANITARY SEWER
APPLICATIONS."
PART 4 - PIPE SEWER CONSTRUCTION
SECTION B, PIPE FIELD TESTS, PARAGRAPH 2, REACH INTEGRITY - DELETE THE
FIRST SENTENCE AND THE FOLLOWING APPLIES:
ALL SANITARY AND COMBINED SEWERS SHALL SUSTAIN A MAXIMUM LEAKAGE
LIMIT OF 100 GALLONS /INCH OF PIPE DIAMETER/ MILE OF LINE/DAY, AS
REQUIRED BY THE MISSOURI DEPARTMENT OF NATURAL RESOURCES
SPECIFICATIONS.
SECTION B, PIPE FIELD TESTS, PARAGRAPH 2, REACH INTEGRITY TESTING,
SUBPARAGRAPH C, INFILTRATION/ EXFILTRATION TESTING - DELETE THE SIXTH
SENTENCE, CONCERNING LEAKAGE LIMITS, AND THE FOLLOWING
REPLACEMENT APPLIES:
THE MEASUREMENT OF LEAKAGE SHALL NOT EXCEED 100 GALLONS/INCH OF
PIPE DIAMETER/MILE OF LINE/DAY, AS REQUIRED BY THE MISSOURI
DEPARTMENT OF NATURAL RESOURCES SPECIFICATIONS.
SECTION B, PIPE FIELD TESTS, PARAGRAPH 4, MANHOLE TESTING,
SUBPARAGRAPH A, VACUUM TESTING - AFTER THE FIRST SENTENCE, THE
FOLLOWING ADDITION APPLIES:
THE VACUUM TEST MUST BE PERFORMED PRIOR TO BACKFILLING AROUND
THE MANHOLE UNLESS THE CONTRACTOR PROVIDES DOCUMENTATION FROM
THE PRECAST MANHOLE MANUFACTURER STATING THAT THE MANHOLE MAY
BE VACUUM TESTED AFTER BACKFILLING HAS TAKEN PLACE. THE
CONTRACTOR MUST SUBMIT THIS DOCUMENTATION PRIOR TO BACKFILLING
AROUND ANY MANHOLE.
SECTION B, PIPE FIELD TESTS, PARAGRAPH 4, MANHOLE TESTING,
SUBPARAGRAPH B, EXFILTRATION TESTING - DELETE THE SECOND SENTENCE,
CONCERNING LEAKAGE LIMITS, AND THE FOLLOWING ADDITION APPLIES:
FOR EXFILTRATION TESTING, THE ALLOWABLE LEAKAGE LIMIT IS 100
GALLONS/INCH OF PIPE DIAMETER/MILE OF LINE/DAY WHEN THE AVERAGE
HEAD ON THE TEST SECTION IS THREE FEET (3') OR LESS.
SOILS ENGINEER WILL VERIFY THAT ALL COMPRESSIBLE MATERIAL HAS BEEN
REMOVED PRIOR TO FILL PLACEMENT AND THAT ALL FILL, UNDER SANITARY
AND STORM SEWER LINES CONSTRUCTED ABOVE ORIGINAL GRADE, HAS BEEN
COMPACTED TO 90% OF "MODIFIED PROCTOR". FILL IS TO BE PLACED IN A
MAXIMUM OF 9-INCH LIFTS. TEST SHALL BE TAKEN AT A MAXIMUM OF 50-FOOT
INTERVALS ALONG THE ROUTE OF THE PIPE; AT A MAXIMUM OF 2-FOOT
VERTICALLY; AND LATERALLY ON EACH SIDE OF THE PIPE, AT A DISTANCE
EQUAL TO THE DEPTH OF FILL OVER THE PIPE. A COPY OF THESE RESULTS
WILL BE SUBMITTED TO M.S.D. PRIOR TO CONSTRUCTION APPROVAL.
IF REINFORCED CONCRETE PIPE IS USED FOR SANITARY OR COMBINED
SEWERS LARGER THAN 27", ALL PIPE AND JOINTS SHALL CONFORM TO ASTM C
361. IN ADDITION, IF THE DIAMETER IS LARGER THAN 48", THE JOINT TYPE
MUST INCLUDE A GASKET THAT IS CONFINED IN A GROVE IN THE SPIGOT OF
THE PIPE.
PUBLIC SEWER MAINTENANCE:
MAINTENANCE OF THE SEWERS DESIGNATED "PUBLIC" SHALL BE THE
RESPONSIBILITY OF THE METROPOLITAN ST. LOUIS SEWER DISTRICT UPON
DEDICATION OF THE SEWERS TO THE DISTRICT.
TRENCH BACKFILL COMPACTION AND TESTING REQUIREMENTS: THE
CONTRACTOR IS TO REFER TO SECTION H OF THE METROPOLITAN ST. LOUIS
SEWER DISTRICT, STANDARD CONSTRUCTION SPECIFICATIONS FOR SEWERS
AND DRAINAGE FACILITIES, 2009 EDITION, TO ESTABLISH THE REQUIREMENTS
FOR SPECIFIC TYPE OF BACKFILL BEING USED.
LIMITS OF DISTURBANCE:
THE CONTRACTOR SHALL STAY WITHIN THE LIMITS OF DISTURBANCE AS
SHOWN ON THE PLANS AND MINIMIZE DISTURBANCE WITHIN THE WORK AREA
WHENEVER POSSIBLE.
BACKWATER VALVE NOTE:
A BACKWATER VALVE SHALL BE REQUIRED ON ALL BUILDING LATERALS PER
LOCAL PLUMBING CODE.
PROPOSED CONNECTIONS:
EXISTING DOMESTIC WATER AND PUBLIC SANITARY CONNECTIONS WILL BE
MODIFIED WITH THIS WORK.
26MSD-00157 - BASE MAP-07L
6. SCHOOL DISTRICT:
H
O
W
D
E
R
S
H
E
L
A
W
I
D
T
V
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
NOTE: UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED
FROM BEST AVAILABLE RECORDS, THEREFORE THE RELATIONSHIP BETWEEN
PROPOSED WORK AND EXISTING FACILITIES, STRUCTURES, AND UTILITIES MUST BE
CONSIDERED APPROXIMATE, AND IT IS THE CONTRACTORS RESPONSIBILITY TO
DETERMINE THEIR EXACT LOCATION AND THE EXISTENCE OF ANY NOT SHOWN.
ter ras pec
26MSD-00157 - BASE MAP-07L
Standard DNR Aluminum Disk stamped SL-119 situated in the grassy area west of the sidewalk near the northern end of right turn lane from the southeast bound Charbonier
Road onto southwest bound Howdershell Road
NAVD 88 (SLC2011a) EL = 577.03'
W
D
E
R
S
H
E
I
D
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
NOTE: SILTATION CONTROL FENCE REQUIRED ALONG THE ENTIRE LENGTH OF THE
CHARBONIER RD. FRONTAGE, INSIDE THE PROJECT / DISTURBANCE LIMITS INDICATED (APPROX.
900 LF). SILTATION CONTROL NOT SHOWN ON THESE PLANS FOR CLARITY PURPOSES.
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
U
I
P
U
I
P
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
U
I
P
NOTE: UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM BEST
AVAILABLE RECORDS, THEREFORE THE RELATIONSHIP BETWEEN PROPOSED WORK AND EXISTING
FACILITIES, STRUCTURES, AND UTILITIES MUST BE CONSIDERED APPROXIMATE, AND IT IS THE
CONTRACTORS RESPONSIBILITY TO DETERMINE THEIR EXACT LOCATION AND THE EXISTENCE OF ANY
NOT SHOWN.
ter ras pec
26MSD-00157 - BASE MAP-07L
1. PROVIDE TREE PROTECTION TO MAINTAIN
A HEALTHY GROWING CONDITION IN AREA
ADJOINING DEMOLITION AND GRADING.
