Morrison Bridge Stair Removal – Special Provisions Document

This is a Special Provisions document issued by the Oregon Department of Transportation (ODOT) for a bridge demolition and stair removal project located on the Morrison Bridge in Multnomah County, Oregon along Pacific Highway (HWY No. 001). The work consists of traffic control implementation, removal of pedestrian stairs and associated surfacing, placement of ecology blocks per plans, and construction of miscellaneous paving and curb work. The project requires substantial completion by May 1, 2027, with final completion by May 15, 2027. The contractor must provide a project schedule at least seven days prior to the pre-construction meeting, which must be scheduled at least 35 days before construction commencement. The contractor shall work continuously seven days per week once work begins. Specific traffic control requirements are detailed, including lane closures limited to nighttime hours (10:00 p.m. to 8:00 a.m. Friday through Sunday on Morrison Bridge, and 10:00 p.m. to 6:00 a.m. on other roadways), with mandatory notification to multiple agencies including ODOT Traffic Management Operations Center, Multnomah County Bridge Maintenance, and Portland Bureau of Transportation at least 72 hours before closures. The contractor must obtain an approved City of Portland Temporary Street Use Permit and coordinate with TriMet regarding bus stop impacts.

The contract applies the 2024 Oregon Standard Specifications for Construction with specific modifications detailed throughout the special provisions. Key environmental and safety requirements include compliance with OSHA regulations, ANSI Z 133.1 safety standards, and the Manual of Uniform Traffic Control Devices (MUTCD). An asbestos survey performed in February 2026 (Structure Survey, MBM25-074) identified no asbestos-containing materials on the structure. The contractor is responsible for providing quality control and quality assurance, with the Project Manager retaining the right to test and reject materials not meeting specifications at no additional cost to the State. Agency-furnished materials include ecology blocks provided at Republic Services storage yard (49 SE Alder) and permanent fencing at stair landings that the contractor must remove and store on-site for Agency staff retrieval. Bridge load restrictions limit combined construction vehicle weight to 65,000 pounds per 1,000 square feet of surface area or 200,000 pounds per span, whichever is less. Invoices must be submitted with a certified statement and sent to ODOT Region 1 (123 NW Flanders St, Portland, OR 97209) with copies to R1-Admin-Invoicing@odot.oregon.gov. The project is classified as a State Project with no separate payment for mobilization costs, traffic control plan development, environmental protection measures, or asbestos removal work.

View the file

Other files

File Type Posted
Exhibit 6 - Plans~12.pdf PDF
00017858_Invitation to Bid.docx DOCX document
Att A Form A-2 - Bid Pricing Form~2.xlsx XLSX spreadsheet
Attachment B - Sample Contract~19.docx DOCX document
Exhibit 7 - Morrision Bridge Interchange Existing Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PROVISIONS

FOR HIGHWAY MAINTENANCE CONSTRUCTION

OREGON DEPARTMENT OF TRANSPORTATION

SALEM, OREGON

BRIDGE DEMOLITION

MORRISON BRIDGE STAIR REMOVAL

PACIFIC HIGHWAY (HWY NO. 001)

MULTNOMAH COUNTY

SEPTEMBER 2026

This page intentionally blank

Morrison Bridge Stair Removal iii

TABLE OF CONTENTS FOR SPECIAL PROVISIONS

WORK TO BE DONE

COMPLETION TIME LIMIT

SUPPLEMENTAL SPECIAL PROVISIONS

UTILITY INFORMATION

AGENCY FURNISHED MATERIALS

APPLICABLE SPECIFICATIONS

CLASS OF PROJECT

SECTION 00210 - MOBILIZATION

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC

CONTROL

SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS

SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES

SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES

SECTION 00228 - TEMPORARY PEDESTRIAN AND BICYCLIST ROUTING

SECTION 00270 - TEMPORARY FENCES

SECTION 00290 - ENVIRONMENTAL PROTECTION

SECTION 00295 - ASBESTOS MATERIALS

SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SECTION 00350 - GEOSYNTHETIC INSTALLATION

SECTION 00501 - BRIDGE REMOVAL

SECTION 00553 – ECOLOGY BLOCK PLACEMENT

SECTION 00641 - AGGREGATE SUBBASE, BASE, AND SHOULDERS

SECTION 00730 - EMULSIFIED ASPHALT TACK COAT

SECTION 00740 - COMMERCIAL ASPHALT CONCRETE PAVEMENT (CACP)

SECTION 00759 - MISCELLANEOUS PORTLAND CEMENT CONCRETE

STRUCTURES

SECTION 02110 – POSTS, BLOCKS, AND BRACES

SECTION 02630 – BASE AGGREGATE

SECTION 02910 - SIGN MATERIALS

This page intentionally blank

WORK TO BE DONE

The Work to be done under this Contract consists of the following:

1. Traffic Control.

2. Remove pedestrian stairs and associated surfacing

3. Place “Ecology Blocks” per plans.

4. Construct miscellaneous paving and curb.

Perform additional and Incidental Work as called for by the Specifications and Plans.

COMPLETION TIME LIMIT

• Substantially complete all work to be done under the contract by May 1st, 2027

• Complete all work to be done under the contract not later than May 15th, 2027.

SUPPLEMENTAL SPECIAL PROVISIONS

1. The quantities in the bid item list are intended to serve only as a guide to bidders, and are not to be construed as a guarantee. All quantities are estimated, and are for bid purposes only. The quantity for each bid item includes all labor, equipment and materials for all activities associated with this project. The Oregon Department of Transportation (ODOT) reserves the right to adjust quantities and add or delete, as needed.

