EXHIBIT 5 SPECIFICATIONS.docx

DOCX document 70 KB Posted

Attached to
Davis Slough three roofs replacement
Solicitation number
S-73000-00018265
Issued by
Coos County, Condon City, Oregon

About this file

This specifications document is issued by the Oregon Department of Transportation (ODOT) for the Davis Slough Maintenance Station Building Roof Replacements project located at 61036 HWY 101 S, Coos Bay 97240, Oregon. The project involves roof replacement of three buildings: Storage Building #04, Maintenance Building #01, and Electrical Storage #03, utilizing metal panel roofing systems with related accessories including fasteners, ridge caps, and eave trim. The contractor shall complete a comprehensive visual inspection of existing roofs prior to commencing work and report any deficiencies not covered in contract documents. Construction operations are limited to 0700-1700 Monday through Friday, with deviations requiring Construction Project Manager (CPM) approval. The CPM is Austin VAN_NETTE (Austin.VAN_NETTE@odot.oregon.gov, 503.507.1394). A preconstruction meeting must be held no later than five business days following the Notice to Proceed (NTP), and progress meetings shall be conducted as directed by the CPM. The contractor is responsible for obtaining and paying for the Coos County Building Department permit. Working hours restrictions, noise limitations, and strict coordination requirements with the CPM govern site operations throughout the project duration.

The specifications establish detailed requirements for submittal procedures, including action and informational submittals with 10-day review periods for initial submissions and resubmittals. Product Data and Shop Drawings must comply with specific standards and include construction details, material descriptions, dimensions, and finishes. The roofing systems specified include exposed-fastener metal roof panels (26-gauge, 36-inch width with Kynar 500 finish), concealed-fastener snap-lock panels (24-gauge, 12 or 16-inch width), and insulated metal roof panels (5-inch thick with polyisocyanurate core). All metal components must utilize corrosion-resistant fasteners with neoprene washers and factory-coated finishes. Gutters and downspouts shall be pre-finished aluminum, 0.032-inch thick, with KYNAR 500 or HYLAR 5000 finish. The contractor must maintain comprehensive waste management practices, with prohibited burning and waste accumulation on-site. Installation tolerances are specified at 1/16-inch for alignment and 1/8-inch for offset tolerances. All work must achieve Substantial Completion with final cleaning, punch list resolution, and submission of As-built Drawings prior to project closeout.

View the file

Other files

File Type Posted
EXHIBIT 6 PLANS~1.pdf PDF
ExhIbit 7 Additional Project Requirements.doc DOC document
00018265 ITB.pdf PDF
00018625 Sample PI Contract.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Davis Slough Maintenance Station Building Roof Replacements

Davis Slough Maintenance Station Building Roof Replacements 61036 HWY 101 S , Coos Bay 97240 Oregon Department of Transportation 885 Airport Rd SE Bldg X Salem, Or 97301-4790

09 October 2026

SPECIFICATIONS GROUP

DIVISION 01 GENERAL REQUIREMENTS

011000 SUMMARY

012500 SUBSTITION PROCEDURES

013100 PROJECT MANAGEMENT AND COORDINATON

013300 SUBMITTAL PROCEDURES

015000 TEMPORARY FACILITIES AND CONTROLS

017300 EXECUTION

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017700 CLOSEOUT PROCEDURES

017839 PROJECT RECORD DOCUMENTS

DIVISION 02 EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION

DIVISION 07 THERMAL AND MOISTURE PROTECTION

072100 THERMAL INSULATION

074000 SNAPLOCK ROOFING PANELS

074113.13 EXSPOSED FASTENER METAL ROOFING PANELS

074113.16 CONCEALED FASTENER METAL ROOF PANELS

074116 INSULATED ROOFING PANELS

077123 EXTRUDED GUTTERS AND DOWNSPOUTS

SECTION 011000 - SUMMARY

GENERAL

SUMMARY

Section Includes:

Project information.

Work covered by Contract Documents.

Time of commencement and completion.

Contractor's use of site and premises.

Excessive noise.

Coordination with occupants.

Work restrictions.

Specification and Drawing conventions.

Related Requirements:

Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

PROJECT INFORMATION

Project Identification: Davis Slough Maintenance Station Roof Replacements.