2. ALL DEMOLITION NOT SPECIFICALLY
INDICATED BUT NECESSARY TO
COMPLETE THE PROJECT AS SHOWN
SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
3. CUTTING AND REMOVAL INDICATED ON
THE DRAWINGS ARE GENERAL
INDICATORS ONLY AND DO NOT
NECESSARILY REPRESENT THE FULL
EXTENT OF CUTTING AND REMOVAL
WHICH MAY BE REQUIRED BY THE JOB
CONDITIONS.
4. EXISTING TREES TO REMAIN UNLESS
OTHERWISE INDICATED. (PROTECT)
5. CONTRACTOR IS RESPONSIBLE FOR
INSTALLATION AND MAINTENANCE OF ALL
SILTATION CONTROL SHOWN AND OTHER
DEVICES THAT MAY BE REQUIRED.
6. CONTRACTOR TO LEGALLY DISPOSE OF
ITEMS EXCEPT THOSE INDICATED TO BE
REINSTALLED, SALVAGED, OR TO REMAIN
ON THE OWNER'S PROPERTY.
7. ALL EXISTING BELOW GROUND UTILITIES
TO BE PROTECTED AND USED IN PLACE
UNLESS OTHERWISE NOTED.
8. PROTECT IMPROVEMENTS INDICATED TO
REMAIN AGAINST DAMAGE AND SOILING
DURING DEMOLITION.
(TBR) TO BE REMOVED
EXISTING TREE TO BE REMOVED
EXISTING TREES TO REMAIN.
TREES TO BE PROTECT DURING
CONSTRUCTION OPERATIONS
REMOVE EXISTING TREE
REMOVE ASPHALT PAVEMENT AS INDICATED
REMOVE EXISTING CHAIN LINK FENCE (4' & 6' HT.)
REMOVE EXISTING FOUL BALL POLES
REMOVE EXISTING DUGOUTS
REMOVE EXISTING BACKSTOPS
REMOVE EXISTING DOUBLE GATE
REMOVE AND REPLACE EXIST. SIDEWALK AS
NECESSARY TO PERMIT INSTALLATION OF 12"Ø PIPE
UNDER WALK
EXISTING FENCE TO REMAIN
EXISTING ASPHALT PAVEMENT
TO REMAIN (PROTECT)
EXISTING TREE TO REMAIN
(PROTECT)
EXISTING LIGHT STANDARDS TO
REMAIN (PROTECT).
UNDERGROUND ELECTRIC TO BE
LOCATED AND NOT DISTURBED
DURING CONSTRUCTION.
DRINKING FOUNTAIN TO REMAIN
NOTE:
EXISTING BLEACHERS TO BE REMOVED AND STORED
PER OWNERS DIRECTION
Standard DNR Aluminum Disk stamped SL-119 situated in the grassy area west of the sidewalk near the northern end of right turn lane from the southeast bound Charbonier
Road onto southwest bound Howdershell Road
NAVD 88 (SLC2011a) EL = 577.03'
EXISTING PAVEMENT TO BE REMOVED
W
D
E
R
S
H
E
I
D
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
PROJECT LIMITS
PROJECT LIMITS
BMP RESERVE AREA 'A'
AMENDED SOILS
10' MIN. WIDTH (6837 SF)
BMP RESERVE AREA 'E'
AMENDED SOILS
20' WIDE (3906 SF)
BMP RESERVE AREA 'D'
AMENDED SOILS
10' WIDE (2487 SF)
BMP RESERVE AREA 'B'
AMENDED SOILS
10' WIDE (467 SF)
PROJECT LIMITS
EXP. JOINT TOOLED
JOINT
CONC.
PAV'T
EXP. JOINT TOOLED
JOINT
CONC.
PAV'T
RAMP /
HANDRAILS
STAIRS / HANDRAILS
BMP RESERVE AREA 'C'
AMENDED SOILS
10' WIDE (271 SF)
LIMITS OF FIELD SOD INSTALLATION - 4'
BEYOND THE SIDE TOUCH LINES AND
END GOAL LINES (TYPICAL)
(APPROX. 8914 SY)
NOTE: SEE LANDSCAPE SPECS FOR
FIELD SOD SPECIES
NOTE: SILTATION CONTROL FENCE REQUIRED ALONG THE ENTIRE LENGTH OF THE
CHARBONIER RD. FRONTAGE, INSIDE THE PROJECT / DISTURBANCE LIMITS INDICATED (APPROX.
900 LF). SILTATION CONTROL NOT SHOWN ON THESE PLANS FOR CLARITY PURPOSES.
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
U
I
P
U
I
P
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE (TYP)
PROJECT LIMITS
AMEND SOIL AND INSTALL SOD IN
AREA OF ASPHALT REMOVAL
NOTE: SEE LANDSCAPE SPECS FOR
AMENDED SOILS SOD SPECIES
(TYP.)
NEW SOCCER FIELD
NEW SOCCER FIELD
BMP RESERVE AREA 'F'
AMENDED SOILS
(7607 SF)
BMP RESERVE AREA 'G'
AMENDED SOILS
(2867 SF)
AMEND SOIL AND INSTALL SOD
IN AREA OF ASPHALT REMOVAL
LIMITS OF MSD
DISTURBANCE
LIMITS OF MSD DISTURBANCE
U
I
P
6' HT. PVC COATED CHAIN LINK FENCE,
SAME LOCATION AS 4' FENCE TO BE
REMOVED (470 LF)
LIMITS OF FIELD SOD INSTALLATION - 4'
BEYOND THE SIDE TOUCH LINES AND
END GOAL LINES (TYPICAL)
(APPROX. 8914 SY)
NOTE: SEE LANDSCAPE SPECS FOR
FIELD SOD SPECIES
6' HT. PVC COATED CHAIN LINK FENCE,
SAME LOCATION AS 4' FENCE TO BE
REMOVED (470 LF)
6' HT. PVC COATED CHAIN LINK FENCE,
SAME LOCATION AS 4' FENCE TO BE
REMOVED (470 LF)
NOTE: UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM BEST
AVAILABLE RECORDS, THEREFORE THE RELATIONSHIP BETWEEN PROPOSED WORK AND EXISTING
FACILITIES, STRUCTURES, AND UTILITIES MUST BE CONSIDERED APPROXIMATE, AND IT IS THE
CONTRACTORS RESPONSIBILITY TO DETERMINE THEIR EXACT LOCATION AND THE EXISTENCE OF ANY
NOT SHOWN.
ter ras pec
26MSD-00157 - BASE MAP-07L
FIELD "A"
11v11 SHOWN
SEE SHEET D1 FOR
FIELD DIMENSIONS
FIELD "B"
Standard DNR Aluminum Disk stamped SL-119 situated in the grassy area west of the sidewalk near the northern end of right turn lane from the southeast bound Charbonier
Road onto southwest bound Howdershell Road
NAVD 88 (SLC2011a) EL = 577.03'
FIELD "A" & "B"
SEE SHEET D1 FOR
FIELD DIMENSIONS
FIELD "A" & "B"
SEE SHEET D1 FOR
FIELD DIMENSIONS
11v11 SHOWN
SEE SHEET D1 FOR
FIELD DIMENSIONS
W
D
E
R
S
H
E
I
D
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
572.0±
568.3±
570.5±
566.9±
567.6±
FL563.6±
FL571.6±
FL564.1±
FL564.2±
569.8± 571.8±
565.8± 567.1±
10'± 12"Ø CPP @ 1.78%
570.1±
571.0±
569.2±
568.7±
569.6±
567.8±
569.5± 567.8±
566.8± 567.3±566.3±
570.8± 571.3±
570.3±
577.25±
577.35±
577.45±
576.0±
576.1±
574.75±
574.85±
575.5± 575.6±
574.5±
574.6±
579.55± 579.25±
578.75±
MATCH EX. GRADE 583.35±
579.15±
581.25±
581.35±
579.45±
MATCH EX. GRADE - 585.5±
571.0±
570.9±
571.1±
571.0± 571.7±
2.
2.
1.8
5±
1.3 5±
0.
0.
9.
573.0±
572.4±
572.5±
571.5±570.5±
570.6±
570.4± 570.5±
MATCH EX. GRADE
570.9±
570.4± 570.3±
572.0± 571.35±
574.1±
574.0±
575.0± 575.1±
PROJECT LIMITS
PROJECT LIMITS
BMP RESERVE AREA 'A'
AMENDED SOILS
10' MIN. WIDTH (6837 SF)
BMP RESERVE AREA 'E'
AMENDED SOILS
20' WIDE (3906 SF)
BMP RESERVE AREA 'D'
AMENDED SOILS
10' WIDE (2487 SF)
BMP RESERVE AREA 'B'
AMENDED SOILS
10' WIDE (467 SF)
PROJECT LIMITS
BMP RESERVE AREA 'C'
AMENDED SOILS
10' WIDE (271 SF)
LIMITS OF FIELD SOD INSTALLATION - 4'
BEYOND THE SIDE TOUCH LINES AND
END GOAL LINES (TYPICAL)
(APPROX. 8914 SY)
NOTE: SEE LANDSCAPE SPECS FOR
FIELD SOD SPECIES
NOTE: SILTATION CONTROL FENCE REQUIRED ALONG THE ENTIRE LENGTH OF THE
CHARBONIER RD. FRONTAGE, INSIDE THE PROJECT / DISTURBANCE LIMITS INDICATED (APPROX.
900 LF). SILTATION CONTROL NOT SHOWN ON THESE PLANS FOR CLARITY PURPOSES.
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
U
I
P
U
I
P
40'± 10"Ø CPP @ 2.0%
(PRIVATE)
FL571.0±
FL570.2±
572.0± 571.3±
571.65±
571.25±
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE (TYP)
PROJECT LIMITS
AMEND SOIL AND INSTALL SOD IN
AREA OF ASPHALT REMOVAL
NOTE: SEE LANDSCAPE SPECS FOR
AMENDED SOILS SOD SPECIES
(TYP.)
NEW SOCCER FIELD
NEW SOCCER FIELD
BMP RESERVE AREA 'F'
AMENDED SOILS
(7607 SF)
BMP RESERVE AREA 'G'
AMENDED SOILS
(2867 SF)
AMEND SOIL AND INSTALL SOD
IN AREA OF ASPHALT REMOVAL
LIMITS OF MSD
DISTURBANCE
LIMITS OF MSD DISTURBANCE
U
I
P
571.0±
CONC.
PAV'T
CONC.
PAV'T
6' CHAIN LINK FENCE
CONC. PAV'T
STAIRS / HANDRAILS
LIMITS OF FIELD SOD INSTALLATION - 4'
BEYOND THE SIDE TOUCH LINES AND
END GOAL LINES (TYPICAL)
(APPROX. 8914 SY)
NOTE: SEE LANDSCAPE SPECS FOR
FIELD SOD SPECIES
NOTE: UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM BEST
AVAILABLE RECORDS, THEREFORE THE RELATIONSHIP BETWEEN PROPOSED WORK AND EXISTING
FACILITIES, STRUCTURES, AND UTILITIES MUST BE CONSIDERED APPROXIMATE, AND IT IS THE
CONTRACTORS RESPONSIBILITY TO DETERMINE THEIR EXACT LOCATION AND THE EXISTENCE OF ANY
NOT SHOWN.
ter ras pec
26MSD-00157 - BASE MAP-07L
Standard DNR Aluminum Disk stamped SL-119 situated in the grassy area west of the sidewalk near the northern end of right turn lane from the southeast bound Charbonier
Road onto southwest bound Howdershell Road
NAVD 88 (SLC2011a) EL = 577.03'
GENERAL GRADING / LANDSCAPE NOTES:
1. TOP 4"-6" OF SOIL PLACED OVER ENTIRE PLAYING FIELD SURFACE SHALL BE HIGH QUALITY
TOPSOIL AS NOTED IN THE TECHNICAL SPECIFICATIONS - LANDSCAPE SECTION OF THESE
DRAWINGS.
2. SOCCER FIELD PLAYING SURFACES AND ADJOINING 10' STRIP SHALL BE SODDED PER
TECHNICAL SPECIFICATIONS, ALL OTHER AREAS DISTURBED BY CONSTRUCTION ACTIVITY
SHALL BE SEEDED AS SPECIFIED.
3. SOCCER FIELD PLAYING SURFACE GRADES SHALL BE SHALL BE ESTABLISHED UTILIZING
LASER-CONTROLLED GRADING EQUIPMENT TO ACHIEVE ±1/4 " TOLERANCES OVER 200 FEET.
ter ras pec
26MSD-00157 - BASE MAP-07L
A. CONTRACTOR SHALL ESTABLISH PERIMETER SILTATION CONTROL PRIOR TO ANY CONSTRUCTION ACTIVITIES. AREAS REQUIRING
MINOR CLEARING &/OR GRADING PRIOR TO INSTALLATION OF SILTATION CONTROL SHALL BE COMPLETED IN A TIMELY MANNER AND
SILTATION CONTROL ESTABLISHED IMMEDIATELY FOLLOWING.
B. EXISTING PARKING LOT TO BE USED AS TEMPORARY CONSTRUCTION PARKING WITH PUBLIC ACCESS WAYS. DURING MUDDY
CONDITIONS, DRIVERS OF VEHICLES WILL BE REQUIRED TO WASH THEIR WHEELS BEFORE ENTERING THE ROADWAY.
C. WASH DOWN AREA SHALL FOLLOW THE CONTOUR OF THE NATURAL TERRAIN TO THE EXTENT POSSIBLE. SLOPES SHALL NOT EXCEED
10 PERCENT SLOPE.
D. CONTRACTOR SHALL CLEAR AND GRUB THOSE AREAS OF THE SITE SCHEDULED FOR CONSTRUCTION. AREAS NOT SCHEDULED FOR
IMMEDIATE CONSTRUCTION SHALL NOT BE CLEARED OF ESTABLISHED VEGETATION UNTIL REQUIRED. REMAINDER OF SITE SHALL BE
GRADED, AS REQUIRED. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF SILTATION CONTROL
THROUGHOUT THE DURATION OF THE PROJECT.
E. ALL PROPOSED TURF AREAS, ONCE CONSTRUCTED TO FINAL GRADE, SHALL BE SODDED WITHIN 5 DAYS AFTER FINAL GRADING OF THE
SITE WHERE SHOWN ON THE PLAN. SHOULD WEATHER CAUSE DELAYS IN EARTHWORK OPERATIONS, ADDITIONAL SILTATION CONTROL
MEASURES MAY BE REQUIRED.