2. Contractor shall provide a schedule to the Project Manager at least 7 days prior to the pre-construction meeting to allow for review.

3. Contractor shall schedule a pre-construction meeting with the Project Manager at least 35 days prior to the proposed start of construction.

4. Contractor shall notify the Project Manager at least 35 calendar days prior to any closure of the I-5 northbound onramp.

5. Contractor shall obtain and provide a copy of the approved City of Portland Temporary

Street Use Permit.

6. The Engineer will perform the Agency responsibilities described in the Construction Surveying Manual for Contractors, Chapter 1.5 (see Section 00305).

7. The Contractor shall perform the Contractor responsibilities described in the Construction Surveying Manual for Contractors, Chapter 1.6 (see Section 00305). The Contractor shall perform slope staking including intersections and set stakes defining limits for clearing which approximate Right-of-Way and easements.

8. Cooperation with Other Contractors – The Agency reserves the right to perform other work on or near the Project Site, including, without limitation, any Materials site, with forces other than those of the Contractor.

If such work takes place on or near the Project Site, the Contractor shall have the following obligations:

• The Contractor shall coordinate Work with other contractors or forces.

• The Contractor shall cooperate in good faith with all other contractors or forces.

• The Contractor shall perform the Work specified in the Contract in a way that will minimize interference and delay for all forces involved.

• The Contractor shall place and dispose of the Materials being used so as not to interfere with the operations of other forces.

• The Contractor shall join the Work with that of all other forces in a manner acceptable to the Engineer or the Agency, and shall perform it in the accepted sequence with the work of the other force.

The Project Manager will resolve any disagreements under this supplemental special provision that may arise among the Contractor and other work forces, or between the Contractor and the Agency. The Project Managers decision in these matters is final.

When the schedules for Work of the Contractor and the work of other forces overlap, each contractor involved shall submit a current, realistic progress schedule to the Project Manager.

Before the Project Manager accepts the schedule, each party shall have the opportunity to review all schedules. After this review and any necessary consultations, the Project Manager will determine acceptable schedules.

The Contractor waives any right it may have to make claims against the Agency for any damages or claims that may arise because of inconvenience, delay, or loss due solely to the presence of other contractors working on or near the Project Site.

9. Contractor shall work continuously, seven (7) days a week, at a site once work has begun. The expectation is substantial work will be accomplished daily

10. Contractor shall provide weigh slips for each load of material measured on the weight basis placed in performance of Work under the Contract. Contractor to collect all weigh slips during the shift and give the group of them to the inspector at the end of the shift.

11. Contractor is responsible for providing quality control and quality assurance for the project. The Project Manager reserves the right to take and re-test material samples, and based upon such test results, to reject any material not meeting the referenced Specifications. It is agreed and understood that the Contractor shall replace all rejected material with material meeting the Specifications at no additional cost to the State.

12. Changes to the scope and/or limits of work are to be requested in writing to the Owners Authorized Representative. The Owners Authorized Representative will respond in writing with approval or denial of the change(s). ADA ramp upgrades that are triggered due to unauthorized changes to the scope and/or limits of work are the Contractors responsibility to remedy. Contractor, or their designated representative, will design and construct the ADA ramp upgrades per ODOT standards at no expense to the Agency. ADA ramp upgrades must follow the triggering activity in a timely manner.

13. Contractor’s employees and their subcontractors may not wear clothing, hats, vests, etc. that have the ODOT name or “flying T” symbol.

14. There is public interest in the work. Contractor is advised to use courtesy and respect in any work site interaction with the public and to refer all public relations matters to the ODOT Project Manager.

15. Contractor shall implement safety policies, procedures and practices in conformance with all applicable local, state and federal laws, rules and regulations including but not limited to:

a. Applicable OSHA safety regulations

b. ANSI Z 133.1 Safety standards agreed upon by ODOT and local jurisdiction

c. The Manual of Uniform Traffic Control Devices (MUTCD)

d. Any other applicable safety laws, regulations and codes.

16. All equipment utilized during this contract shall be in good and serviceable condition.

17. Correspondence for the project is required to have the project name in the subject line.

18. The invoices, certified payrolls (if applicable) and project submittals are to be submitted via email to the Agency Authorized Representative.

19. Invoices must have the following certified statement on them along with a signature by the Contractor’s Authorized Representative.

“I the undersigned, hereby certify that the above bill is true and correct and that payment has not been received. Signature: _______________________”

20. Invoices are to have the contract number and service period listed on them and the following billing address:

ODOT Region 1 123 NW Flanders St Portland, OR 97209

a. Invoices submitted via email shall be sent to the Agency Authorized Representative and the Region 1 Invoices in-box:

R1-Admin-Invoicing@odot.oregon.gov

21. Responsibility for Damage to Property and Facilities – In addition to the provisions of Section G.1, the Contractor, Contractor’s agents, Subcontractors, and all workers performing Work under the Contract (collectively, the “Contractor”), shall:

a. Determine the location of all properties and facilities, Agency and Non-Agency, that could be damaged by the Contractor’s operation, and protect them from damage;

b. Provide adequate protection to avoid damaging Agency and Non-Agency property and facilities;

c. Be responsible for damage to Agency and Non-Agency property and facilities caused by or resulting from the Contractor’s operations;

d. Clean up and restore such damage to the condition that existed before the damage, by repair, rebuilding, replacement, or compensation, as determined by the Engineer;

e. Protect monuments and property marks until the Engineer has authorized their removal;

f. Provide temporary facilities when needed until the required repair, rebuilding, or replacement is accomplished.

