Exhibit 6 Standard Drawing 610.pdf

PDF 258 KB Posted

Attached to
2026 South Douglas (District 7) MIM Paving Project
Solicitation number
S-73000-00016803
Issued by
Douglas County, Oregon

About this file

Exhibit 6 Standard Drawing 610 is a technical specification document for the State of Oregon's Department of Transportation and Douglas County's 2026 South Douglas (District 7) MIM Paving Project. The document provides standard engineering drawings and specifications for pavement construction work along Interstate 5 between mile points 94.3 and 92.35 in Douglas County, Oregon. The project scope includes cold plane pavement removal, application of emulsified asphalt tack coat (Level 4), and placement of 1/2-inch dense asphalt concrete pavement four inches deep. Standard Drawing 610 establishes the technical requirements, material specifications, and construction standards that contractors must follow when executing the paving operations on this highway segment.

The standard drawing serves as a binding technical reference document that ensures consistency and quality in the pavement construction process. All contractors submitting bids for the 2026 South Douglas MIM Paving Project must comply with the specifications outlined in Exhibit 6 Standard Drawing 610, which details proper installation procedures, material grades, compaction requirements, and quality assurance protocols. This document is integral to the bid package and establishes the baseline engineering standards against which all contractor work will be evaluated and inspected during project execution.

View the file

Other files

File Type Posted
00016803 Invitation to Bid.docx DOCX document
Exhibit 5 Specifications 2026 South Douglas D7 MIM Paving.pdf PDF
00016803 Bid Pricing Form.xlsx XLSX spreadsheet
00016803 Bid Results.xlsx XLSX spreadsheet
00016803 ATT B Sample Contract.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RD610

DETAILS

PAVEMENT (ACP)

ASPHALT CONCRETE

R D

.d g n

25-JUL-2017N/A

J U

L

1" in 5'

Feather base course Taper 1" in 5'

AT GRAVEL APPROACHES

METHOD OF FEATHERING ACP PAVEMENT

OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE

ACP PAVEMENT MATCH AT PROJECT ENDS

METHOD OF MATCHING EXTG. ACP INLAY SURFACING

TABLE 1

METHOD A *

METHOD B *

TAPER LENGTHS

ACP wearing course

(When present)

Feather ACP base course

Extg. pvmt.

See "EDGE DETAIL"

Extg. pvmt.

wearing course thkn.

ACP unfeathered

See project plans for method.

Taper (See Table 1)

Cold plane pvmt. removal

Taper (See Table 1)

Cold plane pvmt. removal

Posted Speed Taper Length

1" per 50'45 mph

1" per 100'> 45 mph

See "EDGE DETAIL"

Extg. pvmt.

wearing course thkn.

ACP unfeathered top ACP base course

Construct non-feathered

(See "EDGE DETAIL")

Top of ACP base, Extg. pvmt.

ACP wearing course

(When present)

Feather ACP base course

Extg. gravel surfacewearing course thkn.

ACP unfeathered

Thkn. - Var. (2" to 0)

Aggr. base

Thkn. - Var. (2" to 0)

(When present)

Asph. conc. base course

(Thkn. as shown on plans)

ACP wearing course

Extg. pvmt.

Thkn. - 2"

(When present)

ACP base course e x tg p v m t.

E d g e o f

See "EDGE DETAIL"

ACP wearing courseExtg. pvmt.

See "EDGE DETAIL"

Extg. A.C. pvmt.

Cold plane pvmt. removal

(Inlay to extg. asphalt conc. pvmt.)

not acceptable

Mill edge as shown

Nom. depth

Sawcut & seal

EDGE DETAIL

the current Oregon Standard Specifications.

All materials shall be in accordance with

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

DATE

SDR

BOOK NO.

CALC.

Effective Date: June 1, 2026 - November 30, 2026

Professional Engineer.

first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with

Standard Drawing, while

The selection and use of this

File details come from the government source that posted it. Updated .