F. ANY DISTURBED AREAS WHICH WILL REMAIN UNWORKED FOR 5 DAYS OR MORE SHALL BE STABILIZED WITH SEEDING AND/OR
MULCHING PER SPECIFICATIONS WITHIN 5 DAYS. IF SEASONAL CONDITIONS PROHIBIT SEEDING, MULCHING OR MATTING SHALL BE USED.
G. INSPECTION OF SILTATION CONTROL DEVICES SHALL TAKE PLACE ONCE EVERY SEVEN DAYS AND WITHIN 48 HOURS AFTER A
RAINFALL THAT CAUSES STORM WATER RUNOFF TO OCCUR ONSITE. REPORTS MUST BE SENT TO CITY OF FLORISSANT ENGINEERING
DIVISION ON A WEEKLY BASIS. ANY SILTATION CONTROL IN NEED OF REPAIR SHALL OCCUR IMMEDIATELY.
H. ALL GRADING OPERATIONS ARE SUBJECT TO THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEERING REPORT.
I. SEDIMENTATION CONTROLS SHALL ONLY BE REMOVED AFTER THE SITE IS COMPLETELY STABILIZED, VEGETATION IS WELL
ESTABLISHED, AND ALL PAVEMENT AREAS ARE INSTALLED.
PARKING & WASH DOWN AREA (TC-4) = 1 EA. (TEMPORARY)
SILTATION FENCE = 417 LF. (TEMPORARY)
REMOVAL OF BMP'S (0.5 DAY)
2. SITE ADDRESS:
8. CONSTRUCTION SCHEDULE (TENTATIVE) - (STARTING DATE , AUGUST 1, 2026 - END , DECEMBER 31, 2026)
SITE GRADING (DURATION)
SEDIMENT/ EROSION CONTROL INSTALL (1 DAYS)
SEDIMENT/ EROSION CONTROL MAINTAIN (DURATION OF PROJECT)
MONTH-APRIL MONTH-JULY
3. SITE INFORMATION:
SEEDING/ SODDING (1 DAY)
5.
6. PERMIT HOLDER
9. CLEARING TECHNIQUES THAT RETAIN EXISTING VEGETATION TO THE MAX EXTENT PRACTICABLE SHALL BE USED AND THE TIME
PERIOD FOR DISTURBED AREAS TO BE WITHOUT VEGETATIVE COVER SHALL BE MINIMIZED TO THE EXTENT PRACTICAL.
ADDITIONAL SILTATION CONTROL SHALL BE INSTALLED AS REQUIRED BY CITY OF FLORISSANT ENGINEERING DIVISION.
10. AREAS SHALL BE SEEDED AFTER CLEARING AND GRUBBING WHEN NO ACTIVITY WILL OCCUR WITHIN THIRTY DAYS.
A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND A MAJOR LAND DISTURBANCE (MLD)
PERMIT WILL BE REQUIRED PRIOR TO ANY GRADING ON THE SITE, BEYOND WHAT IS APPROVED ON THIS PLAN.
DESCRIPTION OF B.M.P.'S (INTERIM & PERMANENT STABILIZATION PRACTICES/SCHEDULE)
11. TABLE OF BEST MANAGEMENT PRACTICES (BMP'S) QUANTITIES
TABLE 1- LIST OF BEST MANAGEMENT PRACTICES
PLANNED RESPONSE TO LOSS OF CONTAINED SEDIMENT B.M.P.'S SHALL BE REPAIRED AND/OR REPLACED IMMEDIATELY, AS REQUIRED, TO STABILIZE SITE AND CONTAIN SEDIMENT-LADEN RUNOFF. OFFSITE AREAS SHALL BE REVIEWED FOR EXTENT OF IMPACT FROM B.M.P.
FAILURE. PERMIT HOLDER SHALL BE REQUIRED TO PROVIDE DOCUMENTATION OF THE B.M.P. MEASURES INSTALLED AND SCHEDULED
MAINTENANCE AND REPAIRS. PERMIT HOLDER SHALL ALSO BE REQUIRED TO CONTACT THE CITY OF FLORISSANT ENGINEERING DIVISION
AND REPORT ALL INCIDENTS OF FAILURE AND PROVIDE DOCUMENTATION OF ACTIONS AND B.M.P. MEASURES. DESCRIPTION OF
PERMANENT B.M.P.'S TO REMAIN AFTER CONSTRUCTION
A. TURF AREAS - TURF AREAS SHALL BE MAINTAINED TO INSURE SITE AREAS REMAIN STABILIZED UPON COMPLETION OF
CONSTRUCTION ACTIVITIES.
B. PAVED AREAS AND WALKWAYS - AREAS SUBJECT TO FOOT AND VEHICLE TRAFFIC SHALL BE PAVED AND KEPT IN GOOD REPAIR
FOLLOWING COMPLETION OF CONSTRUCTION ACTIVITIES. MAINTENANCE SHALL BE THE OWNER'S RESPONSIBILITY.
12. ANY LAND CLEARING, CONSTRUCTION, OR DEVELOPMENT INVOLVING THE MOVEMENT OF EARTH SHALL BE IN ACCORDANCE WITH
THE STORM WATER POLLUTION PREVENTION PLAN, AND THE PERSON ISSUED A LAND DISTURBANCE PERMIT ASSUMES AND
ACKNOWLEDGES RESPONSIBILITY FOR COMPLIANCE WITH THE ST. LOUIS COUNTY LAND DISTURBANCE CODE AND THE APPROVED
STORM WATER POLLUTION PLAN AT THE SITE OF THE PERMITTED ACTIVITY.
13. DESCRIPTION OF B.M.P.'S TO PREVENT POTENTIAL POLLUTANTS (CONSTRUCTION WASTES, TOXIC OR HAZARDOUS SUBSTANCES, PETROLEUM PRODUCTS, PESTICIDES, HERBICIDES, SITE LITTER, SANITARY WASTES, ETC.)
A. SOLID NON-HAZARDOUS CONSTRUCTION WASTE - DISPOSE OF IN TRASH DUMPSTERS OR APPROVED EQUIVALENT IN A LOCATION
APPROVED BY THE OWNER. POTENTIALLY SOLUBLE OR LEACHABLE SOLID WASTE SHALL BE STORED OFF THE GROUND AND IN COVERED
LEAK-PROOF CONTAINERS. SOLID WASTE SHALL BE PROPERTY DISPOSED OF OFF-SITE ON A REGULAR BASIS.
B. HAZARDOUS WASTE - HAZARDOUS WASTE SHALL BE SEGREGATED FROM NON-HAZARDOUS CONSTRUCTION SITE DEBRIS. LIQUID OR
SEMI-LIQUID HAZARDOUS WASTE SHALL BE STORED IN APPROPRIATE CONTAINERS (CLOSED DRUMS OR SIMILAR) AND SHALL BE KEPT
UNDER COVER. GRANULAR, SOLUBLE OR LEACHABLE HAZARDOUS WASTE MATERIALS SHALL BE STORED OFF THE GROUND AND IN
COVERED LEAK-PROOF CONTAINERS. THE OWNER SHALL PROPERLY APPROVE ANY HAZARDOUS WASTE STORAGE AREA LOCATIONS.
