XLSX spreadsheet 12 KB Posted

Attached to
Wash Bay Pumping for Various Locations District 8
Solicitation number
ARFQ 0803 DOT2500000006 1
Issued by
Nicholas County, West Virginia

About this file

This file is a pricing exhibit for an open-end contract for pump wash bay services serving District 8 operations across multiple West Virginia counties. The contract covers oil-water separator tank pumping services at fifteen locations, including substations and headquarters facilities in Pendleton, Pocahontas, Randolph, and Tucker counties. The service requires a minimum of one annual pumping per location for 1,500-gallon tanks, with three locations requiring additional capacity: District 8 Headquarters and Tucker County HQ each need 4,500-gallon capacity pumping, while Randolph County HQ requires 3,000-gallon capacity pumping. The total estimated quantity across all line items is 28,500 gallons of service annually. The requisition number is 0824-0673.

The exhibit presents a pricing page with fourteen line items specifying unit costs and total costs for each location's pumping service, though the actual dollar amounts are not populated in the provided document. The pricing structure is on a per-location basis with individual unit cost and total cost columns for contractor bidding purposes. This format allows bidders to propose pricing for the recurring annual service at each specified facility location.

View the file

Other files

File Type Posted
Final_ARFQ_0803_DOT2500000006_1_WV_ARFQ_FORM.PDF PDF
ARFQ DOT2500000006_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Exhibit A - Pricing Page
Open-End Contract of Pump Wash Bay Service for D8
Item NumberEstimated QuantityUnit of MeasureDescriptionUnit CostTotal
11500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Judy Gap Substation
21500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year.Pendleton County HQ
31500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Sugar Grove Substation
41500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Greenbank Substation
51500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Hillsboro Substation
61500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Pocahontas County HQ
71500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Coalton Substation
84500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of oncea year. District 8 Headquarters
91500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of oncea year. District 8 Eq.Shop
101500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Mill Creek Substation
111500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Pickens Substation
123000Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Randolph County HQ
131500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Valley Head Substation
141500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Thomas Substation
154500Gallons1500 Gallon Tank / Oil Water Seperator to be pumped a minimum of once a year. Tucker County HQ

&14Requsition# 0824-0673