Project Location: 61036 HWY 101 S , Coos Bay 97240 Owner: Oregon Department of Transportation, 885 Airport Rd SE Bldg X, Salem, Oregon.

Construction Project Manager (CPM): Oregon Department of Transportation, 885 Airport Rd SE, Bldg. X, Salem, Oregon, 97301.

CPM: Austin VAN_NETTE, Austin VAN_NETTE@odot.oregon.gov, 503.507.1394.

WORK COVERED BY CONTRACT DOCUMENTS

The Work of Project is defined by the Contract Documents and consists of the following:

The project consists of the roof replacement of three building that include Storage Building #04, Maintenance building #01, and Electrical storage #03. See plans for different metal panel application areas.

Contractor shall provide related accessories such as fasteners ridge cap and eave trim as required for a complete installation.

TIME OF COMMENCEMENT AND COMPLETION

Notice to proceed: A written notice to proceed will be provided by ODOT to the Contractor as indicated in the invitation to bid. The Contractor shall begin the work upon receipt of the notice to proceed. Notwithstanding any other provision of the contract the Owner shall not be obligated to accept or to pay for any work furnished by the Contractor prior to delivery of notice to proceed, whether or not the Owner has knowledge of the furnishing of work.

Prior to beginning any roofing work the contractor shall provide a complete visual inspection of the roof and report any deficiencies not covered in the contract documents to the CPM.

CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS

Contractor shall be supplied electronically, with one set of full-size drawings, half size reduced drawings and specifications. At least one complete set of contract documents, including one full-size set of drawings shall be kept at the site of construction in good condition, and at all times available to the CPM.

PERMITS AND FEES

It shall be the responsibility of the contractor to submit for, obtain, and pay for the Coos County Building Department permit.

CONTRACTOR'S USE OF SITE AND PREMISES

Construction Operating Hours: Operating hours shall be limited to 0700 to 1700 Monday through Friday. Deviations from noted hours shall be with approval by CPM.

Limits on Use of Site: Contractors lay down/staging area will be coordinated through CPM. Do not disturb portions of Project site beyond areas in which the Work is indicated.

Driveways, Walkways, Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

EXCESSIVE NOISE

All equipment shall have muffling devices in good working order at all times. Equipment not so equipped will be removed from site.

Cooperate with Owner in locating high noise producing equipment in areas least offensive and/or provide sound enclosure or shielding to dampen sound.

Playing of loud music or similar noise will not be allowed at the work site.

WORK RESTRICTIONS

Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

Notify CPM not less than two days in advance of proposed utility interruptions.

Obtain CPM permission in writing before proceeding with utility interruptions.

Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.

Notify CPM not less than two days in advance of proposed disruptive operations.

Obtain CPM written permission before proceeding with disruptive operations.

Smoking and Controlled Substance Restrictions: Use of tobacco products , alcoholic beverages, and other controlled substances on Project site is not permitted.

PRODUCTS (Not Used) EXECUTION (Not Used)

END OF SECTION 01100

SECTION 012500 - SUBSTITUTION PROCEDURES

1. Substitution Requests.

a. Substitution requests shall be made only by the General Contractor

b. Substitution Requests shall be submitted to the Purchaser identified in Oregon Buys.

c. Substitution requests shall be allowed only during bidding process.

d. Substitution requests shall be submitted to the Purchaser within the timeline specified in the Invitation to Bid.

e. PCS will request additional information or issue acceptance or rejection within two days.

f. Documentation:

1) Justification.

2) Coordination information.

3) Detailed comparison.

4) Product Data.

5) Samples.

6) Certificates and qualification data.

7) List of similar installations.

8) Material test reports.

9) Research reports.

10) Detailed comparison of Contractor's construction schedule.

11) Cost information.

2. SUBSTITUTIONS

a. Substitutions for Convenience: Not allowed.

PRODUCTS (Not Used)

END OF SECTION 012500

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

SUMMARY

Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

Description General coordination procedures.

Coordination drawings.

Requests for Information (RFI's).

Project meetings.

Terms

DESCRIPTION

The Contractor shall coordinate with the CPM during the duration of the project.

The Contractor will be responsible for keeping the CPM informed of all activity throughout the project identified in this Contract.