C. HAZARDOUS WASTE SHALL BE PROPERLY DISPOSED OF OFF-SITE ON A REGULAR BASIS BY A REPUTABLE, LICENSED HAZARDOUS
WASTE HAULER. D. IT IS NOT THE INTENT OF THIS SWPPP TO SUPERSEDE OR REPLACE NORMAL SITE ASSESSMENT AND REMEDIATION
PROCEDURES CONCERNING HAZARDOUS MATERIALS. SIGNIFICANT SPILLS AND/OR CONTAMINATION WARRANT AN IMMEDIATE
RESPONSE BY TRAINED PROFESSIONALS. SUSPECTED JOB SITE CONTAMINATION SHOULD IMMEDIATELY BE REPORTED TO
REGULATORY AUTHORITIES AND PROTECTIVE MEASURES TAKEN.
E. ON-SITE FUELING FACILITIES ARE REQUIRED TO ADHERE TO ALL APPLICABLE FEDERAL AND STATE REGULATIONS CONCERNING
STORAGE AND DISPENSERS.
F. PROVISIONS SHALL BE MADE SO THAT A SUFFICIENT NUMBER OF TEMPORARY TOILET FACILITIES ARE AVAILABLE TO SERVE THE
NUMBER OF WORKERS ON-SITE.
A. PERMIT HOLDER SHALL NOTIFY ALL CONTRACTORS AND OTHER ENTITIES (INCLUDING UTILITY CREWS, CITY/COUNTY
EMPLOYEES, OR THEIR AGENTS) THAT WILL PERFORM WORK AT THE SITE, OF THE EXISTENCE OF THE STORM WATER
POLLUTION PREVENTION PLAN (SWPPP) AND WHAT ACTIONS OR PRECAUTIONS SHALL BE TAKEN WHILE ON SITE TO
MINIMIZE THE POTENTIAL FOR EROSION AND THE POTENTIAL FOR DAMAGING ANY BEST MANAGEMENT PRACTICES
(BMP'S).
B. PERMIT HOLDER SHALL DETERMINE THE NEED FOR AND ESTABLISH TRAINING PROGRAMS TO ENSURE THAT ALL SITE
WORKERS HAVE BEEN TRAINED, AT A MINIMUM, IN EROSION CONTROL, MATERIAL HANDLING AND STORAGE, AND
HOUSEKEEPING.
C. PERMIT HOLDER SHALL PROVIDE COPIES OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) TO ALL
PARTIES WHO ARE RESPONSIBLE FOR INSTALLATION, OPERATION OR MAINTENANCE OF ANY BEST MANAGEMENT
PRACTICES (BMP'S). D. PERMIT HOLDER SHALL MAINTAIN A CURRENT COPY OF THE STORM WATER POLLUTION
PREVENTION PLAN (SWPPP) ON THE SITE AT ALL TIMES.
7. PRIOR TO ANY MAJOR LAND DISTURBANCE ACTIVITY, A LAND DISTURBANCE PERMIT FROM THE STATE OF MISSOURI
DEPARTMENT OF NATURAL RESOURCES IS REQUIRED.
NOTE: SCHEDULE DURATION'S ARE SUBJECT TO CHANGE DUE TO WEATHER CONDITIONS. SOME OPERATIONS WILL
HAVE OVERLAP TIME FRAMES.
CITY OF FLORISSANT
SWPPP NOTES
1. SITE OWNER:
4. NO FLOODPLAIN ON SITE PER FERM# 29189C0061 K
TOTAL DISTURBED (PROJECT) AREA 298,3040 S.F. 6.85 ACRES
14. THE SWPPP SHALL HAVE SUFFICIENT INFORMATION TO BE OF PRACTICAL USE TO CONTRACTORS AND SITE CONSTRUCTION
WORKERS TO GUIDE THE INSTALLATION AND MAINTENANCE OF BMP'S. TEMPORARY STABILIZATION IS TO TAKE PLACE WHERE SOIL
DISTURBING ACTIVITIES WILL CEASE ON ANY PORTION OF THE SITE AND ARE NOT PLANNED TO RESUME FOR A PERIOD EXCEEDING 14
CALENDAR DAYS. TEMPORARY STABILIZATION MUST BE INITIATED IMMEDIATELY UPON KNOWING THE DURATION IS MORE THAN 14 DAYS.
TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN 7 CALENDAR DAYS. SLOPES FOR DISTURBED AREAS MUST BE DEFINED IN THE
SWPPP. A SITE MAP OR MAPS, DEFINING THE SLOPED AREAS FOR ALL PHASES OF THE PROJECT, MUST BE INCLUDED IN THE SWPPP.
THE TYPES OF BMP'S USED MUST BE SUITED TO THE AREA DISTURBED, TAKING INTO ACCOUNT THE NUMBER OF ACRES EXPOSED AND
THE STEEPNESS OF THE SLOPES. IF THE SLOPE OF THE AREA IS GREATER THAN 3:1 (3 FEET HORIZONTAL TO 1 FOOT VERTICAL) OR IF
THE SLOPE IS GREATER THAN 3% AND GREATER THAN 150 FEET IN LENGTH, THAN THE PERMITEE MUST ESTABLISH TEMPORARY
STABILIZATION WITHIN 7 DAYS OF CEASING OPERATION ON THAT PART OF THE SITE. FINAL STABILIZATION OF DISTURBING AREAS MUST
BE INITIATED IMMEDIATELY AND COMPLETED WITHIN 7 CALENDAR DAYS WHENEVER ANY CLEARING, GRADING, EXCAVATING OR OTHER
EARTH DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED ON ANY PORTION OF THE SITE. ALLOWANCES TO THE 7 DAY COMPLETION
PERIOD FOR TEMPORARY AND FINAL STABILIZATION MAY BE MADE DUE TO WEATHER OR EQUIPMENT MALFUNCTIONS. THE USE OF
ALLOWANCES SHALL BE DOCUMENTED IN THE SWPPP. A SITE MAP SHOWING THE OUTLINES OF THE TOTAL PROJECT AREA, THE AREAS
TO BE DISTURBED, ARES THAT WILL NOT BE DISTURBED, EXISTING LAND USES, LOCATIONS OF OFF-SITE MATERIALS, WASTE, BORROW, AND EQUIPMENT STORAGE AREAS, LOCATIONS AND NAMES OF SURFACE WATER BODIES THE SITE DRAINS TO, AREAS OF FINAL
STABILIZATION, LOCATIONS OF FLOOD PLAINS, LOCATIONS OF TEMPORARY AND PERMANENT BEST MANAGEMENT PRACTICES (BMP), LOCATIONS OF OUTFALLS, LOCATION(S) OF PORTA-POTTIES , GAS TANKS, DUMPSTERS, ETC. WITH UPDATES AND LOCATION CHANGES
AND SUCH OTHER INFORMATION AS MAY BE REQUIRED BY THE COUNTY DEPARTMENT(S) HAVING ENFORCEMENT AUTHORITY AND
RESPONSIBILITIES DESCRIBED IN SECTION 103.0 OF THE CODE. THE PERMITEE SHALL ENSURE THE BMP'S ARE PROPERLY INSTALLED AT
THE LOCATIONS AND RELATIVE TIMES SPECIFIED IN THE SWPPP. PERIPHERAL OR BORDER BMP'S TO CONTROL RUNOFF FROM
DISTURBED AREAS SHALL BE INSTALLED OR MARKED FOR PRESERVATION BEFORE GENERAL SITE CLEARING IS STARTED. NOTE THAT
THIS REQUIREMENT DOES NOT APPLY TO EARTH DISTURBANCES RELATED TO INITIAL SITE CLEARING AND ENTRY ESTABLISHMENT, EXIT
AND ACCESS OF THE SITE, WHICH MAY REQUIRE THAT STORMWATER CONTROLS BE INSTALLED IMMEDIATELY AFTER THE EARTH
DISTURBANCE. STORM WATER DISCHARGES FROM DISTURBED AREAS WHICH LEAVE THE SITE, SHALL PASS THROUGH AN APPROPRIATE
IMPEDIMENT TO SEDIMENT MOVEMENT, SUCH AS A SEDIMENTATION BASIN, SEDIMENT TRAPS, SILT FENCES, ETC., PRIOR TO LEAVING THE
AND DISTURBANCE SITE. A DRAINAGE COURSE CHANGE SHALL BE CLEARLY MARKED ON A SITE MAP AND DESCRIBED IN THE SWPPP.