22. In addition to the project schedule submitted according to Section H.2.1, the Contractor shall submit the following:

• A supplemental 3 week “look ahead” schedule

• A monthly update to the project schedule

a. Supplemental “Look Ahead” Schedule - The supplemental "look ahead" Project Work schedule shall:

• Identify the sequencing of activities and time required for prosecution of the Work.

• Provide for orderly, timely, and efficient prosecution of the Work.

• Contain sufficient detail to enable both the Contractor and the Engineer to plan, coordinate, analyze, document, and control their respective Contract responsibilities.

The supplemental "look ahead" Project Work schedule shall be written in common terminology and show the planned Work activities broken down into logical, separate activities by area, stage, and size and include the following information:

• The resources the Contractor, Subcontractors, or services will use.

• The locations of each activity that will be done including the limits of the Work by mile posts, stations, or other indicators.

• The time frames of each activity by Calendar Days, shifts, and hours.

• All anticipated Shoulder, lane, and road closures.

At a minimum, the Contractor shall prepare a bar chart that:

• Shows at least 3 weeks of activity including the week the bar chart is issued.

• Uses a largest time scale unit of 1 Calendar Day. Smaller time scale units may be used if needed.

• Is appropriate to the activities.

• Identifies each Calendar Day by month and day.

Include the Contract name, Contract number, Contractor's name, and date of issue on each page of the bar chart.

The Contractor shall submit the supplemental "look ahead" Project Work schedule starting with the initial project schedule and continuing each week until all punch list items, final trimming, and clean-up has been completed. The Contractor shall meet with the Engineer each week to review the supplemental "look ahead" Project Work schedule. If the Engineer or the Contractor determines that the current supplemental "look ahead" Project Work schedule requires changes or additions, either notations can be made on the current schedule or the Engineer may require the submittal of a revised supplemental "look ahead" Project Work schedule. Review of the current and subsequent supplemental "look ahead" Project Work schedules does not relieve the Contractor of responsibility for timely and efficient execution of the Contract.

b. Monthly Update – The Contractor shall update the project schedule submitted under Section H.2.1 monthly, beginning one calendar month after initial submittal. The monthly update shall include the following at a minimum:

• Sufficient narrative to describe the past progress, anticipated activities, and stage

Work;

• A description of any current and expected changes or delaying factors and their effect on the construction schedule; and

• Proposed corrective actions

23. In addition to the provisions of Section H.2.1 and the above requirements, the Contractor shall submit a digital copy of all project schedules, “look ahead” schedules, and monthly updates compatible with the current version of Microsoft Project, the current version of Primavera P6 by Oracle, or another scheduling program approved by the Engineer.

UTILITY INFORMATION

The Project is located within the area served by the Oregon Utility Notification Center, which operates a Utilities notification system for notifying owners of Utilities about Work being performed in the vicinity of their facilities. The Contractor shall notify owners of Utilities prior to the performance of Work in the vicinity of their facilities. The Utilities notification system telephone number is 811 or 1-800-332-2344.

The Contractor shall comply with the rules of the Oregon Utility Notification Center, OAR 952-001-0010 through OAR 952-001-0090, and ORS 757.993. The Contractor may contact the Oregon Utility Notification Center at 503-232-1987 about these rules.

Within the Project limits, there are no anticipated Utility relocations or conflicts.

AGENCY FURNISHED MATERIALS

Materials listed as Agency-furnished will be available to the Contractor free of charge.

The Contractor shall be responsible for all Materials furnished by the Agency and shall pay all demurrage and storage charges. The Contractor shall replace at its expense Agency-furnished Materials lost or damaged due to any cause.

All costs of handling, hauling, unloading, and placing Agency-furnished Material shall be considered included in the price paid for the Pay Item involving such Material.

All Agency-furnished Materials not incorporated into the Work remain the property of the Agency. The Contractor shall deliver such Materials as directed by the Engineer.

• The Agency will furnish “Ecology Blocks” at Republic Services storage yard (49 SE Alder).

• The Agency has installed permanent fencing at the stair landings located on Morrison Street Bridge. Contractor shall remove the fencing and store the materials on site for re-installation by Agency staff. Coordinate with the Project Manager to schedule transfer of materials from site to Agency staff.

APPLICABLE SPECIFICATIONS

The 2024 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.

Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Special Provisions as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:

http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.

Conventions Used Throughout the Specifications - The "2024 Oregon Standard Specifications for Construction", Parts 00200 through 03000, the detailed "Technical Specifications", are generally written in the imperative mood, in which the subject is implied.

Therefore, throughout these Specifications, Parts 00200 through 03000, and on the Plans:

• The subject, "the Contractor", is implied.

• "Shall" refers to action required of the Contractor, and is implied.

• "Will" refers to decisions or actions of the Agency and/or the Engineer.

• “The Engineer” refers to The Chief Engineer of the Agency acting either directly or through authorized representatives. If the Agency has not designated a Chief Engineer, this term denotes the person responsible for administering its public works program.

• The following words, or words of equivalent meaning, refer to the actions of the Agency and/or the Engineer, unless otherwise stated: "allowed", "directed", "established", "permitted", "ordered", "designated", "prescribed", "required", "determined".

• The words "approved", "acceptable", "authorized", "satisfactory", "suitable", "considered", and "rejected", "denied", "disapproved", or words of equivalent meaning, mean by or to the Agency and/or the Engineer, subject in each case to Section 00150 of the General Conditions.

• The words "as shown", "shown", "as indicated", or "indicated" mean "as indicated on the Plans".

CLASS OF PROJECT

This is a State Project.