GENERAL COORDINATION PROCEDURES

Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

Coordinate delivery and storage of metal roof panels with CPM.

Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

Make adequate provisions to accommodate items scheduled for later installation.

Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

Preparation of Contractor's construction schedule.

Preparation of the schedule of values.

Installation and removal of temporary facilities and controls.

Delivery and processing of submittals.

Progress meetings.

Preinstallation conferences.

Project closeout activities.

QUALITY ASSURANCE

Throughout the progress of the work, the Contractor shall provide all necessary personnel thoroughly familiar with the Specifications and Drawings, completely trained and experienced in the necessary skills, who shall be present at the site and direct all work performed.

Conditions of Surfaces: Surfaces previously prepared or installed by another trade shall be inspected carefully before applying subsequent materials or finishes. If an unsatisfactory condition to that finish exists, notify the General Contractor and CPM in writing immediately. Otherwise assume full responsibility for resulting appearance, condition and acceptance of finished surfaces.

Covering Up: No Contractor or Subcontractor shall cover up work or conceal work of other Contractor/Subcontractor until same has been inspected and/or approved.

REQUEST FOR INFORMATION (RFI)

General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

CPM will return without response those RFIs submitted by other entities controlled by Contractor.

Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

Owner name.

Project Name Name of CPM.

Date.

Name of Contractor.

RFI number, numbered sequentially.

RFI subject.

Specification Section number and title and related paragraphs, as appropriate.

Drawing number and detail references, as appropriate.

Field dimensions and conditions, as appropriate.

Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state schedule and cost impact in the RFI.

Contractor's signature.

Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

RFI Forms: Electronic format containing information as noted above. Software-generated form with substantially the same content as indicated above, acceptable to the CPM.

RFI's will be reviewed to determine action required, and response. Allow five days for CPM response to each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

The following Contractor-generated RFIs will be returned without action:

Requests for approval of submittals.

Requests for approval of substitutions.

Requests for approval of Contractor's means and methods.

Requests for coordination information already indicated in the Contract Documents.

Requests for adjustments in the Contract Time or the Contract Sum.

Requests for interpretation of review actions on submittals.

Incomplete RFIs or inaccurately prepared RFIs.

CPM's action may include a request for additional information, in which case CPM's time for response will date from time of receipt.

CPM's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal in accordance with General Provisions.

If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify CPM in writing within three days of receipt of the RFI response.

PROJECT MEETINGS

General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

Preconstruction Meeting: A preconstruction meeting, before starting construction, at a time convenient to Owner and CPM, but no later than five business days following NTP.

Attendees: Authorized representatives of Owner and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

Agenda: Discuss items of significance that could affect progress, including the following:

Responsibilities and personnel assignments.

Tentative construction schedule.

Coordination between Contractor and CPM.

Critical work sequencing and long lead items.

Designation of key personnel and their duties.

Lines of communications.

Procedures for processing field decisions and Change Orders.

Procedures for RFIs.

Procedures for processing Applications for Payment.

Distribution of the Contract Documents.

Submittal procedures.

Preparation of Record Documents.

Use of the premises.

Work restrictions.

Working hours.

Owner's occupancy requirements.

Responsibility for temporary facilities and controls.

Construction waste management and recycling.

Parking availability.

Office, work, and storage areas.

Equipment deliveries and priorities.

First aid.

Security.

Progress cleaning.

Minutes: Contractor shall record and distribute meeting minutes.

Progress Meetings: Conduct progress meetings as directed by CPM .

Attendees: In addition to representatives of Owner , each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

TERMS

"APPROVED" as used herein means "approved by the ODOT CPM.

'FOR APPROVAL" means "for the CPM approval."

"SELECTED" means "selected by the CPM."

"PROVIDE" means "furnish and install."

Where words "or approved" ae used, Construction Project Manager is sole judge of quality and suitability of proposed alternate or substitution.

"CONSTRUCTION PROJECT MANAGER" (CPM) refers to the individual selected by ODOT to manage the project.

"Project Coordination" refers to the on-site individual (if) selected by ODOT to be the local liaison the contractor.

"INSTALL" means "furnish and install."

Items noted as "N.I.C." are "Not in Contract" and will be furnished and installed by Owner or others.