F) UNCONTAMINATED PUMPED GROUND WATER
G) DISCHARGE FROM POTABLE WATER SOURCES
H) FOUNDATION DRAINS
I) AIR CONDITIONING CONDENSATION
J) IRRIGATION WATER, SPRINGS
K) WATER FROM CRAWL SPACE PUMPS
I) FOOTING DRAINS
M) LAWN WATERING
N) INDIVIDUAL RESIDENT CAR WASHING
O) FLOWS FROM RIPARIAN HABITATS AND WETLANDS
P) DE-CHLORINATED SWIMMING POOL DISCHARGES
Q) STREET WASH WATER
R) RESIDENTIAL BUILDING WAS WATERS, WITHOUT DETERGENTS
DISCHARGES OR FLOWS FROM FIRE FIGHTING ACTIVITIES OCCUR DURING EMERGENCY SITUATIONS. THE PERMITTEE IS NOT EXPECTED
TO EVALUATE FIRE FIGHTING DISCHARGES WITH REGARD TO POLLUTANT CONTRIBUTIONS. THEREFORE, THESE DISCHARGES ARE
AUTHORIZED AS ALLOWABLE NON-STORM WATER DISCHARGES, UNLESS IDENTIFIED, BY EPA, AS SIGNIFICANT SOURCES OF POLLUTANTS
TO WATERS OF THE U.S.
SEDIMENT SHALL BE WASHED FROM ALL VEHICLES AT WASH DOWN STATION PRIOR TO LEAVING THE SITE. NO TRACKING OF MUD ONTO
ANY ROADS SHALL BE ALLOWED.
THE U.S. EPA "NATURAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)" WEBSITE IS LOCATED AT :
HTTP://CFPUB.EPA.GOV/NPDES OR WWW.EPA.GOV/NE/NPDES/PERMITS/PERMIT_FINAL_MS4.PDF
THE FOLLOWING NON-STORM WATER DISCHARGES ARE AUTHORIZED BY THE EPA PROVIDED IT HAS BEEN DETERMINED BY THE
PERMITTEE THAT THEY ARE NOT SIGNIFICANT CONTRIBUTORS OF POLLUTANTS TO THE MS4. IMPLEMENTATION OF POLLUTION
PREVENTION MEASURES FOR NON STORM WATER DISCHARGES IS REQUIRED FOR SIGNIFICANT CONTRIBUTORS.
A) WATER LINE FLUSHING.
B) LANDSCAPE IRRIGATION
C) DIVERTED STREAM FLOWS
D) RISING GROUND WATER
E) UNCONTAMINATED GROUND WATER INFILTRATION (AS DEFINED AT 40 CFR 35.2005(20))
TEMPORARY STABILIZATION IS TO TAKE PLACE WHERE SOIL DISTURBING ACTIVITIES WILL CEASE ON ANY PORTION OF THE SITE AND ARE
NOT PLANNED TO RESUME FOR A PERIOD EXCEEDING 14 CALENDAR DAYS. TEMPORARY STABILIZATION MUST BE INITIATED IMMEDIATELY
UPON KNOWING THE DURATION IS MORE THAN 14 DAYS. TEMPORARY STABILIZATION MUST BE COMPLETED WITHIN 7 CALENDAR DAYS.
IF THE SLOPE OF THE AREA IS GRATER THAN 3:1 (3 FEET HORIZONTAL TO 1 FOOT VERTICAL) OR IF THE SLOPE IS GREATER THAN 3% AND
GREATER THAN 150 FEET IN LENGTH, THEN THE PERMITEE MUST ESTABLISH TEMPORARY STABILIZATION WITHIN 7 DAYS OF CEASING
OPERATION ON THAT PART OF THE SITE. FINAL STABILIZATION OF DISTURBED AREAS MUST BE INITIATED IMMEDIATELY AND COMPLETED
WITHIN 7 CALENDAR DAYS WHENEVER ANY CLEARING, GRADING, EXCAVATING, OR OTHER EARTH DISTURBING ACTIVITIES HAVE
PERMANENTLY CEASED ON ANY PORTION OF THE SITE. ALLOWANCES TO THE 7 DAY COMPLETION PERIOD FOR TEMPORARY AND FINAL
STABILIZATION MAY BE MADE DUE TO WEATHER OR EQUIPMENT MALFUNCTIONS. THE USE OF ALLOWANCES SHALL BE DOCUMENTED.
15. LOCATE STATE AND COUNTY LAND DISTURBANCE PERMITS, BMP INSPECTION REPORTS, ETC. WITH THE SWPPP.
16. 404/401 PERMIT NOT REQUIRED FOR THE SITE. NO DISCHARGE TO GOVERNED WATERS PROPOSED.
17. NO VISIBLE EVIDENCE OF SINKHOLES, SPRINGS, SEEPS OR KRAST FEATURES ON SITE.
18. NO HISTORIC PROPERTIES ON SITE.
19. ENDANGERED SPECIES:
BASED ON CATALOGED INFORMATION FROM THE UNITED STATES FISH & WILDLIFE SERVICE FEDERALLY LISTED ENDANGERED
OR THREATENED SPECIES ARE PRESENT NEAR OR WITHIN THE PROJECT AREA. THE FOLLOWING IS A LIST OF THE
ENDANGERED OR THREATENED SPECIES NEAR OR WITHIN THE PROJECT AREA: GRAY BAT, INDIANA BAT, MEAD'S
MILKWEED, DECURRENT FALSE ASTER, RUNNING BUFFALO CLOVER, PINK MUCKET, SCALESHELL MUSSEL, SPECTACLECASE, SNUFFBOX MUSSEL, SHEEPNOSE MUSSEL, PALID STURGEON.
20. NO NON-STORM WATER DISCHARGES PROPOSED.
21. NO DEWATERING METHODS PROPOSED.
CITY OF FLORISSANT
955 RUE ST. FRANCIS
FLORISSANT, MO 63031
SWPPP AND ALL LAND DISTURBANCE PERMITS
WILL BE VIEWABLE ONSITE AT THE
CONSTRUCTION TRAILER.
5.
11. TABLE OF BEST MANAGEMENT PRACTICES (BMP'S) QUANTITIES
TABLE 1- LIST OF BEST MANAGEMENT PRACTICES
KOCH PARK
KOCH PARK
2302 CHARBONIER ROAD
FLORISSANT, MO 63031
pec
W
D
E
R
S
H
E
I
D
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
10'± 12"Ø CPP @ 1.78%
PROJECT LIMITS
PROJECT LIMITS
BMP RESERVE AREA 'A'
AMENDED SOILS
10' MIN. WIDTH (6837 SF)
BMP RESERVE AREA 'E'
AMENDED SOILS
20' WIDE (3906 SF)
BMP RESERVE AREA 'D'
AMENDED SOILS
10' WIDE (2487 SF)
BMP RESERVE AREA 'B'
AMENDED SOILS
10' WIDE (467 SF)
PROJECT LIMITS
BMP RESERVE AREA 'C'
AMENDED SOILS
10' WIDE (271 SF)
NOTE: SILTATION CONTROL FENCE REQUIRED ALONG THE ENTIRE LENGTH OF THE
CHARBONIER RD. FRONTAGE, INSIDE THE PROJECT / DISTURBANCE LIMITS INDICATED (APPROX.
