About this file
This document is a 50% design plan and typical sections exhibit for the Santa Ana Delhi Channel (F01) project, prepared by OC Public Works in July 2023. The exhibit provides detailed engineering drawings for a channel improvement project spanning from Upper Newport Bay to Mesa Drive, featuring multiple segments including an upper segment, lower segment, and a bridge area. The design includes 17.5-foot maintenance roads, multi-use trails (both 6' and 10' wide), concrete-clad retaining structures, cable railings, and a new bridge with 24" octagonal prestressed concrete piles. The project involves right-of-way adjustments, consideration of coastal salt marsh areas, and integration with existing ground and infrastructure.
The design drawings illustrate complex topographical and engineering considerations, showing varying right-of-way lines, elevation changes, and environmental constraints. The project appears to be part of a larger infrastructure improvement initiative, with careful attention to existing environmental features like low flow areas, wetlands, and the Newport Beach Golf Course. The typical sections reveal precise measurements for road widths, trail configurations, and structural elements, suggesting a comprehensive approach to channel modification that balances engineering requirements with environmental preservation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x x x
17.5'
R/W R/W
OCFCD RIGHT-OF-WAY
F01
LC
23.5 46'-60'
5.5'-8.5'12.5'-17.7'
100-YR W.S.
UPPER SEGMENT (STA. 19+75 TO 36+80)
NTS
EXISTING
CL FENCE
EXISTING
LOW FLOW
WETLAND
AREA
CABLE
RAILING
CABLE
RAILING
MAINT.
ROAD
CONCRETE-CLAD
RETAINING STRUCTURE
17.5-21.5'
CONCRETE
MAINTENANCE
ROAD
6' CL
FENCE
x x x
NEWPORT BEACH
GOLF COURSE
20'-26'
100-YR W.S.
ELEV+3'
EXISTING
GROUND
40'-90'
11.7'
23.5'
R/W R/W
OCFCD RIGHT-OF-WAY
LC
BRIDGE AREA (STA. 8+08)
NTS
7'
OC PARKS CDFW
EXIST.
LOW FLOW
COASTAL
SALT
MARSH
EXIST.
GROUND
NEW BRIDGE
DECK
NEW BRIDGE
RAILING
NEW BRIDGE
ABUTMENT
24" OCTAGONAL PRESTRESSED
CONCRETE PILES (TOTAL 6)
(TYP AT EACH ABUTMENT)
CONCRETE-CLAD
RETAINING STRUCTURE
- SEE WALL OPTIONS
CONCRETE-CLAD
RETAINING STRUCTURE -
SEE WALL OPTIONS
10'
35'
PILE EMBED
DEPTH
F01
185'
80'5'
24" OCTAGONAL PRESTRESSED
CONCRETE PILES (TOTAL 6)
(TYP AT EACH ABUTMENT)
NEW BRIDGE
ABUTMENT
EXIST.
GROUND
EXISTING
GROUND
100-YR W.S.
T
T TT
40+34
2+00
4+00
6+00
8+00
10+00
12+00
14+00
16+00
18+00
+0
22+00
24+0026+00
28+00
30+00
32+00
34+00
36+00
+0
+0 x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxxxxxxxxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x
17.5' MAINTENANCE ROAD
14' AC TRAIL
17.5' MAINTENANCE ROAD COASTAL SALT
MARSH AREA
R/W LINE
R/W LINE
DELHI CHANNEL CL ALIGNMENT
R/W LINE
NEW BRIDGE
6' DG MULTI-USE TRAIL
10' DG MULTI-USE
TRAIL
EXISTING FENCE LINE
R/W LINE
ACCESS RAMP
TURN AROUND
AREA
20'-26' MAINTENANCE ROAD
20'-26' MAINTENANCE ROAD
20'-26' MAINTENANCE
ROAD
DG MULTI-USE AREA
10' DG MULTI-USE TRAIL
R/W R/W
OCFCD RIGHT-OF-WAY
F01
LC
LOWER SEGMENT (STA. 9+75 TO 19+75)
NTS
12.5'-17.7'
23.5'
100-YR W.S.
132'-160'
20'-24'
8'-17'
6'-10'14'
CABLE
RAILING
CONCRETE-CLAD
RETAINING STRUCTURE
EXIST.
LOW FLOW
MAINT.
ROAD
COASTAL
SALT
MARSH
CABLE RAILING
DG MULTI-USE
TRAIL
EXIST.
GROUND
14' AC TRAIL
x x xEXISTING
CL FENCE 17.5'
17.5-21.5'
EXISTING
GROUND
0 150
SCALE IN FEET
N
SANTA ANA DELHI CHANNEL (F01) - UPPER NEWPORT BAY TO MESA DRIVE SCALE:
DATE:
50% DESIGN
JULY 2023
NTS
PLAN AND TYPICAL SECTIONS
C
G E
O P
W \D
S
\D M
S
4\
S A
D C
A
LT
D S
LO
P
E V
E R
- P N
T Y
P S
E C
TS
.D
W G
| Sheets and Views |
| EXHIBIT |
File details come from the government source that posted it. Updated .