PRODUCTS (Not Used)

END OF SECTION 013100

SECTION 013300 - SUBMITTAL PROCEDURES

SUMMARY

Section Includes:

Submittal schedule requirements.

Administrative and procedural requirements for submittals.

DEFINITIONS

Action Submittals: Written and graphic information and physical samples that requires responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

Informational Submittals: Written and graphic information and physical samples that do not require responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

SUBMITTAL SCHEDULE

Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by CPM and additional time for handling and reviewing submittals required by those corrections.

SUBMITTAL FORMATS

Submittal Information: Include the following information in each submittal:

Project name.

Date.

Name of Contractor.

Names of subcontractor, manufacturer, and supplier.

Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.

Number and title of Specification Section, with paragraph number and generic name for each of multiple items.

Drawing number and detail references, as appropriate.

Indication of full or partial submittal.

Signature of transmitter.

Options: Identify options requiring selection by CPM.

Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by CPM on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

Submittals shall be electronic.

SUBMITTAL PROCEDURES

Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

Email: Prepare submittals as PDF package, and transmit to CPM by sending via email. Include PDF transmittal form. Include information in email subject line as requested by CPM.

Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

Resubmittal Review: Allow 10 days for review of each resubmittal.

Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.

SUBMITTAL REQUIREMENTS

Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

Mark each copy of each submittal to show which products and options are applicable.

Include the following information, as applicable:

Manufacturer's catalog cuts.

Manufacturer's product specifications.

Standard color charts.

Statement of compliance with specified referenced standards.

Testing by recognized testing agency.

Application of testing agency labels and seals.

Notation of coordination requirements.

Availability and delivery time information.

For equipment, include the following in addition to the above, as applicable:

Wiring diagrams that show factory-installed wiring.

Printed performance curves.

Operational range diagrams.

Clearances required to other construction, if not indicated on accompanying Shop Drawings.

Submit Product Data before Shop Drawings, and before or concurrent with Samples.

Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

Identification of products.

Schedules.

Compliance with specified standards.

Notation of coordination requirements.

Notation of dimensions established by field measurement.

Relationship and attachment to adjoining construction clearly indicated.

Seal and signature of professional engineer if specified.

CONTRACTOR'S REVIEW

Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CPM.

Contractor's Approval: Indicate Contractor's approval for each submittal with contractors approval stamp . Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

CPM will not review submittals received from Contractor that do not have Contractor's review and approval.

ODOT REVIEW

Action Submittals: CPM will review each submittal, indicate corrections or revisions required.

PDF Submittals: CPM will indicate, via markup on each submittal, the appropriate action as follows:

Submittals will be returned marked Approved, Approved as Noted, Revise and Resubmit. Incomplete submittals will be marked Rejected and not reviewed.

Informational Submittals: CPM will review each submittal and will not return it, or will return it if it does not comply with requirements. CPM will forward each submittal to appropriate party.

Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from CPM.

Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.

Submittals received from sources other than Contractor will be returned without review.

Submittals not required by the Contract Documents will be returned by CPM without action.

PRODUCTS (Not Used)

END OF SECTION 013300

SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS

USE CHARGES

Water Service: Available from existing system without charge.

Electric Power Service: Available from existing system without charge.

TEMPORARY FACILITIES

Field office as required by contractor.

EQUIPMENT

Fire extinguishers.

TEMPORARY UTILITY INSTALLATION

Sanitary Facilities: Provide temporary toilets and wash facilities for all workers and inspectors.

Electric Power Service: Provide suitable construction grade extension cords as required to connect to existing facilities.

Lighting: Provide temporary lighting as required.

SECURITY AND PROTECTION FACILITIES INSTALLATION

Provide security fencing around staging and materials storage area at contractor's option.

END OF SECTION 015000

SECTION 017300 - EXECUTION

SUMMARY

Section includes general administrative and procedural requirements governing execution of the Work, including, but not limited to, the following:

Construction layout.

Installation of the Work.

Cutting and patching.

Progress cleaning.

Protection of installed construction.

Correction of the Work.

DEFINITIONS

Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.

QUALITY ASSURANCE

Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

Structural Elements: Do not cut structural elements.

Existing Elements: Neatly cut existing insulation and install new insulation materials in a neat manner.

PRODUCTS

MATERIALS

Comply with requirements specified in other Sections.

Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

EXECUTION

EXAMINATION

Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

PREPARATION

Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CPM in accordance with requirements in Section 013100 "Project Management and Coordination."

CONSTRUCTION LAYOUT

Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings.

INSTALLATION

Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

Comply with Taylor Metals written instructions and recommendations for installing products in applications indicated.

Install products at the time and under conditions that will ensure satisfactory results as judged by CPM. Maintain conditions required for product performance until Substantial Completion.

Coordinate construction operations with CPM to assure minimal impacts on continuing operations.

Sequence the Work and allow adequate clearances to accommodate movement of construction items on-site and placement in permanent locations.

Tools and Equipment: Select tools or equipment that minimize production of excessive noise levels.

PROGRESS CLEANING

Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.

Site: Maintain Project site free of waste materials and debris.

Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work.

Remove liquid spills promptly.

Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.

Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

Exposed Surfaces: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways.

During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

PROTECTION OF INSTALLED CONSTRUCTION

Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by construction are maintained in condition that existed at commencement of the Work.

Comply with manufacturer's written instructions for temperature and relative humidity.

CORRECTION OF THE WORK

Repair or remove and replace damaged, defective, or nonconforming Work. Restore damaged substrates and finishes.

Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

Repair Work previously completed and subsequently damaged during construction period. Repair to like-new condition.

Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.

END OF SECTION 017300

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

SUMMARY

Section includes administrative and procedural requirements for the following:

Disposing of nonhazardous demolition and construction and waste.

DEFINITIONS

Construction Waste: Building, structure, and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

Follow CPM direction for disposal or on site storage of ODOT supplied metal panels not required for this project..

Disposal: Removal of demolition or construction waste and subsequent salvage, sale, recycling, or deposit in a landfill.

PRODUCTS

NOT USED

EXECUTION

IMPLEMENTATION

Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work.

DISPOSAL OF WASTE

General: Except for items or materials to be salvaged or recycled, remove waste materials from Project site and legally dispose of them off site.

Do not allow waste materials that are to be disposed of accumulate on-site.

Coordinate disposal of excess metal panels with CPM.

Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

Burning: Do not burn waste materials.

END OF SECTION 017419

SECTION 017700 - CLOSEOUT PROCEDURES

SUMMARY

Section includes administrative and procedural requirements for Contract closeout, including, but not limited to, the following:

Substantial Completion procedures.

Final completion procedures.

Warranties.

Final cleaning.

Related Requirements:

Section 017839 "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.

CLOSEOUT SUBMITTALS

Certificates of Release: From authorities having jurisdiction.

SUBSTANTIAL COMPLETION PROCEDURES

Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's "punch list"), indicating the value of each item on the list and reasons why the Work is incomplete.

Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.

Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

Complete final cleaning requirements.

Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual defects.

PRODUCTS

MATERIALS

Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

EXECUTION

FINAL CLEANING

Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

Cleaning: Employ experienced workers for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project:

Clean Project site of rubbish, waste material, litter, and other foreign substances.

Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

Leave Project clean and ready for occupancy.

REPAIR OF THE WORK

Complete repair and restoration operations required by Section 017300 "Execution" before requesting inspection for determination of Substantial Completion.

END OF SECTION 017700

SECTION 017839 - PROJECT RECORD DOCUMENTS

SUMMARY

Section includes administrative and procedural requirements for Project Record Documents, including the following:

As-built Drawings.

CLOSEOUT SUBMITTALS

As-built Drawings: Comply with the following:

Number of Copies: Submit one copy of Contractors As-built Drawings .

Submit copies of As-built Drawings as follows:

Initial Submittal:

Submit one paper-copy of updated As-built Drawings.

PRODUCTS (Not Used)

END OF SECTION 017839

SECTION 024119 - SELECTIVE DEMOLITION

SUMMARY

Section Includes:

Demolition and removal of selected portions of building or structure.

Salvage of existing items to be reused or recycled.

MATERIALS OWNERSHIP

Unless otherwise indicated, demolition waste becomes property of Contractor.

PREINSTALLATION MEETINGS

Pre-demolition Conference: Conduct conference at Project site.

FIELD CONDITIONS

Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

Notify CPM of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

Storage or sale of removed items or materials on-site is not permitted.

Arrange selective demolition schedule so as not to interfere with Owner's operations.

PRODUCTS

Not used.

EXECUTION

EXAMINATION

Verify that existing loose materials have been removed prior to starting work.

SELECTIVE DEMOLITION

General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping.

Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

Dispose of demolished items and materials promptly.

Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

Removed and Reinstalled Items:

Clean and repair items to functional condition adequate for intended reuse.

Protect items from damage during transport and storage.

Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

CLEANING

Remove demolition waste materials from Project site Do not allow demolished materials to accumulate on-site.

Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

Burning: Do not burn demolished materials.

Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

SECTION 072116 - THERMAL INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Glass or mineral-fiber blanket insulation.

2. Match existing blanket insulation type and facing.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of specified product.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire Propagation Characteristics: Passes ASTM E 84 Standard Test Method for Surface Burning Characteristics of Building Materials (Flame spread 25 or less, smoke developed 50 or less).

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.

3.2 INSTALLATION OF INSULATION IN FRAMED CONSTRUCTION

A. Blanket Insulation: Install in cavities formed by framing members in accordance with the following requirements:

1. Use insulation widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill the cavities, provide lengths that will produce a snug fit between ends.

2. Place insulation in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.

3. Maintain 3-inch clearance of insulation around recessed lighting fixtures not rated for or protected from contact with insulation.

END OF SECTION 072116

SECTION 074113.13 – EXPOSED FASTENER METAL ROOF PANELS

PART 1 - GENERAL

1.1 GENERAL

A. SUMMARY:

1. Corrugated-profile, exposed-fastener metal roof panels.

2. Underlayment as recommended by roofing manufacturer.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of specified product.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of panel and accessory.

B. Shop Drawings:

1. Include fabrication and installation layouts of metal roof panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories.

1.3 CLOSEOUT SUBMITTALS

A. Maintenance Data: For metal roof panels.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: Installer specializing in performing the work of this section with minimum of five years of experience.

B. Letter from roofing systems manufacturer, with current date, indicating roofing installer is approved to install roofing systems.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Protect panels from accelerated weathering by removing or venting plastic shipping sheet wrap.

B. Store prefinished materials off ground and protected from weather. Prevent twisting, bending or abrasion, and provide ventilation to stored materials. Slope metal sheets to ensure drainage.

Store accessories off ground and protected from weather.

Prevent contact with materials that may cause discoloration or staining of materials.

PROJECT CONDITIONS

Coordinate the Work with work from other sections.

Coordinate the Work with existing roof penetractions

PRODUCTS

EXPOSED-FASTENER METAL ROOF PANELS, GENERAL

Basis of Design: Taylor Sheet Metal: Rolled-Rib.

Manufacturers of products meeting project specifications will be considered.

Metallic-Coated Steel Sheet: 26-gauge metal roof panels with exposed fasteners. Panels to be 36 inches in width, striated profile.

Ridge cap, eave and roof edge flashings, sealant and miscellaneous materials required for a complete installation. Match metal roof panels in color and finish.

Exterior Finish Coating: Panel manufacturer’s standard Kynar 500 Paint System.

Panel Back Coating: Panel manufacturer’s standard polyester wash coat.

Fasteners: Factory-coated steel fasteners with neoprene washer complying with corrosion-resistance provisions for fastening to roof deck.

UNDERLAYMENT

Underlayment as recommended by roofing manufacturer.

EXECUTION

EXAMINATION

Verify building framing members are ready to receive panels.

Install panels in continuous lengths.

Provide butyl sealant bead at sealant joints.

Install panels from east to west and/or north to south depending on building orientation. Verify lap direction with Construction Project Manager prior to starting installation.

Make cuts where required with shearing tools. Abrasive cutting is not allowed.

Install required flashings as required for a complete roofing installation.

ERECTION TOLERANCES

Installation Tolerances: Shim and align metal roof panel units within installed tolerance of 1/16-inch on slope and location lines and within 1/8-inch offset of adjoining faces and of alignment of matching profiles

CLEANING

Remove temporary protective coverings and strippable films, if any, as metal roof panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal roof panel installation, clean finished surfaces as recommended by metal roof panel manufacturer. Maintain in a clean condition during construction.

PROTECTION

Replace metal roof panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

END OF SECTION 074113.13

SECTION 076113.16 – CONCEALED FASTENER METAL ROOF PANELS

SECTION INCLUDES

Manufactured concealed fastener snap-lock metal roofing panels.

Related ridge cap, flashings, sealants and accessory components as required to provide complete roofing and interior panel installation.

ACTION SUBMITTALS

Product Data: For each type of product to be provided.

Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of panel and accessory.

SHOP DRAWINGS

Include fabrication and installation layouts or metal roof panels, details of edge conditions, joint, panel profiles, corners, anchorages, attachment system, trim, flashing, closures and accessories.

CLOSEOUT SUBMITTAL

Maintenance Data: For metal roof panels.

QUALITY ASSURANCE

Installer Qualifications: Installer specializing in performing the work of this section with a minimum of five years of experience.

DELIVERY, STORAGE, AND PROTECTION

Protect panels from accelerated weathering by removing or venting plastic shipping sheet wrap.

Store prefinished materials off ground and protected from weather. Prevent twisting, bending, or abrasion, and provide ventilation to stored materials. Slope metal sheets to ensure drainage.

Store accessories off ground and protected from weather.

Prevent contact with materials that may cause discoloration or staining of products.

PROJECT CONDITIONS

Coordinate the Work with work of other sections.

Coordinate the Work with existing roof penetrations.

PRODUCTS

MANUFACTURED METAL PANEL ROOF SYSTEM

Complete system to include preformed metal roof panels with concealed fasteners installed over glass fiber batt insulation.

Ridge cap and required trim: Same material, thickness and finish as exterior sheets; brake formed to required profiles.

Color as selected by the CPM.

MATERIALS

Basis of Design: Taylor Sheet Metal: Easy Lock System Taylor Metal Products.

Manufacturers of products meeting product specifications will be considered.

Metal Roof Panels 24-gauge metal roof panels with concealed fasteners 1” high snap lock standing seam detail. Panels to be 12 or 16 inches in width, striated profile.

Ridge cap, eave flashings, butyl sealant and miscellaneous materials required for a complete installation. Match metal roof panels in color and finish.

Exterior Finish Coating: Panel manufacturer's standard Kynar 500 Paint System.

Panel Back Coating: Panel manufacturer's standard polyester wash coat.

ACCESSORIES

Sealants: Butyl Sealant as recommended by panel manufacturer.

Concealed fasteners: Manufacturers standard type as recommended by panel manufacturer.

Field Touch-up Paint: As recommended by panel manufacturer.

EXECUTION

EXAMINATION

Verify building framing members are ready to receive panels.

INSTALLATION

Install approved weather barrier over plywood roof sheathing.

Install panels in continuous lengths.

Provide butyl sealant bead at panel joints.

Install panels from east to west and/ or north to south depending on building orientation. Verify lap direction with Construction Project Manager prior to starting installation.

Make cuts where required with shearing tools. Abrasive cutting is not allowed.

Install required flashings as required for a complete roofing installation.

TOLERANCES

Maximum offset from true alignment between adjacent members butting or In Line: 1/16 inch.

Maximum Variation from plane or location indicated on Drawings: 1/4 inch.

CLEANING

Remove site cuttings from finish surfaces.

Clean and wash prefinished surfaces with mild soap and water; rinse with clean water.

END OF SECTION 076113.16

SECTION 074116 - INSULATED METAL ROOF PANELS

SUMMARY

Steel faced, polyisocyanurate foamed-in-place insulated metal roof panels.

Accessories include fasteners, perimeter trim and penetration treatments, gutters, downspouts and other materials for a complete installation.

ACTION SUBMITTALS

Product Data: For each type of product.

Shop Drawings: Include fabrication and installation layouts of metal panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories; and special details.

Panel Analysis: Provide panel calculations to verify panels will withstand the manufacturers calculated wind loads without detrimental effects or deflection exceeding L/240. Include effects of thermal differential between the exterior and interior panel facings and resistance to fastener pullout.

Quality Assurance Submittals:

Installer Qualifications: Installer specializing in performing the work of this section with a minimum of five years of experience.

Letter from roofing systems manufacturer, with current date, indicating roofing installer is approved to install roofing systems.

ADMINISTRATIVE REQUIREMENTS

Pre-installation meeting: Conduct a pre-installation meeting at the job site including Panel Installer, and Contractors of related trades. Coordinate structural support requirements in relation to insulated roof panel system, installation of any separate air/water barriers, treatment of fenestration, and other requirements specific to the project.

CLOSEOUT SUBMITTALS

Maintenance data.

DELIVERY, STORAGE AND HANDLING

Deliver panel materials and components in manufacturer's original, unopened, undamaged packaging with identification labels intact.

Store roof panels on dry, level, firm and clean surface. Stack no more than two bundles high. Elevate one end of bundle to allow moisture run-off, cover and ventilate to allow air to circulate and moisture to escape.

WARRANTY

Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal panel systems that fail in materials or workmanship within specified warranty period.

Warranty Period: Two years from date of Substantial Completion.

Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.

Finish Warranty Period: 20 years from date of Substantial Completion.

PRODUCTS

MANUFACTURER

Basis of Design: Kingspan KingSeam roof panels.

Kingspan Insulated Panels, Inc., 726 Summerhill Drive, Deland, FL 32724 (888-882-5862); 2000 Morgan Road, Modesto, CA 95358 (800-377-5110) (www.kingspanpanels.us).

Manufacturers of products meeting product specifications will be considered.

STANDING SEAM ROOF PANELS

Design Criteria – Roof Panels:

Panel Assembly Description:

Panel thickness: 5 inches thick.

Panel width: 40 inches.

Panel length: As indicated on drawings.

The side joint shall consist of a 2-inch vertical side lap, mechanically seamed, with fasteners and attachment clip completely concealed within the side joint.

Exterior Face of Panel:

Material: AZ50/Galvalume/Zincalume per ASTM A 792. Minimum Grade 33.

Texture: Smooth (non-embossed).

Gauge: 24 gauge.

Exterior Finish: Kynar 500 finish.

Color: Selected from current manufacturers Insulated Panels standard color chart.

Interior Face of Panel:

Material: AZ35/Galvalume/Zincalume per ASTM A792 minimum Grade 33.

Texture: Smooth (non-embossed).

Gauge: 24 gauge.

Interior Finish: PVDF finish, dry film thickness of 1.0 mil including primer.

Color: White.

Insulating Core: Manufacturer’s standard foam core insulation system.

Fasteners:

Self drilling fasteners shall be corrosion resistant plated steel, designed to resist maximum negative pulloff loads and hold the face sheet mechanically to the structural support.

Panel attachment clip shall be one piece and fully concealed within the panel side joint. Clip shall be a minimum 24 gauge stainless steel.

Perimeter Trim and Penetration Treatments: All required trim, gutters, downspouts and metal flashing with same coating, color, and gauge as the exterior face of the insulated metal roof panel.

Butyl Tape: Per panel manufacturer’s recommendations for panel to panel and panel to trim seal.

Butyl Sealants: Non-skinning type per panels manufacturer’s recommendations.

FABRICATION

General: Fabricate and finish metal panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.

Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.

Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's recommendations and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated.

EXECUTION

EXAMINATION

Contractor shall inspect existing structure and support prior to installing the insulated metal roof panels. Report any concerns and findings to the Construction Project Manager prior to construction.

Examine individual panels upon removing from the bundle; both edges should be visually examined, and any slight overfill of insulation should be carefully removed.

PREPARATION

Remove protective film before installation, or immediately thereafter to prevent sunlight damage.

Cut panels, where indicated on shop drawings, using a power circular saw with fine tooth carbide tip blades or a band saw prior to installation. Ventilate area where polyurethane dust is generated. Personnel should wear respiratory and eye protection devices.

METAL PANEL INSTALLATION

Lap-Seam, Foamed-Insulation-Core Metal Roof Panels: Fasten insulated metal roof panels to supports with fasteners at each lapped joint at location and spacing recommended by manufacturer.

Apply butyl sealant vapor seal around interior perimeter of roof assembly per panel manufacturer’s instructions.