SECTION 00210 - MOBILIZATION

Comply with Section 00210 of the Standard Specifications modified as follows:

00210.90 Payment - Replace the paragraph that begins “No separate or additional…” with the following paragraph:

No separate or additional payment will be made for any costs associated with obtaining and maintaining access to Doc Express® and AASHTOWare ProjectTM or the use of Doc Express® and AASHTOWare ProjectTM.

SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC

Comply with Section 00220 of the Standard Specifications modified as follows:

00220.01(b) Abbreviations - Delete this subsection.

00220.02(a) General Requirements - Add the following bullet(s) to the end of the bullet list:

• When an abrupt edge is created by excavation, protect traffic according to the "Excavation Abrupt Edge" and the "Typical Abrupt Edge Delineation" configurations shown on the Standard Drawings.

00220.02(b) Temporary Pedestrian Accessible Route Plan - Replace the title of this subsection with “Temporary Pedestrian Accessible Route”

Replace the paragraph that begins "For the safety and accessibility …" with the following paragraph:

For the safety and accessibility of pedestrians, provide and maintain TPAR for pedestrian pathways impacted by construction or construction staging, and the following:

Replace the bullet that begins "TPAR shall meet …" with the following bullet:

• Meet the requirements of Part 6 of the MUTCD.

Replace the bullet that begins "Mount signs between the panels…" with the following bullet:

• Mount signs between the panels of a Type II barricade, on a PCD, or on a single-post temporary sign support, as shown. Place signs facing pedestrian traffic.

Add the following bullet(s) to the end of the bullet list:

• Maintain access to bus stops and Pedestrian Accessible Routes.

00220.03(b) Closures - Add the following bullets to the end of the bullet list:

• Bus Stops - A minimum of 14 days before closing, relocating or modifying a TriMet bus stop. Notify the TriMet Field Operation Coordinator by e-mail at foc@trimet.org

• On Street Parking – Add the following paragraph to the end of the bulleted item:

Apply to the PBOT Permit Center, 503-823-7365, for approval to close any on-street parking space within the workzone. E-mail application to cpac@portlandoregon.gov. Visit www.tsup.info for application details.

• City Streets – A minimum of 28 days before implementing a detour route, and 14 days before installing TCD, within the city of Portland streets. Notify Portland Bureau of Transportation at: movepdx@portlandoregon.gov

• Multnomah County Bridge (Morrison Bridge) - A minimum of 28 days before implementing a detour route, and 14 days before installing TCD, on Multnomah County bridge. Notify Multnomah County Bridge Maintenance Supervisor Carl Morgan at 503-970-1792.

Add the following subsection:

00220.03(c) Ramp and Lane Closure Notifications - Notify the following at least 72 hours before closing any lanes on either the I-5 Northbound ramp or Morrison Bridge:

• The ODOT Project Manager

• Multnomah County Bridge Maintenance Supervisor. 503-970-1792

• Portland Bureau of Transportation Dispatch Center: 503-823-1700

• Portland Bureau of Emergency Management: 503-823-0911

Notify ODOT Traffic Management Operations Center (TMOC), 503-283-5859, when closing one or more lanes on either the I-5 Northbound onramp or Morrison Bridge. Notify the TMOC again when the lanes are opened.

00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:

Traffic Lanes may be closed on the westbound Morrison Bridge when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):

(a) Single Lane Closures - One Traffic Lane on the westbound Morrison Bridge may be closed during the following times:

• Nightly, Friday night through Sunday morning, between 10:00 p.m. and 8:00 a.m.

(b) Ramp Closures – The westbound Morrison Bridge ramp to I-5 North may be closed during the following times:

• Nightly, Friday night through Sunday morning, between 10:00 p.m. and 8:00 a.m.

One Traffic Lane may be closed on all other adjacent Roadways within the Project Site not listed above, when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):

• Nightly, all days, between 10:00 p.m. and 6:00 a.m.

00220.40(e)(2) Opened Lanes - Replace the paragraph that begins "Keep all Traffic Lanes and …" with the following paragraph:

Keep all Traffic Lanes and pedestrian facilities open during the following periods. Remove all barricades and objects from the Roadway during the periods that Traffic Lanes are to remain open.

00220.40(e)(2)(a) Holidays - Replace the paragraph that begins "When a holiday falls …" with the following paragraph:

When a holiday falls on Sunday, the following Monday is recognized as a legal holiday. When a holiday falls on Saturday, the preceding Friday is recognized as a legal holiday.

00220.40(e)(2)(b) Special Events - Add the following to the end of this subsection:

The following special events will occur during this Project:

• Portland Marathon – October 4, 2026, Portland

Verify the dates.

00220.40(e)(2)(c) City of Portland Streets (Moratorium) – Do not close or block any travel lane, on-street parking, or sidewalk on City of Portland Streets during the following times as identified on the Rose Festival or City Holiday Moratorium Map:

• Holiday Moratorium – November 19, 2026 through January 5, 2027

Obtain the moratorium maps and exemption request information at: www.tsup.info

00220.42 Bridge Site Ramp Closure - The Contractor is allowed to close the westbound Morrison Bridge ramp to I-5 North to traffic during the barrier transition work, and stairway removal work under the bridge. The closure is allowed according to the times listed in 00220.40(e)(1)(b), except as specified in 00220.40(e)(2).

Do not close the ramp until all Materials and Equipment are on hand or guaranteed to be delivered so that the Work can be done in an efficient manner with a minimum period of ramp closure.

The ramp closure will not be allowed until the area and the detour route are signed according to the TCP and the requirements of Section 00221 and Section 00222.

00220.45 Load Restrictions on Bridges –

For Structure No. 8589D, limit the combined weight of construction vehicles, Equipment, and daily Material usage to 65,000 pounds for every 1,000 square feet of surface area plus the weight of long term storage of Materials to 25,000 pounds for every 100 square feet of surface area of the Bridge or a total of 200,000 pounds for each span of the Bridge, whichever is less.

The Contractor may request alternate loadings by submitting, 30 Calendar Days before proposed loadings, stamped loading calculations and data according to 00150.35.

Structure No.8589 is on the Restricted Bridge List or has a condition rating of 4 or less. If the Contractor plans to park vehicles or Equipment on the Bridge or store Materials on the Bridge submit, 30 Calendar Days before loading, stamped loading calculations and data according to 00150.35.

00220.60(a)(1) Contractor Responsibility - Replace this subsection, except for the subsection number and title, with the following:

If this Work is not completed and in place, the Agency may do the Work according to 00220.60(d).

(a) Do the following at no additional cost to the Agency:

• Keep surfaces being used by Public Traffic free of all dirt, mud, gravel, materials, and debris.

• Repair damage to surfaces caused by the Contractor's operations.

• Maintain all detour and stage construction Surfacing as specified or directed.

(b) Before periods of no active Work that last longer than seven consecutive Days, unless otherwise directed, do the following:

• Provide temporary pedestrian surfaces meeting the requirements of the MUTCD and Section 00228.

• Provide traversable bicycle and pedestrian routes with surfaces free of dirt, mud, gravel, and debris.

(c) Before periods of no active Work that is anticipated to last or lasts longer than 30 consecutive Days, unless otherwise directed, do the following:

• Pave Traffic Lanes at least 12 feet wide, with 2-foot-wide paved Shoulders for each direction of traffic.

• Do not leave abrupt edges.

• Remove or cover temporary construction signs unless otherwise directed.

• Clean, install, and reinstall all necessary pedestrian, motor vehicle, and bicycle channelization and pavement markings, unless otherwise directed.

00220.60(a)(2) Agency Responsibility - Replace the paragraph that begins "The Agency is responsible …" with the following paragraph:

The Agency is responsible to do the following at Agency expense:

00220.60(b) During Suspensions - Replace the paragraph that begins "During suspensions of the Work …" with the following paragraph:

During suspensions of the Work, maintain Surfacings that the Contractor is responsible for under 00220.60(a)(1), and maintain Work Zone traffic control according to the Specifications and the following:

00220.70 Opening to Traffic - Replace the paragraph that begins "When it is in the public interest, the …" with the following paragraph:

When it is in the public interest, the Engineer may order any portion of the Work opened to traffic. If the portion opened to traffic has been finished in an acceptable manner, it will be designated as "accepted for traffic", and the Contractor will be relieved of maintaining it for legal, Public Traffic. If the portion of the Work to be opened to traffic has not been finished in an acceptable manner, maintain that portion of the Work under traffic in a condition serviceable and adequate for traffic until it is finished in an acceptable manner, except as specified in 00220.60(b).

Replace the paragraph that begins "Maintain portions of the Work designated …" with the following paragraph:

Maintain portions of the Work designated "accepted for traffic" if so ordered. Maintain portions of the Work opened to traffic but not "accepted for traffic" at no additional compensation, except watering ordered to protect the Work or to alleviate dust will be paid for according to Section 00340.

Replace the paragraph that begins "If the Contractor delays the completion …" with the following paragraph:

If the Contractor delays the completion of Shoulders, sidewalks, curb ramps, drainage Structures, or other feature of the Work, the Engineer may order all or any portion of the Work to be opened to traffic. In this case, the Contractor is responsible for maintenance as described in 00220.60(a)(1), during the period the Work is opened to traffic, until Final Acceptance. Conduct the remaining operations to cause the least obstruction to traffic, and pay all additional costs caused by the presence of traffic.

SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL

Comply with Section 00221 of the Standard Specifications modified as follows:

00221.05 Regulations and Codes - Replace this subsection with the following subsection:

Provide all electrical Equipment, Materials, and Work conforming to NEC requirements and all other laws that apply.

00221.06 Traffic Control Plan - Replace this subsection with the following subsection:

00221.06 Traffic Control Plan and Tourist-Oriented Directional and Business Logo Signs -

(a) Traffic Control Plan - Submit one of the following, 5 Calendar Days before the preconstruction conference:

(1) Agency Traffic Control Plan - If the Contractor intends to use the Agency TCP without modification, a written notification indicating that the Agency TCP will be used without modification.

(2) Contractor-Modified Traffic Control Plan - The Contractor may request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor. Do not use a modified TCP, or a TCP developed by the Contractor, unless approved by the Engineer. Use the Agency TCP unless a modified TCP, or a TCP developed by the Contractor is accepted.

The Engineer is not obligated to consider any modified Agency TCP or a TCP developed by the Contractor. The Agency will not be liable to the Contractor for failure to accept or act upon any request for a modified Agency TCP or a TCP developed by the Contractor.

To conserve time and funds, the Contractor may first submit a written request for a preliminary review by the Engineer. The request should contain a description of the proposal together with a rough estimate of anticipated dollar and time impacts. The Engineer will, within a reasonable time, respond to the Contractor in writing whether or not the request would be considered by the Agency.

Meet all requirements of the Contract documents and comply with the Project transportation management plan (TMP) if requesting a Contractor-modified Agency TCP, or a Contractor developed TCP. Provide the following information:

• Stamped Working Drawings according to 00150.35 that include the proposed TCP showing all TCM and quantities of TCD.

• A TPAR plan that includes:

• Details and features used to provide pedestrian accessibility.

• Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.

• Temporary alternate facilities or detour routes for pedestrian traffic.

• Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.

• Proposed order and duration of the TCM.

• A detailed temporary striping plan.

If the Contractor’s request to use a Contractor-modified Agency TCP, or a TCP developed by the Contractor is approved in whole or in part, acceptance will be made by a Change Order.

The Engineer will establish prices that represent a fair measure of the value of Work to be added, changed, or deleted as a result of any accepted modifications to the Agency TCP or an accepted TCP developed by the Contractor.

Once a TCP has been accepted by the Engineer, submit any additional modifications for Agency review following the procedure described above. The Engineer is not obligated to consider additional modifications to a previously approved TCP.

(b) Tourist-Oriented Directional and Business Logo Signs - Submit one of the following for approval, at least 5 Calendar Days before the preconstruction conference:

(1) No Signs - If there are no tourist-oriented directional (TOD) or business logo signs on the Project, a written notification that no TOD or business logo signs exist within the Project limits or

(2) Signs - Submit one copy of a sketch map of the Project showing all existing TOD and business logo signs and a written narrative describing how these signs will be kept in service and protected throughout all the construction stages. If modifications are necessary, submit updated information to the Engineer for approval at least 21 Calendar Days before the change is needed.

00221.10 General - Replace the paragraph that begins “All Work Zone TCD shall…” with the following paragraph:

Provide Work Zone TCD complying with the crashworthiness requirements of the National Cooperative Highway Research Program (NCHRP) Report 350 or with the AASHTO Manual for Assessing Safety Hardware (MASH).

00221.20 Safety Apparel - Replace the paragraph that begins “Workers, except flaggers, working …” with the following paragraph:

Workers, except flaggers, working within Highway Right of Way and exposed to traffic or construction Equipment are required to wear high visibility safety apparel that meets the Performance Class requirements of the most current version of ANSI/ISEA 107, American National Standard for High Visibility Safety Apparel and Headwear Devices. Wear safety apparel that at least meets the following minimum requirements:

00221.40 General - Replace the paragraph that begins “Existing operational TCD’s shall remain…” with the following paragraph:

Maintain existing TCD’s in operation throughout the Contract or until replaced by new, permanent TCD as appropriate.

00221.60 Temporary Traffic Control Devices - Replace the paragraph that begins “TCD delivered to the Project Site found…” with the following paragraph:

Repair or replace TCD delivered to the Project Site found to be in “marginal” or “unacceptable” condition, at no additional cost to the Agency.

00221.90(b) Temporary Protection and Direction of Traffic – Replace the bullet that begins “Providing, Surfacing, maintain…” with the following bullet:

• Providing, surfacing, maintaining, removing, and restoring the TPAR.

00221.98 Payment, Method "B" - Lump Sum Basis - Replace the paragraph that begins "Payment will be payment …" with the following paragraph:

Payment will be payment in full for furnishing, installing, moving, operating, maintaining, inspecting, and removing Materials and TCD, and for providing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS

Comply with Section 00222 of the Standard Specifications modified as follows:

00222.10 Temporary Signs - Replace the paragraph that begins "Furnish temporary signs meeting …" with the following paragraph:

Furnish temporary signs meeting the requirements of the "Acceptable" category shown in the ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features handbook, available from the ATSSA website. Use Materials and fabricate signs according to Section 00940, Section 02910 and the following:

00222.11(b) Portable Sign Supports - Replace the paragraph that begins "Use portable sign supports …" with the following paragraph:

Use portable sign supports from the QPL and according to the following:

00222.12(b) Permanent Signs - Replace the paragraph that begins "Sign covers for permanent signs …" with the following paragraph:

Provide sign covers for permanent signs according to Section 00941.

00222.13 Sign Flags - Replace the paragraph that begins "Sign flags shall be …" with the following paragraph:

Provide sign flags that are:

00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:

• At least ten Calendar Days before closing the sidewalk at SE Morrison St., continuously lasting longer than 24 hours, place a “SIDEWALK CLOSED, Full Time” (CW11-4) sign in advance of each future closure point. Locate the sign so it is legible from the nearest alternate pedestrian pathway facing incoming pedestrian traffic. The sign may be mounted between the panels of a Type II barricade or on a single-post TSS. Do not place the sign or sign support such that it narrows the pedestrian pathway to a width of less than 4 feet.

• Before opening the TPAR, place TPAR signing and other TCM as shown, or as directed. Maintain the “SIDEWALK CLOSED, Full Time” (CW11-4) signs while the TPAR is open to pedestrian traffic.

• At least ten Calendar Days before closing the sidewalk at SE Morrison St., daily for periods less than 24 hours, place a “SIDEWALK CLOSED, Daily” (CW11-5) sign in advance of each future closure point. Locate the sign so it is legible from the nearest alternate pedestrian pathway facing incoming pedestrian traffic. The sign may be mounted between the panels of a Type II barricade, or on a single-post TSS. Do not place the sign or sign support such that it narrows the pedestrian pathway to a width of less than 4 feet.

• Before opening the TPAR, place TPAR signing and other TCM as shown, or as directed. Maintain the “SIDEWALK CLOSED, Daily” (CW11-5) signs while the TPAR is open to pedestrian traffic.

• Install "ROAD WORK AHEAD" (W20-1-48) signs with a 36 by 24-inch "FINES

DOUBLE" (R2-6aP) rider on the SE Morrison St. and on SE Morrison Bridge, according to the "TCD Spacing Table" shown on the Standard Drawings or as modified by the Plans except do not install the "FINES DOUBLE" rider on concrete barrier mounted signs.

