Exhibit_6_Initial_Deficiency_Report_(IDR)_Sample.docx
DOCX document 17 KB Posted
- Solicitation number
- DCAM-27-NC-IFB-0008
- Issued by
- District of Columbia
About this file
This document is an Initial Deficiency Report (IDR) template issued by the District of Columbia Government's Department of General Services for the Turnkey District-Wide Conveyance System Inspection, Testing, Maintenance and Break/Fix Services contract (DCAM-27-NC-IFB-0008). The template provides a standardized format for qualified District-licensed elevator contractors to document the baseline condition assessment of elevators, escalators, lifts, and other conveyance equipment located at various District-owned and/or operated facilities. The IDR captures comprehensive facility and unit information, operational condition summaries, code compliance and safety assessments, mechanical and electrical systems evaluations, maintenance and reliability assessments, and deficiency identification with categorization by severity and priority levels.
The IDR template requires contractors to certify that all assessment findings were completed using accepted industry methodologies, that all conditions and deficiencies have been fully and accurately documented based on direct physical inspection, and that no deficiencies have been omitted, minimized, reclassified, or altered. The report must identify specific deficiencies with descriptions, components affected, severity levels, code references, safety and operational impacts, recommended corrective actions, priority assignments, estimated costs, and associated supporting documentation. Additionally, the template addresses modernization needs with rationale tied to ASME, NEC, OEM, or lifecycle requirements. The completed IDR is submitted to the Contracting Officer and Contracting Officer's Technical Representative in Excel (unlocked) or Excel and searchable PDF formats, either via email or through District-designated platforms such as Salesforce.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INITIAL DEFICIENCY REPORT (IDR) Contract No.: _____________ Contractor: ________________ Aggregate Group(s): __________ Submission Date: ______________ Assessment Completion Date: ____________ Submitted To:
Contracting Officer (CO): __________________ Contracting Officer’s Technical Representative (COTR): __________________
SECTION 1 – FACILITY & UNIT INFORMATION
Facility Name: __________________________________________ Facility Address: ________________________________________ Ward: _____________________ Building Type: __________________________________________ Conveyance Identification Number (UID): ____________________ Equipment Type (Elevator, Escalator, Lift, etc.): ___________ Manufacturer: ____________________________________________ Model Number: ____________________________________________ Serial Number: ____________________________________________ Installation Date: _______________________ Modernization Date: _____________________ Controller Type: __________________________________________ Drive Type: ______________________________________________ Number of Floors/Stops: ___________________________________ Current Operational Status: _______________________________ Inspection Certificate Status: ______________________________ DOB Permit Information: ____________________________________ Last Inspection Date: ______________________________________ Last Category Test Date: ___________________________________
SECTION 2 – BASELINE CONDITION ASSESSMENT
2.1 Operational Condition Summary
Operational Condition: ______________________________________ Ride Quality Observations: _________________________________ Leveling Accuracy: _________________________________________ Acceleration/Deceleration: _________________________________ Door Operation: ____________________________________________ Dispatch Performance: ______________________________________ Noise/Vibration Issues: _____________________________________ Emergency & Recall Systems: ________________________________ Emergency Power Operation: _________________________________ Reliability & Shutdown/Nuisance Failure History: ____________________________________
2.2 Code Compliance & Safety Condition
Current Code Compliance Status (ASME A17.x, NEC, OSHA, ADA, DOB, DLCP):
Safety Condition Summary: _______________________________________________ Expired Certificates Identified: _________________________________________ Unstable, Unsafe, or Non‑Code-Compliant Conditions:
Observed Hazards (check all that apply):
• Failed safety devices
• Deficient guarding
• Trip hazards
• Water intrusion
• Oil leakage
• Corrosion
• Inaccessible or non‑conforming equipment
• Obsolete or recalled equipment
• Non‑functional emergency systems Notes: _________________________________________________________________
SECTION 3 – MECHANICAL, ELECTRICAL & SYSTEMS ASSESSMENT
3.1 Mechanical Assessment Findings
Hoist Machine Condition: ____________________________________ Motor / Gearbox / Sheave Condition: _________________________ Bearings & Guide Assemblies: _______________________________ Hydraulic Components (cylinders, pistons, packing): __________ Door Operators/Rollers/Tracks: _____________________________ Brakes/Ropes/Buffers: ______________________________________ Lubrication Systems: _______________________________________ Additional Notes: __________________________________________
3.2 Electrical & Controls Assessment Findings
Controller Condition: _______________________________________ Relays/Contactors/VFDs: ____________________________________ Wiring & Traveling Cables: __________________________________ Disconnect Switches: _______________________________________ Safety Circuits & Communication Systems: ____________________ Software Logic & Selector Systems: __________________________ Fire Recall Integration: ____________________________________ Battery Backup & Emergency Lighting: ________________________ NEC Article 620 Compliance Verification: ______________________ Additional Notes: __________________________________________
SECTION 4 – MAINTENANCE & RELIABILITY ASSESSMENT
Current Maintenance Condition: ______________________________ Evidence of Deferred Maintenance: ___________________________ Repeat Failure Frequency: ___________________________________ Chronic Outage History: _____________________________________ Callback Patterns: __________________________________________ Inspection & Test History Summary: __________________________ OEM Supportability Status: ___________________________________ Availability of Replacement Parts: ___________________________ Maintenance Accessibility: ___________________________________ Estimated Remaining Useful Life (RUL): ________________________
SECTION 5 – DEFICIENCY IDENTIFICATION (Complete List) All deficiencies must be listed in this section.
No omissions, reclassification, or minimization permitted.
For each deficiency, complete the fields below:
Deficiency No. ___ Description: _______________________________________________ Component/System: __________________________________________ Category (Operational / Safety / Code / Mechanical / Electrical / Deferred Maintenance / Obsolescence / Chronic Failure): _____________________ Severity Level (Low / Moderate / High / Critical): ____________ Code Reference (if applicable): ______________________________ Safety Impact: _____________________________________________ Operational Impact: _________________________________________ Recommended Corrective Action: ______________________________ Priority Level (Immediate / 30 Days / 90 Days / Capital Planning): _____________ Estimated Corrective Action Cost: ____________________________ Estimated Duration: _________________________________________ Associated Photos: Yes / No Photo File Names: __________________________________________ Supporting Notes: __________________________________________
SECTION 6 – MODERNIZATION NEEDS
Modernization Requirement Identified: _________________________ Modernization Rationale: _____________________________________ ASME, NEC, OEM or Lifecycle Basis: __________________________ Estimated Cost: ____________________________________________ Recommended Timeline: ______________________________________
SECTION 7 – CONTRACTOR CERTIFICATION
The Contractor certifies that:
• All Assessment findings were completed using accepted industry methodologies;
• All conditions and deficiencies have been fully, accurately, and professionally documented;
• All findings are based on direct physical inspection and evaluation;
• No deficiency has been omitted, minimized, re‑classified, or otherwise altered;
• The Initial Deficiency Report is complete, accurate, and compliant with all Contract requirements.
Certified By: __________________________________________ Title: _________________________________________________ Date: _________________________________________________
SECTION 8 – SUBMISSION DETAILS
Submitted To:
• Contracting Officer (CO): ______________________________
• Contracting Officer’s Technical Representative (COTR): ______________________________ Submission Format: