Exhibit 4: Erosion and Sediment Control

IPM, Erosion Control, Landscape Management Plan

Used only when Contractor is required to perform activities that disturbs the existing grounds conditions

The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an IPM Erosion Control, Landscape Management

Plan outlining how this will be accomplished. At a minimum, the landscaping services portion of the plan shall address the following items:

- Goals and Scope

- Responsible Parties

- Guidance for Resources and Implementation

- Performance Measurement

- Training

- Chemical Treatment Purchasing and Application

- Integrated Pest Management (IPM)

- Erosion and Sediment Control

- Storm-Water Management Plan

- Landscape Management and Grounds Maintenance

- Composting