• Install beyond each end of the Project, facing outgoing traffic, an "END ROAD WORK"

(CG20-2A-24) sign a distance of (A ÷ 2) according to the "TCD Spacing Table" shown on the Standard Drawings or as modified by the Plans.

• Install two sign flag boards, as shown on the Standard Drawings, above the following detour and road closed advance warning signs, where applicable:

• "DETOUR AHEAD", "DETOUR XXXX FT", "DETOUR X/X MILE" (W20-2) signs.

• "ROAD CLOSED AHEAD", "ROAD CLOSED XXXX FT", "ROAD CLOSED X/X

MILE" (W20-3) signs.

• Install an 18 by 24-inch "NO PARKING" (R8-3a) sign in every block where on-street parking is prohibited, facing incoming traffic.

00222.41(d) Temporary Sign Supports - Replace the bullet that begins "Provide reflective sheeting …" with the following bullet:

• Furnish reflective sheeting on TSS posts as shown in the Standard Drawings.

00222.45(b) Portable Changeable Message Signs - Replace the bullet that begins "Messages shall not scroll …" with the following bullet:

• Do not use messages that scroll horizontally or vertically across the face of the sign.

• At least seven Calendar Days before the ramp closure to I-5 North, place one or more PCMS displaying the following message as shown, or as directed:

Panel 1 Panel 2

RAMP TO MMM DD

I-5 N XX PM TO

CLOSURE XX AM

SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES

Comply with Section 00223 of the Standard Specifications modified as follows:

00223.00 Scope - Replace this subsection, except for the subsection number and title, with the following:

In addition to the requirements of Section 00221, this Work consists of providing flaggers, traffic control supervisors, and providing, operating, and maintaining associated Work Zone traffic control vehicles.

00223.22 Flagger Station Lighting - Replace the paragraph that begins "Use flagger station lighting …" with the following paragraph:

Use flagger station lighting from the QPL and according to the following:

Replace the bullet that begins "Illuminates the flagger so that …" with the following bullet:

• Illuminate the flagger station so that it is visible, and is discernable as a flagger station, from a distance of 1,000 feet.

Replace the bullet that begins "Illuminates the flagger from above …" with the following bullet:

• Illuminate the flagger station from above at a height of 18 feet ± 3 feet.

00223.23 Automated Flagger Assistance Device - Replace the paragraph that begins "Furnish an automated flagger …" with the following paragraph:

Provide an automated flagger assistance device (AFAD) from the QPL. Submit the following information for approval for the use of an AFAD to the Engineer, according to 00150.37, a minimum of 21 Calendar Days in advance of using an AFAD. The Engineer will respond within 14 Calendar Days after receipt of the submittal.

00223.26 Pedestrian Transport Vehicle - Replace the bullet that begins "A roof or post-mounted rotating …" with the following bullet:

• A roof or post-mounted rotating amber light or strobe light that is visible for 360 degrees. Provide a light that is visible and functioning at all times while operating within the Project limits.

00223.31(a) Traffic Control Supervisor - Replace the paragraph that begins "When the Schedule of Items …" with the following paragraph:

When the Schedule of Items includes an item for a TCS, provide a TCS who meets the requirements of 00223.30. Do not designate the Project superintendent as the TCS. The TCS is required to possess a current ODOT "Oregon Certified Traffic Control Supervisor" card. A TCS with a current card from another state's transportation department, or from the American Traffic Safety Services Association, may obtain an Oregon Certified TCS card upon successful completion of ODOT's Recertification Class.

Replace the paragraph that begins "Before beginning Work …" with the following paragraph:

Before beginning Work on the Project, the TCS is required to:

Replace the bullet that begins "File with the Engineer and …" with the following bullet:

• File with the Engineer and local police, their name and a telephone number where the TCS can be contacted at all times.

Replace the bullet that begins "If the Contractor requests to …" with the following bullet:

• If the Contractor requests to use a modified Agency TCP or a TCP developed by the Contractor, ensure stamped Working Drawings showing the revisions are submitted according to 00221.06 and 00150.35.

Replace the paragraph that begins "The TCS shall not act as …" with the following paragraph:

The TCS cannot perform the duties of a flagger or pilot car operator, except in the event of an emergency. The TCS may relieve the flagger or pilot car operator for a period of less than 15 minutes, not to exceed 1 hour per construction work shift.

Replace the paragraph that begins "Make arrangements so that the …" with the following paragraph:

Make arrangements so that the TCS is available every Day, on call at all times, and available upon the Engineer's request at other than normal working hours.

Replace the paragraph that begins "The TCS shall report to the …" with the following paragraph:

The TCS is required to report to the Project Site within 1 hour after being notified in the event of a Work Zone incident during non-work periods. Have appropriate personnel, Equipment, and Material available at all times to expeditiously correct any deficiency in the TCM for the Project.

Replace the paragraph that begins "Notify the Engineer of an alternate …" with the following paragraph:

Notify the Engineer of an alternate TCS who can assume the duties of the assigned TCS in the event of that person's inability to fulfill the duties of the position. Provide an alternate TCS adequately trained and certified according to 00223.30 and 00223.31. Notify the Engineer at least 12 hours before designating the TCS for the following 12-hour period. Make succeeding notifications within 24 hours every time a subsequent TCS is appointed to the Project.

00223.31(b) Traffic Control Inspection Without TCS - Replace the paragraph that begins "When the Schedule of Items does …" with the following paragraph:

When the Schedule of Items does not include an item for a TCS, or when TCS is not on-site for a work shift, designate a trained person who is on the Project Site during work hours and on call at all other times, and who:

Replace the bullet that begins "Notifies the Engineer of any …" with the following bullet:

• Notifies the Engineer of any corrective measures made to the TCP if the TCP is not functioning as required, or to accommodate site conditions. Follow the TCP and do not implement changes to the TCP before revisions are approved by the Engineer.