900 LF). SILTATION CONTROL NOT SHOWN ON THESE PLANS FOR CLARITY PURPOSES.
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
U
I
P
U
I
P
40'± 10"Ø CPP @ 2.0%
(PRIVATE)
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE (TYP)
PROJECT LIMITS
BMP RESERVE AREA 'F'
AMENDED SOILS
(7607 SF)
BMP RESERVE AREA 'G'
AMENDED SOILS
(2867 SF)
LIMITS OF MSD
DISTURBANCE
LIMITS OF MSD DISTURBANCE
U
I
P
PROPOSED BMP DRAINAGE AREA MAP
ter ras pec
26MSD-00157 - BASE MAP-07L
NEW IMPERVIOUS AREA SHEET FLOW TO
FILTER STRIP IN AMENDED SOILS
DISTURBED AREA THIS DEVELOPMENT
AMENDED SOILS
FL567.0±
FL564.0±
FL565.5±
380'± 6" SOLID SCH 40 PVC @ 0.79%
FL563.6±
FL565.5±FL564.4±
FL565.0±
FL564.5±
FL568.5±
FL568.5± FL568.5±
FL568.5±
FL568.5±
FL569.0± FL569.0± FL569.0±
FL569.0± FL569.5±
FL569.5±
FL569.5±
FL569.5± FL570.0±
FL570.0±
FL570.0± FL570.0±
FL565.5±
4" Ø
P
ER
FO
RA
TE
D
S
CH
PV
C
(T
YP
266'± (TOTAL LENGTH) 6" SOLID SCH 40 PVC @ 0.71%204'± (TOTAL LENGTH) 6" SOLID SCH 40 PVC @ 0.60%
FL569.0±
FL568.5±
FL569.0±
FL569.5±
FL569.5± FL570.0±
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
FL564.2±
DAYLIGHT
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
FL569.0±
FL569.0± FL569.0±
FL569.0±
FL569.25±
FL569.25± FL569.5± FL569.5±
FL569.5± FL569.75±
FL569.75±
FL569.75±
FL570.0± FL570.0±
FL570.0±
FL570.0± FL570.25±
4" Ø
P
ER
FO
RA
TE
D
S
CH
PV
C
(T
YP
FL569.25±
FL569.0±
FL569.5±
FL569.5±
FL570.0± FL570.25±
FL563.6±
DAYLIGHT
PROJECT LIMITS
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE
U
I
P
1-1/2"
A1
1-1/2"
A3
1-1/2"
A4
1-1/2"
A6
1-1/2"
A10
1-1/2"
A2
1-1/2"
A5
1-1/2"
A8
1-1/2"
A9
1-1/2"
A7
2"
2"
2"
2"
2"
2"
2"
2"
1" 1"
1" 1"
1" 1"
1"
1"
1"
1"
1" 1"
1"
1"
1" 1"
1"
1"
1"
1"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
2"
2"
2"
2"
2"
2"
2"
2"
2"
1" 1"
1"
1"
1" 1"
1"
1"
1"
1"
1" 1"
1"
1"
1"1"
1"
1"
1"
1"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1 1/4"
1-1/2"
B1
1-1/2"
B2
1-1/2"
B3
1-1/2"
B4
1-1/2"
B5
1-1/2"
B6
1-1/2"
B7
1-1/2"
B8
1-1/2"
B9
1-1/2"
B10
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
TO EXIST. 4" PVC WATER
LINE - LOCATION APPROX.
APPROX. LOCATION OF
EXIST. 4" PVC WATER LINE
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
PROJECT LIMITS
U
I
P ter ras pec
26MSD-00157 - BASE MAP-07L
NOTE: UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN PLOTTED FROM BEST
AVAILABLE RECORDS, THEREFORE THE RELATIONSHIP BETWEEN PROPOSED WORK AND EXISTING
FACILITIES, STRUCTURES, AND UTILITIES MUST BE CONSIDERED APPROXIMATE, AND IT IS THE
CONTRACTORS RESPONSIBILITY TO DETERMINE THEIR EXACT LOCATION AND THE EXISTENCE OF ANY
NOT SHOWN.
IRRIGATION LEGEND
1-1/2"
A1
IRRIGATION GENERAL NOTES
pec
26MSD-00157 - BASE MAP-07L
ALT. #2 - Sand Base under Sod
ALT. #3 - Field Underdrain Systems
W
D
E
R
S
H
E
I
D
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
NOTE: SILTATION CONTROL FENCE REQUIRED ALONG THE ENTIRE LENGTH OF THE
CHARBONIER RD. FRONTAGE, INSIDE THE PROJECT / DISTURBANCE LIMITS INDICATED (APPROX.
900 LF). SILTATION CONTROL NOT SHOWN ON THESE PLANS FOR CLARITY PURPOSES.
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
U
I
P
U
I
P
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE (TYP)
PROJECT LIMITS
LIMITS OF MSD
DISTURBANCE
LIMITS OF MSD DISTURBANCE
U
I
P
H
O
W
D
E
R
S
H
E
I
D
R
I
E
S
CHARBONIER ROAD (WIDTH VARIES)
10'± 12"Ø CPP @ 1.78%
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
NOTE: SILTATION CONTROL FENCE REQUIRED ALONG THE ENTIRE LENGTH OF THE
CHARBONIER RD. FRONTAGE, INSIDE THE PROJECT / DISTURBANCE LIMITS INDICATED (APPROX.
900 LF). SILTATION CONTROL NOT SHOWN ON THESE PLANS FOR CLARITY PURPOSES.
U I P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U
I
P
U .I.P
U
I
P
U
I
P
40'± 10"Ø CPP @ 2.0%
(PRIVATE)
PROJECT LIMITS
PROJECT LIMITS
PROJECT LIMITS
LIMITS OF MSD DISTURBANCE (TYP)
LIMITS OF MSD DISTURBANCE (TYP)
PROJECT LIMITS
LIMITS OF MSD
DISTURBANCE
LIMITS OF MSD DISTURBANCE
U
I
P ter ras pec
26MSD-00157 - BASE MAP-07L
DA1
DA1
SCALE: 1"=
5050 25 100
50'
EXISTING ON-SITE (PROJECT AREA) DRAINAGE QUANTITY
15 YEAR, 20 MIN STORM
PI (PERV) = 1.70
PI (IMPERV) = 3.54
TOTAL EXISTING PERVIOUS - DA1 (3.06 cfs) + DA2 (6.60 cfs) + DA3 (0.48 cfs) + DA4 (0.31) + DA5 (0.25) = 10.70 cfs
TOTAL EXISTING IMPERVIOUS - DA1 (0.00 cfs) + DA2 (0.00 cfs) + DA3 (0.04 cfs) + DA4 (0.61) + DA5 (0.60) = 1.25 cfs
TOTAL EXISTING Q 11.95 cfs
PROPOSED ON-SITE (PROJECT AREA) DRAINAGE
QUANTITY
15 YEAR, 20 MIN STORM
PI (PERV) = 1.70
PI (IMPERV) = 3.54
TOTAL PROPOSED PERVIOUS - DA1 (2.91 cfs) + DA2 (6.46 cfs) + DA3 (0.34 cfs) + DA4 (0.60 cfs) + DA5 (0.41 cfs) = 10.72 cfs
TOTAL PROPOSED IMPERVIOUS - DA1 (0.32 cfs) + DA2 (0.35cfs) + DA3 (0.25 cfs) + DA4 (0.00cfs) + DA5 (0.28 cfs) = 1.20 cfs
TOTAL PROPOSED Q 11.92 cfs
SCALE: 1"=
5050 25 100
50'
I. EARTHWORK
1. PROJECT CONDITIONS
EXISTING UTILITIES: LOCATE EXISTING UNDERGROUND UTILITIES IN AREAS OF EXCAVATION WORK. IF UTILITIES ARE INDICATED TO
REMAIN IN PLACE, PROVIDE ADEQUATE MEANS OF SUPPORT AND PROTECTION DURING EARTHWORK OPERATIONS.