Replace the bullet that begins "Shall report to the Project …" with the following bullet:

• Reports to the Project Site within 1 hour after being notified in the event of a Work Zone incident during non-work periods.

Replace the bullet that begins "Designate an area for …" with the following bullet:

• Designates an area for pedestrians to wait for, load and unload the transport vehicle.

00223.32 Automated Flagger Assistance Device Operator - Replace this subsection, except for the subsection number and title, with the following:

Use a certified flagger who has been trained in the operation of the AFAD.

The AFAD operator duties include:

• Attending the AFAD at all times during the operation of the device.

• Not flagging traffic and operating an AFAD at the same time.

• Operating a single AFAD. Each AFAD is required to have a separate AFAD operator.

00223.40 Flaggers - Replace this subsection, except for the subsection number and title, with the following:

Locate flaggers far enough in advance of the Work Area to permit adequate time for the motorist to respond to the flagger's instructions. All flaggers, including advance flaggers, are required to use a STOP/SLOW paddle. Do not use roll-up STOP/SLOW paddles for non-emergency flagging operations.

During advance flagging operations, the advance flagger is required to only display the "SLOW" face of the paddle. Cover the "STOP" face of the paddle with a sign cover according to 00222.12(a).

Position flaggers, as directed, at locations where traffic can enter the Highway within the limits of the Work Zone.

Direct vehicles entering the Highway to follow the pilot car line.

Direct pedestrians to wait for flagger instructions. Stop and hold motor vehicle traffic to allow pedestrians to enter the TPAR or exit the TPAR. Ensure pedestrians are clear of all Traffic Lanes before flaggers release motor vehicle traffic.

Direct pedestrians to use the pedestrian transport vehicle to pass through or around the Work Zone. Direct pedestrians to wait for the pedestrian transport vehicle in designated areas identified under 00223.31.

If a TPAR is designed and installed with a width less than 5 feet, and 5-foot-by-5-foot passing spaces at 200-foot intervals are not provided, inform pedestrians of the narrowed TPAR.

Before allowing pedestrians in wheelchairs or similar devices to use the TPAR, direct the flagger at the opposite end of the TPAR to stop and hold opposing pedestrian traffic until the pedestrian in the wheelchair has reached the other end of the narrowed TPAR.

Provide flaggers at flagging stations continuously or until the Engineer determines flagging is no longer required.

00223.41 Flagger Station Lighting - Replace this subsection, except for the subsection number and title, with the following:

Provide continuous flagger station lighting for nighttime flagging as follows:

• Locate the light Equipment on the same side of the Roadway as the flagger station between 5 and 10 feet from the edge of the Traffic Lane, on or beyond the Roadway Shoulder, or as directed.

• Position and orient the flagger station lighting to direct the maximum amount of light toward the flagger station and away from the approaching traffic in the near lane.

• Aim all of the luminaires directly at the flagger station.

• Increase the output wattage or number of luminaires as the luminance from, and number of, surrounding and background lights increases. Do not provide a total output greater than 2,500 watts, unless otherwise directed.

00223.43 Automated Flagger Assistance Device - Replace this subsection, except for the

Use the AFAD to control traffic through the Work Zone and as follows:

• Position the AFAD operator’s control location a safe distance from traffic.

• Install and operate the AFAD according to the manufacturer’s instructions and as shown.

• Do not use the AFAD to control more than one lane of approaching traffic. If necessary, close additional Traffic Lanes, left turn lanes or right turn lanes approaching the AFAD to limit approaching traffic to one lane.

• Provide flagger station lighting when using an AFAD during nighttime hours. Provide flagger station lighting according to 00223.22 and 00223.41.

• Do not use an AFAD to replace a continuously operating temporary traffic control signal. The Engineer may order adjustments to the operation of the AFAD or substitute flagging for the AFAD based on traffic delay, field conditions, and safety concerns.

• When providing an AFAD for each direction of traffic, use AFADs of the same type and from the same manufacturer.

• When an AFAD is not in use during a work shift either turn it off or switch the yellow lens to flash mode. When the AFAD is not in use for more than one work shift, remove it and all accompanying signing from the Roadway.

SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES

Comply with Section 00224 of the Standard Specifications modified as follows:

00224.00 Scope - Replace this subsection, except for the subsection number and title, with the following:

In addition to requirements of Section 00221, this Work consists of providing, installing, moving, maintaining, inspecting, and removing channelizing devices including, but not limited to, tubular markers, conical markers, surface mounted tubular markers, plastic drums, and delineators throughout the Project area as shown or specified.

00224.14 Delineators - Replace the paragraph that begins "Use new delineators from …" with the following paragraph:

Use new delineators from the QPL or salvaged reflectorized delineators (W-1) or (Y-1), as appropriate, and according to the requirements of Section 00840 and the following:

00224.90 Payment - Replace the paragraph that begins "Item (a) includes …" with the following paragraph:

Item (a) includes providing and installing the complete assembly of each device in its initial location and for removing the device from the surface.

Replace the paragraph that begins "Item (b) includes …" with the following paragraph:

Item (b) includes providing new or refurbished devices to replace damaged or missing devices.

Replace the paragraph that begins "In item (e), the type …" with the following paragraph:

In item (e), the type of barricade is inserted in the blank.

Replace the paragraph that begins "Payment will be payment …" with the following paragraph:

Payment will be payment in full for furnishing, installing, moving, operating,…