SHOULD UNCHARTED OR INCORRECTLY CHARTED, PIPING OR OTHER UTILITIES BE ENCOUNTERED DURING EXCAVATION, CONSULT
UTILITY OWNER IMMEDIATELY OR DIRECTIONS. COOPERATE WITH OWNER AND UTILITY COMPANIES IN KEEPING RESPECTIVE
SERVICES AND FACILITIES IN OPERATION. REPAIR DAMAGED UTILITIES TO SATISFACTION OF UTILITY OWNER.
PROTECTION OF PERSONS AND PROPERTY: BARRICADE OPEN EXCAVATIONS OCCURRING AS PART OF THIS WORK.
PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT, AND OTHER HAZARDS CREATED BY EARTHWORK OPERATIONS.
PERFORM EXCAVATION BY HAND WITHIN DRIPLINE OF LARGE TREES TO REMAIN. PROTECT ROOT SYSTEMS FROM DAMAGE OR
DRY OUT TO THE GREATEST EXTENT POSSIBLE. MAINTAIN MOIST CONDITION FOR ROOT SYSTEM AND COVER EXPOSED
ROOTS WITH MOISTENED BURLAP.
2. SOIL MATERIALS
SUBBASE MATERIAL: NATURALLY OR ARTIFICIALLY GRADED MIXTURE OF NATURAL OR CRUSHED GRAVEL, CRUSHED STONE, CRUSHED SLAG AND NATURAL OR CRUSHED SAND.
BACKFILL AND FILL MATERIALS: SATISFACTORY SOIL MATERIALS FREE OF CLAY, ROCK OR GRAVEL LARGER THAN 2 INCHES IN ANY
DIMENSION, DEBRIS, WASTE, FROZEN MATERIALS, VEGETATION AND OTHER DELETERIOUS MATTER.
3. EXCAVATION
EARTH EXCAVATION INCLUDES EXCAVATION OF PAVEMENTS AND OTHER OBSTRUCTIONS VISIBLE ON SURFACE; UNDERGROUND
STRUCTURES, UTILITIES AND OTHER ITEMS INDICATED TO BE DEMOLISHED AND REMOVED; TOGETHER WITH EARTH AND OTHER
MATERIALS ENCOUNTERED THAT ARE NOT CLASSIFIED AS ROCK.
4. DEWATERING
PREVENT SURFACE WATER AND SUBSURFACE OR GROUND WATER FROM FLOWING INTO EXCAVATIONS AND FROM FLOODING
PROJECT SITE AND SURROUNDING AREA.
DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. REMOVE WATER TO PREVENT SOFTENING OF FOUNDATION BOTTOMS, UNDERCUTTING AND FOUNDATIONS. PROVIDE AND MAINTAIN PUMPS, WELL POINTS, SUMPS, SUCTION AND DISCHARGE
LINES AND OTHER DEWATERING SYSTEM COMPONENTS NECESSARY TO CONVEY WATER AWAY FROM EXCAVATIONS.
ESTABLISH AND MAINTAIN TEMPORARY DRAINAGE DITCHES AND OTHER DIVERSIONS OUTSIDE EXCAVATION LIMITS TO CONVEY
RAINWATER AND WATER REMOVED FROM EXCAVATIONS TO COLLECTING OR RUNOFF AREAS. DO NOT USE TRENCH
EXCAVATIONS AS TEMPORARY DRAINAGE DITCHES.
5. STORAGE OF EXCAVATED MATERIALS
STOCKPILE EXCAVATED MATERIALS ACCEPTABLE FOR BACKFILL AND FILL WHERE DIRECTED. PLACE, GRADE AND SHAPE STOCKPILES
FOR PROPER DRAINAGE.
LOCATE AND RETAIN SOIL MATERIALS AWAY FROM EDGE OF EXCAVATIONS. DO NOT STORE WITHIN DRIP LINE OF TREES INDICATED
TO REMAIN.
6. EXCAVATION FOR STRUCTURES
CONFORM TO ELEVATIONS AND DIMENSIONS SHOWN WITHIN A TOLERANCE OF PLUS OR MINUS 0.10 FOOT AND EXTENDING A
SUFFICIENT DISTANCE FROM FOOTINGS AND FOUNDATIONS TO PERMIT PLACING AND REMOVAL OF CONCRETE FORM WORK, INSTALLATION OF SERVICES AND OTHER CONSTRUCTION AND FOR INSPECTION.
EXCAVATIONS FOR FOOTINGS AND FOUNDATIONS: DO NOT DISTURB BOTTOM OF EXCAVATION. EXCAVATE BY HAND TO FINAL
GRADE JUST BEFORE CONCRETE REINFORCEMENT IS PLACED. TRIM BOTTOMS TO REQUIRED LINES AND GRADES TO LEAVE
SOLID BASE TO RECEIVE OTHER WORK.
7. EXCAVATION FOR PAVEMENTS
CUT SURFACE UNDER PAVEMENTS TO COMPLY WITH CROSS-SECTIONS, ELEVATIONS AND GRADES AS INDICATED.
8. COLD WEATHER PROTECTION
PROTECT EXCAVATION BOTTOMS AGAINST FREEZING WHEN ATMOSPHERIC TEMPERATURE IS LESS THAN 35 DEGREES
9. BACKFILL AND FILL
GENERAL: PLACE SOIL MATERIAL IN LAYERS TO REQUIRED SUBGRADE ELEVATIONS FOR EACH AREA CLASSIFICATION LISTED BELOW.
UNDER GRASSED AREAS, USE SATISFACTORY EXCAVATED OR BORROW MATERIAL.
UNDER WALKS AND PAVEMENTS, USE SUBBASE MATERIAL, SATISFACTORY EXCAVATED OR BORROW MATERIAL OR A
COMBINATION.
UNDER STEPS, USE SUBBASE MATERIAL.
BACKFILL EXCAVATIONS AS PROMPTLY AS WORK PERMITS, BUT NOT UNTIL COMPLETION OF THE FOLLOWING:
ACCEPTANCE OF CONSTRUCTION BELOW FINISH GRADE.
REMOVAL OF CONCRETE FORMWORK.
REMOVAL OF TRASH AND DEBRIS FROM EXCAVATION.
10. PLACEMENT AND COMPACTION
GROUND SURFACE PREPARATION: REMOVE VEGETATION, DEBRIS, OBSTRUCTIONS AND DELETERIOUS MATERIALS FROM GROUND
SURFACE PRIOR TO PLACEMENT OF FILLS. PLOW STRIP, OR BREAK UP SLOPED SURFACES STEEPER THAN 1 VERTICAL TO 4
HORIZONTAL…